Operating data

Review period 2017

REPORT

Plant operator: Kernkraftwerke Lippe-Ems GmbH

Shareholder/Owner: RWE Power AG (87,5 %),

PreussenElektra GmbH (12,5 %)

Plant name: Kernkraftwerk Emsland (KKE)

Address: Kernkraftwerk Emsland,

Am Hilgenberg , 49811 Lingen, Germany

Phone: 0591 806-1612

Web: www.rwe.com

100

90

80

Availability factor in %

Capacity factor in %

94 95 95

95

95

91

94

93

First synchronisation: 04-19-1988

Date of commercial operation: 06-20-1988

Design electrical rating (gross):

1,406 MW

Design electrical rating (net):

1,335 MW

Reactor type:

PWR

Supplier:

Siemens/KWU

70

60

50

40

The following operating results were achieved:

Operating period, reactor:

8,183 h

Gross electrical energy generated in 2017:

11,323,704 MWh

Net electrical energy generated in 2017:

10,751,526 MWh

Gross electrical energy generated since

first synchronisation until 12-31-2017:

335,323,283 MWh

Net electrical energy generated since

first synchronisation until 12-31-2017:

317,914,871 MWh

Availability factor in 2017: 93.28 %

Availability factor since

date of commercial operation: 94.04 %

Capacity factor 2017: 93.13 %

Capacity factor since

date of commercial operation: 93.90 %

Downtime

(schedule and forced) in 2017: 6.72 %

Number of reactor scrams 2017: 0

Licensed annual emission limits in 2017:

Emission of noble gases with plant exhaust air:

Emission of iodine-131 with plant exhaust air:

(incl. H-3 and C-14)

Emission of nuclear fission and activation products

with plant waste water (excluding tritium):

1.0 · 10 15 Bq

5.0 · 10 9 Bq

3.7 · 10 10 Bq

Proportion of licensed annual emission limits

for radioactive materials in 2017 for:

Emission of noble gases with plant exhaust air: 0.09 %

Emission of iodine-131 with plant exhaust air: 0.0 %

(incl. H-3 and C-14)

Emission of nuclear fission and activation products

with plant waste water (excluding tritium): 0.00 %

Collective dose:

0.093 Sv

30

20

10

0

10

9

8

7

6

5

4

3

2

1

95 95 95

2010 2011 2012

95

2013

95

2014

91

2015

Collective radiation dose of own

and outside personnel in Sv

94

2016

93

2017

0

0.15 0.07 0.09

2010 2011 2012

0.08

2013

0.06

2014

0.10

2015

0.05 0.09

2016 2017