02.05.2018 Views

atw 2018-05v6

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>atw</strong> Vol. 63 (<strong>2018</strong>) | Issue 5 ı May<br />

349<br />

Operating data<br />

Review period 2017<br />

REPORT<br />

Plant operator: PreussenElektra GmbH<br />

Shareholder/Owner: PreussenElektra GmbH (75 %),<br />

Stadtwerke München GmbH (25 %)<br />

Plant name: Kernkraftwerk Isar 2 (KKI 2)<br />

Address: PreussenElektra GmbH, Kernkraftwerk Isar,<br />

Postfach 11 26, 84049 Essenbach, Germany<br />

Phone: 08702 38-2465, Telefax: 08702 38-2466<br />

Web: www.preussenelektra.de<br />

100<br />

90<br />

80<br />

93<br />

Availability factor in %<br />

Capacity factor in %<br />

96<br />

94<br />

94<br />

90<br />

89<br />

96<br />

91<br />

First synchronisation: 01-22-1988<br />

Date of commercial operation: 04-09-1988<br />

Design electrical rating (gross):<br />

1,485 MW<br />

Design electrical rating (net):<br />

1,410 MW<br />

Reactor type:<br />

PWR<br />

Supplier:<br />

Siemens/KWU<br />

70<br />

60<br />

50<br />

40<br />

The following operating results were achieved:<br />

Operating period, reactor:<br />

8,022 h<br />

Gross electrical energy generated in 2017:<br />

11,523,513 MWh<br />

Net electrical energy generated in 2017:<br />

10,901,556 MWh<br />

Gross electrical energy generated since<br />

first synchronisation until 12-31-2017:<br />

341,598,323 MWh<br />

Net electrical energy generated since<br />

first synchronisation until 12-31-2017:<br />

322,966,901 MWh<br />

Availability factor in 2017: 91.53 %<br />

Availability factor since<br />

date of commercial operation: 93.21 %<br />

Capacity factor 2017: 91.15 %<br />

Capacity factor since<br />

date of commercial operation: 92.27 %<br />

Downtime<br />

(schedule and forced) in 2017: 8.47 %<br />

Number of reactor scrams 2017: 1<br />

Licensed annual emission limits in 2017:<br />

Emission of noble gases with plant exhaust air: 1.1 · 10 15 Bq<br />

Emission of iodine-131 with plant exhaust air: 1.1 · 10 10 Bq<br />

Emission of nuclear fission and activation products<br />

with plant waste water (excluding tritium):<br />

5.5 · 10 10 Bq<br />

Proportion of licensed annual emission limits<br />

for radioactive materials in 2017 for:<br />

Emission of noble gases with plant exhaust air: 0.057 %<br />

Emission of iodine-131 with plant exhaust air: < limit of detection<br />

Emission of nuclear fission and activation products<br />

with plant waste water (excluding tritium):<br />

< limit of detection<br />

Collective dose:<br />

0.139 Sv<br />

30<br />

20<br />

10<br />

0<br />

10<br />

9<br />

8<br />

7<br />

6<br />

5<br />

4<br />

3<br />

2<br />

93 96<br />

2010 2011<br />

94<br />

2012<br />

96<br />

2013<br />

95<br />

2014<br />

89<br />

2015<br />

Collective radiation dose of own<br />

and outside personnel in Sv<br />

96<br />

92<br />

2016 2017<br />

1<br />

0<br />

0.23 0.08 0.14<br />

2010 2011 2012<br />

0.08<br />

2013<br />

0.09<br />

2014<br />

0.25<br />

2015<br />

0.06<br />

2016<br />

0.14<br />

2017<br />

Report<br />

Operating results 2017 – Part I*

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!