Operating data
Review period 2017
REPORT
Plant operator: Kernkraftwerk Gundremmingen GmbH
Shareholder/Owner: RWE Power AG (75 %),
PreussenElektra GmbH (25 %)
Plant name: Kernkraftwerk Gundremmingen C (KRB C)
Address: Kernkraftwerk Gundremmingen GmbH,
Dr.-August-Weckesser-Straße 1, 89355 Gundremmingen, Germany
Phone: 08224 78-1, Telefax: 08224 78-2900
E-mail: kontakt@kkw-gundremmingen.de
Web: www.kkw-gundremmingen.de
First synchronisation: 11-02-1984
Date of commercial operation: 01-18-1985
Design electrical rating (gross):
1,344 MW
Design electrical rating (net):
1,288 MW
Reactor type:
BWR
Supplier:
Siemens/KWU,
Hochtief
100
90
80
70
60
50
40
92
Availability factor in %
Capacity factor in %
84
91
89
90
90
86
86
The following operating results were achieved:
Operating period, reactor:
7,696 h
Gross electrical energy generated in 2017: 9,929,820 MWh
Net electrical energy generated in 2017: 9,462,044 MWh
Gross electrical energy generated since
first synchronisation until 12-31-2017:
320,579,893 MWh
Net electrical energy generated since
first synchronisation until 12-31-2017:
305,307,859 MWh
Availability factor in 2017: 87.85 %
Availability factor since
date of commercial operation: 89.20 %
Capacity factor 2017: 85.93 %
Capacity factor since
date of commercial operation: 87.50 %
Downtime
(schedule and forced) in 2017: 12.10 %
Number of reactor scrams 2017: 0
Licensed annual emission limits in 2017
(values added up for Units B and C, site emission):
Emission of noble gases with plant exhaust air: 1.85 · 10 15 Bq
Emission of iodine-131 with plant exhaust air: 2.20 · 10 10 Bq
Emission of nuclear fission and activation products
with plant waste water (excluding tritium):
1.10 · 10 11 Bq
30
20
10
0
10
9
8
7
6
5
93 85 92
2010 2011 2012
90
2013
90
2014
90
2015
Collective radiation dose of own
and outside personnel in Sv
86
88
2016 2017
Proportion of licensed annual emission limits for radioactive
materials in 2017 for (values added up for Units B and C):
Emission of noble gases with plant exhaust air: 0.45 %
Emission of iodine-131 with plant exhaust air: 0.31 %
Emission of nuclear fission and activation products
with plant waste water (excluding tritium): 0.39 %
Collective dose:
0.89 Sv
4
3
2
1
0.89
1.59
0.78
1.36
1.14
1.49
0.84
0.89
0
2010 2011 2012
2013
2014
2015
2016