atw 2018-05v6
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>atw</strong> Vol. 63 (<strong>2018</strong>) | Issue 5 ı May<br />
349<br />
Operating data<br />
Review period 2017<br />
REPORT<br />
Plant operator: PreussenElektra GmbH<br />
Shareholder/Owner: PreussenElektra GmbH (75 %),<br />
Stadtwerke München GmbH (25 %)<br />
Plant name: Kernkraftwerk Isar 2 (KKI 2)<br />
Address: PreussenElektra GmbH, Kernkraftwerk Isar,<br />
Postfach 11 26, 84049 Essenbach, Germany<br />
Phone: 08702 38-2465, Telefax: 08702 38-2466<br />
Web: www.preussenelektra.de<br />
100<br />
90<br />
80<br />
93<br />
Availability factor in %<br />
Capacity factor in %<br />
96<br />
94<br />
94<br />
90<br />
89<br />
96<br />
91<br />
First synchronisation: 01-22-1988<br />
Date of commercial operation: 04-09-1988<br />
Design electrical rating (gross):<br />
1,485 MW<br />
Design electrical rating (net):<br />
1,410 MW<br />
Reactor type:<br />
PWR<br />
Supplier:<br />
Siemens/KWU<br />
70<br />
60<br />
50<br />
40<br />
The following operating results were achieved:<br />
Operating period, reactor:<br />
8,022 h<br />
Gross electrical energy generated in 2017:<br />
11,523,513 MWh<br />
Net electrical energy generated in 2017:<br />
10,901,556 MWh<br />
Gross electrical energy generated since<br />
first synchronisation until 12-31-2017:<br />
341,598,323 MWh<br />
Net electrical energy generated since<br />
first synchronisation until 12-31-2017:<br />
322,966,901 MWh<br />
Availability factor in 2017: 91.53 %<br />
Availability factor since<br />
date of commercial operation: 93.21 %<br />
Capacity factor 2017: 91.15 %<br />
Capacity factor since<br />
date of commercial operation: 92.27 %<br />
Downtime<br />
(schedule and forced) in 2017: 8.47 %<br />
Number of reactor scrams 2017: 1<br />
Licensed annual emission limits in 2017:<br />
Emission of noble gases with plant exhaust air: 1.1 · 10 15 Bq<br />
Emission of iodine-131 with plant exhaust air: 1.1 · 10 10 Bq<br />
Emission of nuclear fission and activation products<br />
with plant waste water (excluding tritium):<br />
5.5 · 10 10 Bq<br />
Proportion of licensed annual emission limits<br />
for radioactive materials in 2017 for:<br />
Emission of noble gases with plant exhaust air: 0.057 %<br />
Emission of iodine-131 with plant exhaust air: < limit of detection<br />
Emission of nuclear fission and activation products<br />
with plant waste water (excluding tritium):<br />
< limit of detection<br />
Collective dose:<br />
0.139 Sv<br />
30<br />
20<br />
10<br />
0<br />
10<br />
9<br />
8<br />
7<br />
6<br />
5<br />
4<br />
3<br />
2<br />
93 96<br />
2010 2011<br />
94<br />
2012<br />
96<br />
2013<br />
95<br />
2014<br />
89<br />
2015<br />
Collective radiation dose of own<br />
and outside personnel in Sv<br />
96<br />
92<br />
2016 2017<br />
1<br />
0<br />
0.23 0.08 0.14<br />
2010 2011 2012<br />
0.08<br />
2013<br />
0.09<br />
2014<br />
0.25<br />
2015<br />
0.06<br />
2016<br />
0.14<br />
2017<br />
Report<br />
Operating results 2017 – Part I*