- Page 1: 5th International Architecture Bien
- Page 5 and 6: I. Introduction: From Arnavutköy M
- Page 7 and 8: A Strategic Vision Project origin,
- Page 9 and 10: Arnavutköy & drinking water reserv
- Page 11 and 12: Istanbul Water Management Alternati
- Page 13 and 14: Istanbul Masterplan focus on preser
- Page 15: Istanbul growth 1980 Impact of Firs
- Page 19 and 20: A World of Cities Urban agglomerati
- Page 21 and 22: Arnavutköy Dynamics How to allow g
- Page 23 and 24: Considering Multiple Scales Proposa
- Page 25 and 26: Prioritized Readings Natural Entiti
- Page 29 and 30: II. Project Summary: Sazlidere Basi
- Page 31 and 32: Looking at the Full Water Cycle One
- Page 33 and 34: Functional nature zone Current situ
- Page 35 and 36: Clearly visible, physical boundarie
- Page 37 and 38: Towards a total system An alternati
- Page 39 and 40: Current built volume in the basin F
- Page 41 and 42: A very clear forest band marks the
- Page 43 and 44: feeds City Agriculture feeds protec
- Page 45 and 46: ? Current Scenario (low growth) Cur
- Page 47: ASSUMPTIONS FOR CALCULATING Area in
- Page 50 and 51: ARNAVUTKOY >> ARNAVUTKOY Strategic
- Page 53 and 54: Appendix 1: Design Principles Pilot
- Page 55 and 56: In this appendix the selection of p
- Page 57 and 58: Pilot Site Selection Overview of la
- Page 60 and 61: Pilot #01: Hadimköy Ridge City Lan
- Page 62 and 63: Pilot #01: Hadimköy Ridge City Cit
- Page 64 and 65: Pilot #01: Hadimköy Ridge City Lay
- Page 66 and 67:
Pilot #01: Hadimköy Ridge City Liv
- Page 68 and 69:
Pilot #01: Hadimköy Ridge City 3D
- Page 70 and 71:
Pilot #01: Hadimköy Ridge City Cap
- Page 72 and 73:
Pilot #01: Hadimköy Ridge City Imp
- Page 74 and 75:
Overview Pilots #02,03,04 Legal Map
- Page 76:
Pilot #02: Arnavutköy Eco-Corridor
- Page 79 and 80:
Pilot #02: Arnavutköy Eco-Corridor
- Page 81 and 82:
Tree lined Avenue Central open spac
- Page 83 and 84:
Brook with floodplains in historic
- Page 85 and 86:
A A B B C D C Sections D
- Page 87 and 88:
The high density southwestern subce
- Page 90 and 91:
#03 Arnavutköy Ridge City New Zoni
- Page 92 and 93:
Pilot #03: Arnavutköy Ridge City L
- Page 94 and 95:
1 3 Pilot #03: Arnavutköy Ridge Ci
- Page 96 and 97:
Pilot #03: Arnavutköy Ridge City C
- Page 98 and 99:
Note on Process Property rights exc
- Page 100 and 101:
#04 Arnavutköy Agriculture Suburb
- Page 102 and 103:
Pilot #04: Arnavutköy Agriculture
- Page 104 and 105:
Pilot #04: Arnavutköy Agriculture
- Page 106 and 107:
Pilot #04: Arnavutköy Agriculture
- Page 108 and 109:
Pilot #04: Arnavutköy Agriculture
- Page 110:
Pilot #04: Arnavutköy Agriculture
- Page 114 and 115:
idge city forestband and precision
- Page 116 and 117:
Single Water Cycle (today) High rai
- Page 118 and 119:
New Forest A funcitonal border Fore
- Page 120 and 121:
Rule 1: No Direct Urban Run-off Use
- Page 122 and 123:
Reference: Drarga Community of Drar
- Page 124 and 125:
Reference: El Minia & Nawaq El Mini
- Page 127 and 128:
Urban and Landscape Quality Apart f
- Page 129 and 130:
Gated Community Connection Karaburu
- Page 132 and 133:
Enriching Contrasts Specific living
- Page 134 and 135:
The Gradient City Tools for adaptin
- Page 136 and 137:
uilding materials energy supply dri
- Page 138 and 139:
Phasing to Deal with Resistance A p
- Page 140 and 141:
Dividing to Pair Combining profitab
- Page 142 and 143:
Arnavutköy: Platform for Collabora
- Page 144 and 145:
Arnavutköy: Platform for Collabora
- Page 146 and 147:
Creating Alliances Looking for the