Views
3 months ago

ECOBuilder-Specifiers Journal spring2018

Bloomberg’s new

Bloomberg’s new European HQ, London Foster+Partners 24/10/2017 - The new European headquarters of Bloomberg LP was launched today at an event hosted by its founder Michael R. Bloomberg, in the company of Lord Foster, Founder and Executive Chairman, Foster + Partners and Sadiq Khan, Mayor of London. Located between the Bank of England and St Paul’s Cathedral, the building responds to its historic context, yet is uniquely of its place and time. It is a true exemplar of sustainable development, with a BREEAM Outstanding rating – the highest design-stage score ever achieved by any major office development. Occupying a full city block, the 3.2- acre site comprises two buildings united by bridges that span over a pedestrian arcade that reinstates Watling Street, an ancient Roman road that ran through the site. Bloomberg Arcade is now a key route for people moving around the City, with restaurants and cafes at ground level, set back behind an undulating façade under a covered colonnade. Three public plazas, located at each end of the arcade and in front of the building’s entrance, provide new civic spaces in the heart of the Square Mile. The building height protects key views of St Paul’s Cathedral whilst respecting neighbouring historic buildings. Its striking façade is defined by a structural sandstone frame in response to the adjacent Magistrate’s Court, with a series of large-scale bronze fins that shade the floor-toceiling glazing. The fins give the building a visual hierarchy and rhythm as they vary in scale, pitch and density across each façade according to orientation and solar exposure, whilst also being an 20 SPECIFIERS JOURNAL - SPRING 2018

integral part of the building’s natural ventilation system. Lord Foster, Founder and Executive Chairman, Foster + Partners, said: “From day one, we talked with Mike Bloomberg about creating an elegant stone building that responds to its historic setting yet is clearly of its own time and which would be a good neighbour in the City of London in every sense of the word. We wanted the building to have an integrity and continuity of expression both inside and out, creating an inspiring, innovative, dynamic and collaborative workplace for Bloomberg that embodies the core values of the company. Above all, we had a shared belief with Bloomberg that we should provide the highest standards of sustainability and wellbeing for its occupants, as well as create major new public spaces at ground level, making a significant contribution to the daily life of the City of London and its inhabitants. Art plays a central role in the project, with major site-specific commissions in and around the building. Cristina Iglesias’ water sculpture in three parts, ‘Forgotten Streams’ – a homage to the ancient Walbrook River that once flowed through the site – defines the public spaces at each end of Bloomberg Arcade. Other works in the building include pieces by Michael Craig-Martin, Olafur Eliasson, Arturo Herrera, Langlands and Bell, David Tremlett and Pae White. The new Bloomberg building also returns the archaeological remains of the Roman Temple of Mithras to the site of their original discovery, with a new interpretation centre and cultural hub designed to give visitors an immersive experience of the temple and bring the history of the site to life. The main entrance to Bloomberg is defined by a substantial porte-cochère, where the building forms two sides of a new formal city square. Beneath this square is a new entrance to Bank Underground station, constructed as part of the project, that connects to the Waterloo and City line. Arriving at the main entrance, everyone passes through the reception lobby before being drawn into the Vortex – a dramatic double-height space created by three inclined, curving timber shells, whose unique form echoes the dynamism and energy of Bloomberg. These shells twist to form an oculus at their apex, which contains an artwork titled ‘No Future Is Possible Without A Past’ by Olafur Eliasson. From here, high-speed fully-glazed lifts with a unique concealed mechanism – another innovation developed specifically for the building – carry everyone directly to the sixth floor. Central to Bloomberg’s ethos, the double-height ‘pantry’ on the sixth floor is the heart of the building, reflecting the importance of sharing and collaboration at the company. Everyone passes through this animated space, increasing the likelihood of chance meetings and informal discussions. The upper level of the pantry is formed by a sweeping crescent of individual meeting booths that overlook the central space, known as the Ha-Ha, referring to the classic landscape device that inspired their design. A SPECIFIERS JOURNAL - SPRING 2018 21

Dulas Catalogue - Ecobuild Product Search
Wood Fibreboard Product Applications - Ecobuild
the environmentally compatible building product - Ecobuild
The Victorian Terrace, BRE Innovation Park - Ecobuild Product Search
SPECIFIERS CLIENTS AND SUPPLIERS
Systems & Solutions for a changing World! - Ecobuild
Insulate Magazine Ecobuild 2018 Special Edition
ENERGATE - Ecobuild
TECU® Copper for Roof and Façade Cladding Product ... - Ecobuild
Solar Panels - Ecobuild Product Search
Mastic Asphalt News - Ecobuild
Top ten reasons to specify STYROFOAM XPS in inverted roofing
Durability by Design Brochure - Ecobuild Product Search
Rationel Catalogue - Ecobuild Product Search
HANSE HAUS Buyer Guide - Ecobuild
Architectural Record 2015-06
Micronal PCM Brochure - Ecobuild Product Search
Energy-Roof brochure - Ecobuild Product Search
Solar Thermal Tiles - Ecobuild Product Search
1cHJONU
The KVH®-1plus® warranty system. - Ecobuild
Ubiflex Specifier brochure - Howarth Timber
specifying architectural millwork and cabinetry - Ron Blank ...
improving and decorating your home
Beaumont Window Information - Ecobuild Product Search
CIBSE-Journal-2013-09
Product Brochure - Ecobuild Product Search
CIC Start Online Innovation Review September 2012
Electric Underfloor Heating Solutions - Building Products Index
REI_Feb13-lo-res