Furesø Golfklub Renovation<br />

Furesø Case Study Golfklub, Birkerød, Copenhagen<br />

Mackenzie & Ebert have been working with the club to update and envigorate their<br />

courses. They have 27 holes all built at different times to the designs of Jan Sederholm.<br />

The Club wanted to keep their golf offering fresh to maintain their high standing in<br />

Copenhagen and Danish golf. They also knew that although they had many vast bunkers,<br />

most of them did not test the better golfers and just slowed up play and added to the<br />

maintenance costs.<br />

Another part of the project was to re-style and rebuild the green surrounds.<br />

The work was done in two phases: the Parkvej nine being rebuilt in July to September<br />

2013 and the two remaining nines, Farum and Hestköpgørd between June and<br />

September 2014.


Furesø Golfklub Renovation<br />

Bunkers<br />

The aim with the bunkering was to:<br />

a. Reduce the overall area of sand significantly;<br />

b. Make them much more attractive and visible when playing the holes;<br />

c. Make them more in play for the better players but less in play for the shorter players,<br />

especially from the tee.<br />

d. To minimise the amount of hand-mowing while achieving the necessary visual<br />

impact.


Furesø Case Study<br />

A typical huge bunker.<br />

Too severe for lesser golfersl<br />

Original hole


Furesø Golfklub Renovation<br />

Green Surrounds<br />

The shaping of the green surrounds was simplistic in style with some prominent<br />

and unattractive hills.<br />

The original construction methods prevented the grass from being mown short around<br />

the greens and a number of the surrounds were wet.<br />

Our recommendation was to reshape them completely and upgrade these areas to<br />

improve the drainage, create valleys, shoulders and hills that were softer and more<br />

mowable. The aim with this was to give players a wide range of recovery options<br />

around the greens from a putter to a five iron to a utility club to a lob wedge.<br />

This involved not just the creation of interesting shapes but also using a top quality<br />

specification with improved drainage, imported sands and soils and extended and<br />

carefully controlled irrigation. These areas were all seeded with the best cultivars of<br />

fescue to produce fine turf in these areas.


Furesø Case Study<br />

Big humps & invisible<br />

bunkers.<br />

Original hole


Furesø Case Study<br />

The 1 st on Parkvej Nine<br />

Bunkers block way into green.<br />

Original hole


Furesø Case Study<br />

The work in progress.<br />

After shaping


Furesø Case Study<br />

The left side of the green is<br />

now accessible.<br />

During establishment


Furesø Case Study<br />

The 7 th on Parkvej Nine<br />

with huge bunkers<br />

Original hole


Furesø Case Study<br />

Two drive bunkers narrow<br />

down the fairway.<br />

During establishment


Furesø Case Study<br />

The greenside bunkers are<br />

also much more prominent<br />

After opening in 2014


Furesø Case Study<br />

The 6 th on Parkvej Nine<br />

Bland and unexciting.<br />

Original hole


Furesø Case Study<br />

A system of hollows and<br />

valleys under construction.<br />

During shaping


Furesø Case Study<br />

Soon after hydro-seeding<br />

After seeding


Furesø Case Study<br />

The completed hole with<br />

closely mown surrounds.<br />

After opening


Furesø Case Study<br />

The 9 th On Hestköp Nine<br />

Cross bunker across front<br />

Original hole


Furesø Case Study<br />

Bunkers reshaped and green<br />

mellowed off<br />

After seeding


Furesø Case Study<br />

Bunkers reshaped and green<br />

mellowed off<br />

Opening Day


Furesø Case Study<br />

The 6 th on Farum Nine<br />

Tree blocks hole.<br />

Original hole


Furesø Case Study<br />

The reshaped green and<br />

bunkers with tree removed.<br />

Work underway


Furesø Case Study<br />

View from the tee.<br />

Opening Day


Furesø Case Study<br />

Strong flowing shapes<br />

of bunkers.<br />

Bunker detail


Furesø Case Study<br />

The new green takes shape.<br />

Opening Day


Furesø Case Study<br />

The 3 rd on Hestköp Nine<br />

Little definition.<br />

Original hole


Furesø Case Study<br />

Left bunker made visible.<br />

Right bunker added.<br />

During establishment


Furesø Case Study<br />

Left bunker made visible.<br />

Right bunker added.<br />

During establishment


Furesø Case Study<br />

The 8 th on Hestköp Nine<br />

Bunkers lack shape.<br />

Original Hole


Furesø Case Study<br />

Surrounds and bunkers<br />

reshaped to transform hole.<br />

During establishment


Furesø Case Study<br />

Surrounds and bunkers<br />

reshaped to transform hole.<br />

Opening Day


Metro House<br />

Chichester<br />

West Sussex<br />

PO191BE<br />

Telephone<br />

01243 531901<br />

pitchandrun18@aol.com<br />

www.mackenzieandbert.com<br />

@golfarchitects

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!