Operating results of nuclear power plants in Germany 2016 and 2017
Nuclear power plant Rated power Gross electricity
generation
in MWh
Availability
factor*
in %
Energy availability
factor**
in %
REPORT
gross
in MWe
net
in MWe
2016 2017 2016 2017 2016 2017
Brokdorf KBR 1,480 1,410 11,503,003 5,778,146 93.28 51.68 93.08 48.23
Emsland KKE 1,406 1,335 11,113,993 11,323,704 94.25 93.28 94.13 93.13
Grohnde KWG 1,430 1,360 8,903,639 9,684,880 75.11 86.10 73.08 82.40
Gundremmingen KRB B**** 1,344 1,284 10,015,303 9,689,710 89.81 93.10 89.30 92.20
Gundremmingen KRB C 1,344 1,288 9,396,741 9,929,820 85.98 87.85 85.46 85.93
Isar KKI 2 1,485 1,410 11,990,925 11,523,513 95.86 91.53 95.68 91.15
Neckarwestheim GKN II 1,400 1,310 11,391,770 10,540,800 94.69 88.93 94.26 88.60
Philippsburg KKP 2 1,468 1,402 10,318,992 7,853,827 82.32 63.18 82.19 63.12
Total*** 11,357 10,799 84,634,367 76,324,400 88.91 81.95 88.42 80.47
* Availability factor (time availability factor) kt = tN/tV: The time availability factor kt is the quotient
of available time of a plant (tV) and the reference period (tN). The time availability factor is a degree
for the deployability of a power plant.
** Energy availability factor kW = WV/WN: The energy availability factor kW is the quotient of available
energy of a plant (WV ) and the nominal energy (WN). The nominal energy WN is the product of nominal
capacity and reference period. This variable is used as a reference variable (100 % value) for availability
considerations. The available energy WV is the energy which can be generated in the reference period
due to the technical and operational condition of the plant. Energy availability factors in excess of 100 %
are thus impossible, as opposed to energy utilisation.
*** Inclusive of round up/down, rated power in 2017.
**** The Gundremmingen nuclear power plant (KRB B) was permanently shutdown on 31 December 2017
due to the revision of the German Atomic Energy Act in 2011.
All data in this report as of 31 March 2018.
Report
Operating results 2017 – Part I*