Hole 6<br />
This project includes for the redesign<br />
and upgrade of the en6re green<br />
surrounds.<br />
The view through to the green site<br />
will be greatly improved by the<br />
lowering and reshaping of the<br />
exis6ng raised area on the approach<br />
to the green. This will allow the<br />
golfer to see the complete challenge<br />
that lies ahead. It is a view that is<br />
worth exposing, as the redesigned<br />
and rebuilt surrounds will look<br />
stunning and will make the 6th hole a real feature hole on the course.<br />
Again the same build for the walls, with the same stone facing to be used on the bridge and the<br />
weir.<br />
I also propose to reshape the green surrounds to the le] side of the hole, giving surrounds of much<br />
greater shape and quality, where the golfer will play off dryer, improved turf condi6ons, with a<br />
variety of shot op6ons now available to get “up and down” for par.<br />
I have posi6oned a swale and bunker into the front green surrounds, between the wall and the<br />
green. This will give a much cleaner and much more exci6ng and visually aNrac6ve appearance to<br />
the green site. Although increasing the challenge of playing the hole , the bunker will be a much<br />
fairer and more exci6ng test than the current poorly shaped surround in this area.<br />
The green surface will be adjusted to blend with the new surrounds contours.<br />
Hole 10<br />
I propose to create an “Island”<br />
effect for the green site. The access<br />
to the green will come from a path<br />
to the rear of the green.<br />
The green will be enlarged a liNle<br />
from its exis6ng size, working out<br />
from the exis6ng contours. The back<br />
terrace in par6cular, needs to be<br />
enlarged to offer playability to this<br />
sec6on of the green.<br />
The surrounds off the right side of<br />
the green, will be reshaped and<br />
rebuilt to retain a small “miss” area. This area will also be drained and sand capped to assist in the<br />
promo6on and reten6on of healthy turf , in this busy walk on, walk off area.<br />
The greenside bunker will be reshaped to be visible from the tee shot.<br />
I have allowed for the removal of the exis6ng stone wall, rebuilding around the enlarged green site ,<br />
using the same build specifica6on as per holes 1, 4 and 6.<br />
The fairway and semi rough borders of the water feature will be reshaped and re- turfed to<br />
complete the redesign and upgrade works.<br />
I also advise that we move the tees forward, to create a hole length that is more in keeping with the<br />
degree of difficulty and in6mida6on that an “Island” green will bring.