Views
7 months ago

CAPITOL TECHNICAL GUIDE v3

TRACK BIFOLD OUTSIDE

TRACK BIFOLD OUTSIDE MOUNT cont. 24. Cover screw holes with screwcap stickers and gap fill if necessary to finish off. 25. Operate all louvre tilts and operate panels several times to make sure all components are working correctly. 26. Clean shutters and work space. TRACK BYPASS INSTALLATION The box out board system for track shutters is supplied loose (not pre-assembled) for installation onsite. This benefits the fitter who may need to make adjustments onsite, where pre-assembled kits have no room for adjustment. Standard framing inclusions are: • Headboard, 2 x sideboards and bottom board if required. • Fascia plus returns for outside mount. • Metal headboard support brackets. • 1 x length hang strip to support the headboard for outside mount • 2 x lengths light block to use as sideboard supports or for extra light blocking There are multiple methods to mount track shutters so we will cover the most common here. INSIDE MOUNT: 1. Lay all of the framing pieces (boards) face up on the floor or your workspace. 2. Screw from above the headboard down into the sideboards. 3. Screw from sideboards into the bottom board if applicable. 4. Lift the assembled box unit and place inside the recess in your measured position. 5. Screw up into the recess from the underside of the headboard to tack into place with fixing screws, taking care not to screw all the way into place. 6. Make necessary adjustments to ensure box out frame is level. 7. Drive headboard fixing screws in all the way. 8. Screw through the sideboards into the wall or architrave. 9. If no bottom board supplied, attach bottom tracks by measuring the distance from the edge of headboard to centre of each track and position the bottom tracks the same distance. Use the supplied double-sided tape to fix tracks in place direct to the floor. (Does not apply to bottom board as track is recessed). 10. Check all necessary hardware/componentry is fitted into the top track and panels. 11. Fit rear panels into the back track first, attaching the wheel carrier brackets to the wheel carriers in the top track and lock them in place. Compress the bottom guides and release into place in the bottom track. 12. If fitting co-joined panels, line panels up beside each other and drop hinge pins in to attach. 13. Make any necessary adjustments at the wheel carriers and sideboards to ensure panels are squared up and they operate correctly. 14. Attach returns to fascia if applicable using L brackets. 15. Attach fascia according to diagrams on page 53. a. OPUS – attach L brackets to underside front edge of headboard, then attach fascia b. ENCORE – back off headboard fixing screws to loosen headboard slightly. Slide fascia angle in between headboard and recess. Make adjustments to position fascia and drive headboard fixing screws back in fully to hold fascia in place. 56

TRACK BYPASS INSIDE MOUNT cont. OPUS INSIDE MOUNT ENCORE INSIDE MOUNT Attach L Bracket to underside of headboard Slide fascia between headboard and recess 16. Cover screw holes with screwcap stickers and gap fill if necessary to finish off. 17. Operate all louvre tilts and operate panels several times to make sure all components are working correctly. 18. Clean shutters and work space. OUTSIDE MOUNT: 1. Lay all of the framing pieces (boards) face up on the floor or your workspace. 2. Screw from above the headboard down into the sideboards. 3. Screw from sideboards into the bottom board if applicable, cover with screw caps. 4. Lift the assembled box unit and place against the wall in your measured position. 5. Tack into place with fixing screws taking care not to screw all the way into place. 6. Using a ladder: Fix the mounting block to the top of the headboard at the rear edge. For ENCORE aluminium shutters, use the 40x40 angle supplied as a mounting piece (diagrams below). 7. Screw through the mounting block or 40x40 angle into the wall, anchoring well: OPUS OUTSIDE MOUNT 40mm x 27mm Mounting block ENCORE OUTSIDE MOUNT 40mm x 40mm aluminium angle 57

2015-additional-needs-guide-v3
WorkEngine v3.x Installation Guide - EPM Live
TECHNICAL GUIDE
policy-guide-201201-Category-Guide-V3
CAPITOL CORRIDOR
Capitol Capitol - Minnesota's Private Colleges
Technical Guide - RM.com
Technical Guide - Hyster Company
Technical Guide - Hyster Company
Waspmote: Technical Guide - Libelium
Racor Products Technical Guide
CII_2412-PFS Members Guide-V3 - The Personal Finance Society
Capitol Celebrates 80 Years! - Capitol College
LO5.0T Technical Guide - Hyster Company
Brochure / Technical Guide - Hyster Company
Technical Guide - Antietam Velo Club
HyPURITY HPLC Technical Guide - Chromatopak
Brochure / Technical Guide - Hyster Company