27.06.2019 Views

STEEL + TECHNOLOGY 01/2019

- STEEL COMPANIES: Implementation of the new continuous casting plant at Saarstahl is on track - STEEL TECHNOLOGY: Ultra-thin hot rolled strip with only 0.6 mm thickness produced on Arvedi ESP line - ADDITIVE MANUFACTURING. 3D spray head for forging presses wins German Design Award

- STEEL COMPANIES: Implementation of the new continuous casting plant at Saarstahl
is on track
- STEEL TECHNOLOGY: Ultra-thin hot rolled strip with only 0.6 mm thickness produced on Arvedi ESP line
- ADDITIVE MANUFACTURING. 3D spray head for forging presses wins German Design Award

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

30 | COMPANIES<br />

„Clean Energy“ initiative<br />

Cooperation partners Salzgitter Flachstahl,<br />

Avacon and Linde sign agreement for<br />

ground breaking energy project<br />

Salzgitter Flachstahl GmbH, Linde AG and Avacon Natur GmbH signed a cooperation agreement today on<br />

the joint “Salzgitter Clean Hydrogen” innovation project, which signifies a big step toward a hydrogen-based<br />

industry.<br />

G<br />

erman flat steel producer Salzgitter<br />

Flachstahl GmbH together with<br />

Linde AG and Avacon Natur GmbH<br />

signed a cooperation agreement on the joint<br />

“Salzgitter Clean Hydrogen” innovation project,<br />

which signifies a big step toward a<br />

hydrogen-based industry.<br />

The aim of the project is to generate<br />

hydrogen in Salzgitter through electrolysis<br />

and electricity from wind power. These<br />

activities are to lay the foundation for the<br />

future deployment of larger hydrogen volumes<br />

to reduce direct CO 2<br />

emissions in<br />

the production of steel.<br />

Salzgitter Flachstahl is to plan the<br />

construction and operation of PEM electrolysis<br />

plant (PEM = proton-exchange<br />

membrane) with a capacity of around 400<br />

N.m³/h. Avacon intends to build and operate<br />

seven wind turbines on the premises<br />

of the Salzgitter group, three of which on<br />

the grounds of the steel mill. Industrial gas<br />

supplier Linde will ensure the steady supply<br />

of hydrogen. The cost of the entire project<br />

(installation of the wind turbines and the<br />

hydrogen plant, including linking them up to<br />

the existing distribution networks) amount<br />

to around 50 million euros. The financing of<br />

this forward-looking industrial climate protection<br />

project also necessitates the acquisition<br />

of governmental funding. Assuming<br />

the project runs smoothly, the production<br />

of hydrogen on the plant premises could<br />

commence in 2020.<br />

Building know-how for the<br />

environmentally compatible<br />

production of hydrogen<br />

Signed the cooperation agreement for the “Clean Energy” project (from left): Dr. Stephan<br />

Tenge, chief technology officer of Avacon AG; Ulrich Grethe, member of management<br />

board Salzgitter AG; Jens Waldeck, head of the Central Europe Region, Linde AG (Picture:<br />

Salzgitter AG)<br />

In the context of this project, the partners<br />

are aiming to build up know-how for the<br />

environmentally compatible production of<br />

<strong>STEEL</strong> + <strong>TECHNOLOGY</strong> 1 (2<strong>01</strong>9) First Issue

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!