Views
2 months ago

Insulate Magazine Issue 11 - October 2017

When is an Insulation Manufacturer not and Insulation Manufacturer headlines the October issue of Insulate Magazine. Possibly the best front cover for an Insulation publication EVER.

The only independent

The only independent insulation industry trade magazine Darren Evans Assessments The project teams are not always forthcoming with BREEAM evidence, and often when they do send evidence in it is incorrect or incomplete. With the other pressures of the build, the BREEAM requirements seem to be a low priority and it is left until the ‘last minute’ to get information back to the assessor therefore making it harder to gather the evidence and incurring a higher risk of losing credits, which results in not meeting the necessary BREEAM rating. This causes great stress to the design team and even the end client. In an ideal situation from a sustainability point of view there should be a requirement that a given percentage of a dwellings total energy demand needs to be provided through on site renewables. To tackle this, the client could appoint a BREEAM Accredited Professional /Sustainability Champion at the early design stages and throughout the project to ensure the whole project team are aware of what is needed and guarantee the design team incorporate the necessary details into the design drawings and specifications. This person should also proactively gather the required information from the various design team members. This will make it easier for the Design Stage assessments to be completed and allow contractors to focus on the Post Construction Assessment. They can highlight particular credits where evidence needs to be collated throughout the project. member who is dedicated to BREEAM evidence collation to ensure BREEAM credits are not lost, so any day-to-day issues or changes can be assessed. Having regular BREEAM team meetings, either by phone or in person, to check the process is moving forward will ensure it remains a high priority throughout the project. A Future Policy To improve the planning situation in relation to energy and sustainability in the built environment, it would be beneficial to see a nationwide policy rolled out which set out the requirements for these planning conditions. This way it would not come as a surprise to developers that they need to include renewable and low/zero carbon technologies with every development. In an ideal situation from a sustainability point of view there should be a requirement that a given percentage of a dwellings total energy demand needs to be provided through on site renewables. For any support on your projects regarding energy and sustainability, please get in touch with us at www.darren-evans.co.uk Contractors could appoint a project team 36 www.insulatenetwork.com

THE SHOW FOR PEOPLE WHO BUILD 100+ EXCLUSIVE PRODUCT LAUNCHES FREE TO ATTEND 10 - 12 OCT 2017 • NEC BIRMINGHAM Discover 10,000+ innovative products and services from 650+ exhibitors Join 30,000+ Contractors, Developers, Housebuilders and Local Authorities GET YOUR FREE TICKET buildshow.co.uk IN ASSOCIATION WITH: PART OF UK CONSTRUCTION WEEK 2017