<strong>atw</strong> Vol. 64 (2019) | Issue 5 ı May<br />

296<br />

Brokdorf<br />

REPORT<br />

Operating sequence in 2018<br />

100<br />

90<br />

80<br />

70<br />

60<br />

50<br />

40<br />

30<br />

20<br />

10<br />

Electrical output in %<br />

January February March April May June July August September October November December<br />

In the year 2018 nuclear power plant Brokdorf (KBR) was on the grid<br />

with an availability factor of 84.70 % in total 7,937 operating hours.<br />

Gross generation <strong>for</strong> the year under review amounted to<br />

80 10,376,751 MWh. Also in 2018, the thermal reactor power was limited<br />

to a maximum of 95 % with a coolant temperature reduced by 3 K<br />

60 of nominal power due to the specifications of ME 02/2017 “Increased<br />

oxide layer thickness on fuel rod cladding tubes of fuel assemblies”.<br />

40<br />

Due to high summer temperatures, temporary reductions in output<br />

were necessary in the months of July to September in order to<br />

20<br />

comply with the water law permit.<br />

100<br />

0<br />

Planned shutdowns<br />

On 1 April 2018 the plant was shutdown <strong>for</strong> the 30 th refuelling and<br />

annual major revision:<br />

The revision included the following priorities:<br />

80<br />

pp<br />

Reactor<br />

Offload of the reactor pressure vessel.<br />

Oxide layer measurement and<br />

60<br />

visual inspection of fuel elements.<br />

40<br />

Inspection of control elements.<br />

Ultrasonic test, reactor pressure vessel,<br />

20<br />

bottom part.<br />

pp<br />

Main coolant pump YD40 Ring exchange of e-motor.<br />

0<br />

Inspection of the axial bearing.<br />

Replacement mechanical shaft seal.<br />

pp<br />

Feed water system Pressure testing.<br />

pp<br />

Coolant<br />

Works on pump stationary head VE30/40.<br />

Works on main coolant water<br />

Positionierung: channel VA10-30.<br />

pp<br />

Turbine Bezug, links, Standard untenservice.<br />

Inspection primary water cooler<br />

of generator.<br />

pp<br />

Trans<strong>for</strong>mers VGB: HKS6K Exchange 30 % of trans<strong>for</strong>mers<br />

<strong>atw</strong>: 100 60 CS12, 0 0 CS21, CT31.<br />

pp<br />

Batteries Exchange, redundancy 1<br />

100<br />

X = 20,475 Y = 95,25 B = 173,5 H = 38,2<br />

Unplanned shutdowns and reactor/turbine trip<br />

On 2 May 2018, the generator was disconnected from the grid and<br />

shut down to remove a seal leakage at a non-return flap of the steam<br />

generator blowdown system. On 5 May 2018, after completion of the<br />

repair, a malfunction in the turbine control at one of two electrohydraulic<br />

converters (EHU) occurred during start-up of the plant.<br />

After clearing of the failure the main synchronisation took place on<br />

6 May 2018.<br />

On 12 August 2018 the plant was disconnected from the grid <strong>for</strong><br />

repairing the speed monitor selection circuit of the turbine protection<br />

system.<br />

<strong>Power</strong> reductions above 10 % and longer than <strong>for</strong> 24 h<br />

In the period from 12 to 13 October 2018, power reduction was carried<br />

out <strong>for</strong> the inspection and repair of a connecting slide valve between<br />

a <strong>for</strong>ce-locking basin and a pump antechamber of the secured<br />

secondary cooling water system as well as <strong>for</strong> the detection and removal<br />

of a condenser pipe leakage in the turbine condenser.<br />

In addition, load reductions were carried out in order to implement<br />

the grid-supporting power control in accordance with the specifications<br />

of the mission control centre.<br />

Delivery of fuel elements<br />

During the reporting year 28 fuel elements were delivered.<br />

Waste management status<br />

By the end of the year 2018 33 loaded CASTOR © cask were located at<br />

the on-site intermediate storage Brokdorf.<br />

Report<br />

Operating Results 2018