José Soares Arquitecto - Portfolio

josesoaresarq

José Soares Architect
Buildings and Projects Architecture Portfolio,
from 1973 until today

PORTFOLIO

José Soares Architect

buildings and projects


Buildings


Baião Retirement Home

Designation:

Retirement Home for old people in Baião

Design Date:

1977 - 1982

Site Area:

9 190 m 2

Gross Floor Area:

2 835 m 2

Client:

Santa Casa da Misericórdia of Baião

Location:

Baião, Portugal

Co-Authorship/Collaboration:

José Luís Carvalho Gomes, Arq.

António Corte Real, Arq.

Alexandre Alves Costa, Arq.

South view


Site Plan

1/2000

3rd Floor

2nd Floor

1st Floor

Ground Floor

1/1000

South Elevation, Building 2 1/500


House in Madalena´s Beach

Designation:

House in the beach of Madalena, Valadares

Design Date:

1990 - 1997

Site Area:

2 500 m 2

Gross Floor Area:

400 m 2

Client:

Eng. Rui Poças

Location:

Valadares, Porto, Portugal

West view, entrance


5.03

562

574

6.33

vessa Combatentes

611 106

12.42

190

Travessa Cova da Mari

260 266

236

378

294

280

326

Travessa Tapadinha

15.14

276

Ribeiro da Madalena

10

112

Vereda 1 a Rua da Tapadinha

Vereda 2 à Rua da Tapadinha

182

31

27

25

148

158

162

25 186

Vereda 3 a Rua da Tapadinha

220

144_Bloco-A

144_Bloco-B

139

143

147 150

191

219

225

282

211

268

246

164

184

202

Rua Nazarães

18.63

Rua Suas Vilas

631

599

579

577

575

573

569

570

Ribeiro da Madalena

446

Campo de Jogos

331

12.86

303

289

257

223

715

124

18.14

16.17

705

52

530

685 528

683

146

467

11.89

677

21.53

6.37

9.20

200

19.70

663

507

868

19.85

557

559

82

106

472

541

17.33

116

99

23.93

777

7.86

Campo de Jogos

Ribeiro da Madalena

13.86

12.03

12.05

58

668

23.69

Site Plan 1/5000

15.72

1st Floor Plan

Ground Floor Plan

1/500

North Elevation

West Elevation


Planetary and Astrophysics Center of Porto

Designation:

Planetary and Astrophysics Center of Porto

Design Date:

1995 - 1998

Site Area:

4 500 m 2

Gross Floor Area:

3 630 m 2

Client:

Porto City Council

Location:

Porto, Portugal

Co-Authorship/Collaboration:

Cláudia Quelhas, Arq.

Ramiro Silva, Arq.

Rute Carlos, Arq.

Simone Giostra, Arq.

João Soares, Eng.

Barbara Rangel, Arq.

Eduardo Ribeiro, Arq.

Lúcio Parente, Arq.

View from South-East, Entrance


ENTRE

CAMPOS

68.78

69.33

69.16

69.11

69.11

68.97

68.86

68.74

68.57

68.28

68.54

68.12

68.14

68.14

68.69

68.89

68.31

67.82

68.03

68.32

73.03

72.52

70.72

73.37

73.03

72.52

69.17

69.18

69.37

69.47

69.08

69.43

69.00

69.00

.

68.71

69.19

67.02

67.04

72.50

74.86

70.91

74.84

72.21

75.89

74.84

75.89

71.52

74.86

70.91

72.21

68.16

67.71

67.21

67.14

73.17

72.47

72.29

69.70

68.89

71.89

68.85

68.56

68.58

67.96

68.06

67.09

67.23

67.83

73.17

72.47

72.29

69.75

60.66

55.50

55.35

67.80

68.29

66.75

66.35

66.70

66.18

66.45

66.31

66.41

66.50

66.35

66.18

.

65.57

65.23

65.73

65.33

65.69

65.48

65.58

65.37

65.70

65.21

65.72

65.49

65.38

65.55

65.52

65.57

66.35

66.54

67.23

67.07

67.36

67.42

67.65

67.45

67.80

67.74

67.81

67.78

67.95

68.06

68.16

68.09

68.06

68.03

67.85

67.87

67.90

68.08

68.14

68.06

68.09

68.11

68.12

68.21

68.11

68.08

68.02

68.12

68.11

.

67.82

67.82

68.18

68.24

68.31

68.38

41.65

44.33

45.46

46.39

45.69

44.49

43.37

47.48

49.44

50.41

50.18

50.02

48.36

50.86

50.49

48.55

47.32

46.94

46.42

45.49

47.32

47.97

51.52

52.70

52.92

50.27

49.64

48.72

48.40

49.37

47.25

47.25

47.21

47.63

47.56

44.22

48.33

49.94

54.00

53.77

53.93

53.48 53.20 52.74 52.21

51.82

51.34

57.75

57.92

57.80

57.90

58.22

58.57

58.97

59.33

59.75

60.38

60.86

61.28

61.75

61.49

60.72

59.65

58.59

56.59

54.56

58.34

59.80

60.60

61.59

61.93

62.44

62.51

62.71

62.21

61.91

61.25

60.80

60.27

59.90

59.44

59.00

58.62

58.24

59.12

60.47

60.92

59.76

55.68

61.48

61.48

52.63

59.32

57.83

57.55

58.23

58.69

59.41

59.88

60.47

60.82

61.17

61.77

61.77

62.24

62.74

62.78

61.76

61.68

60.84

61.66

59.53

59.20

58.76

58.31

57.94

60.47

60.87

60.45

60.75

61.39

61.59

61.82

61.58

62.30

62.69 62.39

62.54

62.70

63.53

63.66

63.49

63.74

63.63

63.34

63.59

63.35

63.67

63.33

63.62

63.51

62.72

62.57

61.32

64.43

63.58

62.64

61.61

60.69

60.89

61.65

62.52

63.74

64.63

64.77 64.83

64.51

64.67

64.54

64.65

64.36

64.52

64.40

64.37

63.53

59.45

60.10

67,94

62.48

62.16

62.79

62.81

62.68

62.78

61.36

61.63

61.37

62.68

62.31

62.68

62.52

60.24

62.27

53.04

52.65

51.70

57.52

.

60.70

49.79

42.39

41.11

39.69

44.49

44.77

61,49

.

59,58

63.26

66.26

69.81

69.98

69.57

69.17

69.16

69.20

69.25

68.52

69.26

65.15

65.20

64.19

65.38

65.54

67.25

66.49

66.38

61.87 .

62.25

62.37

69.10

69.46

69.35

69,05

65

61.14

60.09

59.24

59.80

61.57

60.86

60.24

60.54

59.67

58.81

58.96

60.20

61.78

61.61

62.01

62.42

62.46

63.32

63.58

63.52

63.40

64.21

64.17

63.59

63.73

63.34

63.82

64.51

64.52

65.15

65.24

65.79

65.79

65.28

64.69

65.25

65.38

65.15

66.80

66.57

67.46

64.52

60.50

62.12

62.43

59.56

63.28

65.18

65.39

65.25

63.50

62.81

.

50.12

50.33

52.54

53.27

53.88

54.17

54.36

54.91

55.58

56.58

56.65

56.33

56.67

56.40

56.50

56.50

56.70

56.55

57.36

57.26

55.82

55.75

56.97

57.38

60.60

62.29

63.45

57.74

55.58

60.43

52.41

53.16

53.30

54.38

54.81

54.98

54.44

54.10

54.16

54.73

54.14

54.28

54.32

54.43

54.80

56.80

56.63

59.36

58.49

58.01

58.06

52.26

50.37

53.50

54.23

.

48.99

41.11

41.26

43.24

47.12

46.48

39.72

41.32

45.92

46.21

46.29

46.46

47.51

48.21

47.19

45.92

42.78

43.31

44.45

45.57

46.36

36.73

36.72

36.85

37.43

38.46

40.34

44.32

54.01

42.64

51.37

64.89

62.01

56.52

43.87

49,85

50,59

.

68.0

64.0

60.0

63.0

AUTO

PANORAMICA

DO

RUA

R

Trave sa

Golgota

EDUARDO

ROMERO

R

RUA

DA

BOA

VIAGEM

do

GOLGOTA

C.C.

C.C.

C.C.

Quinta

da

Povoa

70.04

70.85

70.09

69.59

68.80

68.26

67.93

65.80

69.68

70.24

70.06

70.11

70.18

68.42

68.83

70.28

71.02

71.06

71.17

70.87

74.16

76.69

75.87

74.23

71.05

70.34

65.73

66.09

65.82

64.35

65.47

64.49

63.56

69.01

69.29

69.57

69.95

70.01

69.89

69.86

69.68

62.44

62.76

62.76 62.80

69.94

64.40

65.16

66.54

63.23

63.24

62.40

66.44

63.16

64.77

64.49

63.71

62.78

62.60

63.32

69.81 69.91

70.47

69.66

69.18

68.54

68.29

67.60

67.22

66.61

65.97

65.31

64.60

67.38

66.57

67.47

68.40

70.11

68.56

70.12

70.23

69.63

69.93

69.34

69.35

70.13

65.83

64.19

64.99

65.31

.

66.50

66.93

66.87

68.46

69.39

64.27

69.30

68.46

67.62

67.43

67.85

68.52

68.43

69.49

69.34

70.09

67,12

66.85

69.20

66.58

67.24

69.50

68.45

67.20

66.45

65.49

66.65

70.12

65.65

67.74

68.48

70.24 69.59

70

66.20

70.63

70.69

62.14

70.03

. 63,47

66,08

68.45

67.96 65.95

64.67

64.11

63.68

.

63.67

64.10

63.28

63.35

63.56

65.39

67.65

62.09

61.58

61.37

61.59

61.30

61.30

61.76

61.19

61.15

60.28

60.84

60.73

60.60

59.65

57.54

65.83

65.68

63.42

63.17

63.01

57.91

57.92

58.09

58.25

58.13

58.19

58.05

58.08

61.23

60.59

59.48

58.61

57.86

57.98

57.96

57.95

57.89

59.41

58.06

57.95

57.50

55.47

54.83

54.86

54.79

54.94

54.91

54.85

54.87

54.99

54.84

57.93

56.78

56.73

56.66

56.34

56.43

56.96

63.52

62.57

64.06

67.62

68.97

68.27

60.73

57.05

57.23

57.32

57.47

57.85

57.77

57.18

53.18

54.60

52.48

50.48

55.66

55.69

55.51

55.26

55.30

54.37

54.36

54.63

54.58

54.76

54.30

52.22

40.29

39.22

38.58

39.80

40.61

45.02

45.38

45.36

44.55

43.55

41.63

37.19

37.48

36.48

36.24

40.34

35.60

40.38

43.31

43.44

45.81

45.84

46.10

46.64

46.29

46.54

46.11

69.91

73.44

57.23

57.39

58.15

57.84

77.06

58.06

58.04

58.12

67.52

57.58

54.63

55.44

63,25

67.16

67.40

66.57

66.75

66.65

66.26

65.94

66.13

66.14

65.97

66.15

66.41

66.72

66.51

65.67

65.30

65.57

65.26

65.36

65.52

67.48 67.61

65.37

64.61

64.37

63.48

63.77

67.10

67.27

64.84

64.34

64.69

64.48

64.56

63.66

63.47

64.49

63.10

62.13

65.38

65.60

65.64

65.77

65.73

65.54

65.80

65.80

65.67

65.40

66.58

66.66 66.43 66.42

66.84

66.84

66.84

67.19

67.34

67.40

67.25

66.53

66.53

66.36

65.83

65.82

66.03

65.53

65.47

63.12

63.14

63.17

65.34

62.85

56.40

58.41

60.57

61.70

62.16

59.78

59.72

60.14

60.03

60.38

59.72

59.34

59.37

59.38

59.42

59.15

60.27

60.28

59.13

59.23

59.39

59.10

59.52

58.33

58.34

56.97

60.12

60.20

60.26

61.94

62.09

61.87

62.07

62.31 60.48

60.51

60.57

60.21

60.48

59.27

62.79

62.21

61.70

61.33

60.92

60.32

59.73

59.19

58.73

58.26

58.89

58.53

59.00

59.33

60.24

60.89

60.56

61.72

61.10

59.45

58.56

57.39

58.16

57.77

57.38

57.36

57.19

57.49

57.15

57.35

57.52

57.12

59.15

62.76

62.73

62.90

62.77

62.84

61.89

61.32

60.64

60.48

59.70

51.97

52.21

52.27 56.19

56.72

50.47

52.23

52.26

53.11

54.70

55.16

55.12

54.43

53.13

52.64

53.58

54.63

55.30

56.18

56.80

55.17

54.58

53.45

54.24

53.90

55.11

54.53

54.79

55.43

54.54

53.77

52.76

56.86

52.14

.

50.27

49.13

49.23

48.44

51.51

50.49

48.53

49.42

52.15

48.78

49.52

52.62

52.52

52.27

44.20

43.84

.

44.07

43.75

51.57

51.61

50.33

48.90

47.87

43.56

42.59

51.67

47.44

48.11

47.88

40.03

44.13

43.69

43.60

43.52

40.59

39.79

39.54

62.98

66.41

68.85

68.85

71.34

71.83

75.68

65.81

72.92

60.93

64.18

62.31

62.64

62.97

63.98

62.95

51.71

51.62

53.63

56.05

55.92

56.10

58.71

58.90

55.24

54.46

54.32

58.64

56.53

57.33

57.11

51.12

42.67

44.48

47.53

47.51

43,92

49,09

62.15

.

55.45

53.59

46.23

47.08

.

.

40,24

47,09

48,06

56,86

55

55.14

55

60

50

J.D.

J.D.

68.00

64.00

60.00

63.00

61.90

J.D.

1

1

1/5000

Location Plan

Ground Floor

East Elevation

1/500

Section 1

North-West view Courtyard view Planetarium Room


Almeida Garrett Library

Designation:

Almeida Garrett Library and Expositions Gallery in the Garden of Palácio de

Cristal, Porto

Design Date:

1994 - 2000

Site Area:

6 370 m 2

Gross Floor Area:

6 970 m 2

Client:

Porto City Council

Location:

Porto, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

Simone Giostra, Arq.

Luísa Pinto, Arq.

João Soares, Eng.

View from East, Entrance by the “Palácio de Cristal” gardens


18.68

30.77

6.59

22.55

8.57

6.37

17.66

6.28

6.26

23.53

19.74

13.37

9.31

22.30

0,190

6,109

0,750

0,070

0,195

40.88

0,995 0,610

1,080

2,131

0.92

1,430

0,210

0,980

0,980 1,100

0,085

0,750

0.07 1.88 0.07

2.43

0,085

0,240

0,750

1.41

41.37

0,920

1,430

20.34

59.11

54.23

54.41

53.27

60.37

56.86

62.95

66.52

74.02

75.33

70.61

76.56

Location Plan

1/5000

Section 1

1/500

-1 Floor

R u a d e E n t r e Q u i n t a s

Expositions Area

1

1

1

1

-2 Floor

R u a d e E n t r e Q u i n t a s

Reading Room and Library


House in Viana do Castelo

Designation:

House in Viana do Castelo

Design Date:

1997 - 2000

Site Area:

1 150 m 2

Gross Floor Area:

300 m 2

Client:

António Flores

Location:

Viana do Castelo, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

View from South-West, access road


01

05

03

02

04

04

01 03

02

05

Floor Plan 1/500

North Elevation, entrance 1/200

View of the garden and South façade


Requalification of the surroundings of Nossa

Senhora da Conceição Church

Designation:

Requalification and landscape design of the surroundings of Nossa Senhora

da Conceição Church in Foz do Douro, Porto

Design Date:

1998 - 2000

Site Area:

4 124 m 2

Gross Floor Area:

4 124 m 2

Client:

Porto City Council

Location:

Porto, Portugal

Co-Authorship/Collaboration:

João Soares, Eng.

North-East view


Fechado

Fechado

OBRAS

Nao estavam

~

DE

DIOGO

RUA

DO

PADRE

MOREIRA

LUIS

CABRAL

1

3

4

5

2

2

6

2

7

2

6

6

8

8

8

12

8

8

8

9

11

10

11

11

1.1

10

BOTELHO

RUA

PADRE

DO

RUA

HENRIQUE

DE

RUA

E

D

C

B

A

F

G

H

I

K

L

J

2

1

2

3

M

N

O

P

R

S

T

Q

DOS

LUIS

DE

DIOGO

RUA

DO

PADRE

MOREIRA

LUIS

CABRAL

1

3

4

5

2

2

6

2

7

2

6

6

8

8

8

12

8

8

8

9

11

10

11

11

10

BOTELHO

RUA

PADRE

DO

RUA

HENRIQUE

DE

RUA

E

D

C

B

A

F

G

H

I

K

L

J

2

M

N

O

P

R

S

T

Q

LUI

1

1

1/5000

Location Plan

1/1000

1/1000

Elevation 1

Site Plan


AvePark

Designation:

Urban Plan, Núcleo Central and Central Plaza of AvePark - Parque de

Ciência e Tecnologia do Porto (Science and Technology campus of Porto) -

Pólo do Vale do Ave (Vale do Ave Center)

Design Date:

2000 - 2002

Site Area:

1 227 200 m 2

Gross Floor Area:

2 950 m 2

Client:

Associação do Parque de Ciência e Tecnologia do Porto

Location:

Caldas das Taipas, Guimarâes, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Pedro Carneiro, Arq.

João Soares, Eng.

North view


140

140

140

140

150

150

150

150

140

140

150

150

150.0

150

150

160

150

150

160

170

170

180

180

190

190

160

170

2 0

160

170

2 0

210

210

180

180

150

150

150

150

210

210

220

20

190

2 0

230

210

250

20

240

260

260

180

240

190

2 0

210

260

230

20

230

190

2 0

230

210

250

20

240

260

260

180

240

190

2 0

210

260

230

20

230

152.0

150.0

140

140

140

140

150

150

9

10

Ascensor nº 1 Ascensor nº 2

3

11

4

5

150

150

140

140

150

150

150

150

160

150

150

160

170

170

180

180

190

190

160

170

2 0

160

170

200

210

210

180

180

150

150

150

190

150

210

210

20

20

2 0

230

210

250

20

240

260

260

180

240

190

2 0

210

260

230

20

230

154.0

156.0

156.0

190

200

230

210

250

20

240

260

260

180

240

190

2 0

210

260

230

20

230

Urban and Landscape analysis, Site Plan

1/ 10 000

AREA 3

AREA 1 AREA 2 Crop Fields AREA 4

Landscape analysis, Plans of the different areas

1/ 50 000

4

2nd Floor

2

2

3 3

1

1

4

4

2

2

3 3

1

1

4

1st Floor

1/1000

North Elevation Section 1

Section 2


Former Mines Building in the Engineering Faculty Faculty

Designation:

Remodelation of the former Mines building in the late Engineer Faculty of Porto

University

Design Date:

2007 - 2008

Site Area:

1 370 m 2

Gross Floor Area:

510 m 2

Client:

University of Porto

Location:

Porto, Portugal

Co-Authorship/Collaboration:

João Pedro Carneiro, Arq.

Nuno Felgar, Arq.

Tiago Mendes, Arq.

João Soares, Eng.

View from South, main access by the Plaza


R

R

R

R

R

R

R

R

R

C.C.

R

R

R

R

R

R

R

R

R

R.

R

R

R

R

R

R

R

C.J.

R

R

R

R

R

R

R

R

R

R

R

R

D

R

R

C.C.

C.C.

Site Plan

1/5000

1 1 1 1

Ground Floor

1st Floor

1/500

Section 1

1/500 East view


Housing in Penafiel

Designação:

Housing and offices building in Penafiel

Design Date:

2006 - 2010

Site Area:

680 m 2

Gross Floor Area:

906 m 2

Client:

Dr. Alberto Clemente de Melo e Sousa

Location:

Penafiel, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Pedro Carneiro, Arq.

Joana Silva, Arq.

João Soares, Eng.

North view


90.00

North view

Site Plan

1/1000

South view

1

Plan of 1st and 2nd floor

1/200

1 1

Ground Floor Plan 1/500 Section CORTE 1 CD

1/500


Housing in Ramalde

Designation:

13 housing buildings in Ramalde, Porto

Design Date:

2005 - 2011

Site Area:

3 407 m 2

Gross Floor Area:

4 450 m 2

Client:

Rualma, LDA

Location:

Porto, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Pedro Carneiro, Arq.

João Soares, Eng.

João Pedro Carneiro, Arq.

João Soares, Eng.

View from South, pool and common garden


M

p

L

A

K

B

J

67.62

C

I

D

H

G

E

F

A

B

C

F

D

E

H

I

J

G

K

L

M

M

L

A

K

B

J

C

C`

I

268

D

H

G

E

F

Location Plan

1/5000

West Elevation

1/500

p 67.62

p 67.62

p 67.62

2nd Floor

1st Floor

63.5

63.38

63.32

62.97

62.89

62.87

Ground Floor 1/1000 North-East view

64.29


ICBAS / FFUP

Designation:

ICBAS - Instituto de Ciências Biomédicas Abel Salazar (Abel Salazar

Biomedical Science Institute) and FFUP - Faculdade de Farmácia da

Universidade do Porto (Pharmacy Faculty of Porto University).

Design Date:

2003 - 2012

Site Area:

31 500 m 2

Gross Floor Area:

36 500 m 2

Client:

University of Porto

Location:

Porto, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Pedro Carneiro, Arq.

Ana Sofia Silva, Arq.

João Soares, Eng.

View from South, from the “Palácio de Cristal” gardens

View from West, main access and exterior Plaza


22.30

20.34

54.23

54.41

53.27

56.86

62.95

66.52

74.02

75.33

76.56

ad ad

C.C.

83.99

R

R

R

R

R

C.C.

R

R

R

R

R

R

Site Plan

1/5000

Section 1

1/1000

1 1

View of a landscaped courtyard between buildings

Ground Floor, exterior courtyards' level

1/1000

View of Douro River from the top of a building


Institute of Design - Guimarães

Designation:

Institute of Design facilities in the area of Couros, Campurbis – Ramada

Factory in Guimarães

Design Date:

2010 - 2011

Site Area:

2 735 m2

Gross Floor Area:

2 480 m2

Client:

Guimarães City Council

Location:

Guimarães, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Pedro Carneiro, Arq.

Rita Mier, Arq.

Tiago Mendes, Arq.

Nuno Felgar, Arq.

João Soares, Eng.

South west view of the rehabilitated building

South East view of the new building


3

Ø240

Ø240

Ø240

Ø240

3

RUA D

View of the Expositions Space

Site Plan

1/1000

View of the semi-public covered Plaza

1

1

2

Vi 1.40.3

2

1st Floor 1/500

Section 1

1/500


Secundary School, EB 3 of Santa Maria da Feira

Designation:

New facilities and remodelation of the Secundary School of Santa Maria da

Feira, under the Program of “Parque Escolar”

Design Date:

2009 - 2011

Site Area:

31 520 m 2

Gross Floor Area:

16 300 m 2

Client:

Parque Escolar

Location:

Santa Maria da Feira, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Pedro Carneiro, Arq.

Ana Silva, Arq.

Nuno Felgar, Arq.

Rita Mier, Arq.

Tiago Mendes, Arq.

João Soares, Eng.

Aerial South view


Ho te

G

E

South view of Central Building

B

C

F

A

D

E

Site Plan

1/2000

View of the Library

G

E

B

C

F

2 2

1 1

A

D

E

Ground Floor

5

4

6

3

1/1000

Section 1

1/1000


Secundary School, EB 2, 3 of Estarreja

Designation:

New facilities and remodelation of the Secundary School of Estarreja, under

the Program of “Parque Escolar”

Design Date:

2010 - 2012

Site Area:

27 575 m 2

Gross Floor Area:

15 000 m 2

Client:

Parque Escolar

Location:

Estarreja, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

Ana Ribeiro, Arq.

Filipe Araújo, Arq.

João Pontes, Arq.

João Soares, Eng.

Aerial view of 3D Model

West view of the new Central building


F1.H.1.36.

i=0.5%

i=0.5%

i=0.5%

i=0.5%

i=1.5%

i=1.5%

i=1.5%

i=1.5%

i=1.5%

i=1.5%

i=1.5%

GRELHA

NO PISO 0

View of Central Building

Site Plan

1/2000

View of hall in the Central Building

South Elevation 1/2000

1st Floor

5 10 20


Secundary School, EB 2, 3 of Gafanha da Nazaré

Designation:

New facilities and remodelation of the Secundary School of Gafanha da

Nazaré, under the Program of “Parque Escolar”

Design Date:

2010 - 2012

Site Area:

27 000 m 2

Gross Floor Area:

13 350 m 2

Client:

Parque Escolar

Location:

Gafanha da Nazaré, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

Ana Ribeiro, Arq.

Filipe Araújo, Arq.

Inês Costa, Arq.

João Pontes, Arq.

Mónica Alves, Arq.

João Soares, Eng.

North view of Classrooms building


800L

800L

8 0L 8 0L

B

funcionário

Ap Ap Ap Ap

G

F

P P

Ap

P

F

B

Arquivo Periódicos

Arquivo Periódicos

Arquivo Novidades

Cf.8

Cf.9

East view, courtyard

Site Plan

1/2000

View of the Cafetaria

funcionário

1

1

Ag Ag

Videoprojector

Tela de

projecção

Ground Floor Plan

5 10 20

Section 1

Cota ref. 10.00

5 10 20


Plaza, Cafetaria and Urban e Requalification of

Arouca’s Historic Center and Municipal Park

Designation:

Plaza, Cafetaria e rehabilitation of the Municipal Park and surrounding public

spaces of the Arouca´s Monastery

Design Date:

2010 - 2013

Site Area:

34 400 m 2

Gross Floor Area:

460 m 2

Client:

Arouca City Council

Location:

Arouca, Portugal

Co-Authorship/Collaboration:

João Pedro Carneiro, Arq.

Julião Soares da Eira, Arq.

Mónica Alves, Arq

Nuno Felgar, Arq.

Rita Mier, Arq. .

Tiago Mendes, Arq.

João Soares, Eng.

View of the Plaza


C

2

2

Alameda D. Domingos

Alameda D. Domingos

0. 0 0.9 3 1. 39 1.568 1.796 2.024 2.252 2.480 2.6 3 3.272

R. D. Afonso Henriques

R

R

R

R

R

R

R

Site Plan

1/5000

1

1

Section 1

Plaza Floor Plan 1/1000 Section 2

1/1000

Av. 25 de Abril and Municipal Park of Arouca

Cafetaria Floor Plan

1/500

Cafetaria and access to the Park


Porto Business School

Designation:

New facilities of PBS - Porto Business School in Matosinhos

Design Date:

2011 - 2013

Site Area:

16 500 m 2

Gross Floor Area:

9 000 m 2

Client:

University of Porto Business School

Location:

Matosinhos, Porto, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Pedro Carneiro, Arq.

Julião Soares da Eira, Arq.

Mónica Alves, Arq.

João Soares, Eng.

East view


Gás

Site Plan

1/5000

South Elevation

East Elevation

1/1000

2

6 6

5

1 1

5

4 4

3 3

2

1st Floor

1/1000


Parque dos Continuadores Complex

Designation:

Architecture Design of the new facilities of Parque dos Continuadores Athletic

Complex – Integrated Urbanistic Operation of conversion of the existent Sports

Facilities and Construction of Offices, Comercial and Housing Buildings in

Maputo, Mozambique

Design Date:

2011 - 2013

Site Area:

6 575 m 2

Gross Floor Area:

57 687 m 2

Client:

Parque dos Continuadores

Location:

Maputo, Moçambique

Co-Authorship/Collaboration:

Pedro Martins, Arq.

Julião Soares da Eira, Arq.

View of the Athletic Field over the Spectator Stands


Biceps Triceps

Functional Trainer

Shoulder Press

Fly

Lat/Row

Leg Extension

Inner/Outer

Chest Pre s

Multi Hip

Assisted Chin

VERTICAL KN E RAISE

FLAT BECH

DECLINE BENCH

INCLINE BENCH

ROMAN BENCH

ABDOMINAL BOARD

PAPEL

90L

INDIF

90L

PAPEL

90L

INDIF

90L

Elevation by the Av. Mártires da Machava

1/1000

SE

SE

acesso ao

campo de jogos

rampa de acesso

ao estacionamento

entrada

habitação

entrada

escritórios

acesso

habitação

ZONA COMERCIAL

entrada

comércio

entrada

escritórios

ÁREA CULTURAL

E SOCIAL

SE

SE

acesso

restaurante

acesso ao

campo de jogos

ENTRADA

DE PÚBLICO

acesso

à bancada

SE

entrada

desportistas

SE

ZONA COMERCIAL

ÁREA

TÉCNICA

INFRA-ESTRUTURA

COMPLEMENTAR

rampa de

acesso ao

estacionamento

entrada

escritórios

SE

SE

entrada

comum

acesso

parque

GINÁSIO

entrada

habitação

acesso

à bancada

SE

ENTRADA

DE PÚBLICO

SE

SE

Ground Floor Plan

1/1500

South view

View of the Athletic Field


Secundary Schools and Agrarian Institutes in

Mozambique

Designation:

Architecture Design of two Secundary Schools and two Agrarian Institutes in

Mozambique

Design Date:

2012 - 2013

Site Area:

Majune 22 750 m 2 Lichinga 12 890 m 2

Namuno 17 840 m 2 Balama 22 630 m 2

Gross Floor Area:

Majune 14 480 m 2 Lichinga 6 890 m 2

Namuno 11 250 m 2 Balama 14 480 m 2

Client:

Ministery of Education and Culture of Mozambique

Location:

Majune, Namuno, Lichinga e Balama, Mozambique

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Pedro Carneiro, Arq.

Julião Soares da Eira, Arq.

João Soares, Eng.

Agrarian Institute of Balama

Secondary School of Lichinga


12 Lugares

H

H

8 Lugares

12 Lugares

C1

C1

C2 C2

1/25 000

Site Plan

Floor Plan of the Facilities area 1/5000

Location Plan 1/100 000

Secondary School of Namuno

Agrarian Institute of Majune


ICBAS / FFUP Cafetaria expansion

Designation:

Cafetaria expansion and new workshops rooms of ICBAS, (Abel Salazar

Biomedical Science Institute) and FFUP (Pharmacy Faculty of Porto

University)

Design Date:

2014

Site Area:

386 m 2

Gross Floor Area:

553 m 2

Client:

Universidade do Porto

Location:

Porto, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

Julião Soares da Eira, Arq.

João Soares, Eng.

Interior view of the cafetaria from the double-ceilinged area


22.30

sandes e bebidascafé

café sandes e bebidas

20.34

54.23

54.41

56.86

66.52

74.02

75.33

83.99

R

R

R

R

R

C.C.

R

R

R

R

R

R

Location Plan

1/5000

LIMITADORES

PAVIMENTO ADEQUADO PARA DESLOCAR CARRINHOS DE TRANSPORTE DE MERCADORIAS E RESÍODOS

lixo

cais

PREPARAÇÃO DE ALIMENTOS (PRATO DO DIA)

CONFECÇÃO DO PRATO DO DIA

PREPARAÇÃO DE SANDES E SALADAS

controlo

REFRIGERADOS

CAFETARIA - SNACK

Linha 1 Linha 2

copa suja

LINHA DE SELF-SERVICE

vending

micro-ondas

mesa c/ bancos altos

p/ refeições rápidas

Floor Plan

1/500

View of cafetaria and self-service area on the right

Views of the 1st floor circulation bridge over the double-ceilinged area of the cafetaria


Students Pavilion for ICBAS / FFUP

Designation:

New Students Pavilion on the former military parade of ICBAS, (Abel Salazar

Biomedical Science Institute) and FFUP (Pharmacy Faculty of Porto

University)

Design Date:

2014

Site Area:

690 m 2

Gross Floor Area:

690 m 2

Client:

Universidade do Porto

Location:

Porto, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

Julião Soares da Eira, Arq.

João Soares, Eng.

South view from the main exterior platform


22.30

20.34

54.23

54.41

56.86

66.52

74.02

75.33

83.99

R

R

R

R

R

C.C.

R

R

R

R

R

R

Location Plan

1/5000

vending

M. LAV. M. LAV.

CHAV. LOUÇA

Floor Plan

1/500

View of the access to the Pavilion entrance

Interior view

View from the exterior platform of the level 3


2.640

2.200

1.900 1.300 950

1.790 2.640

3.990

950

2.200

Azores Fish Market rehabilitation

Designation:

Rehabilitation of the old Fish Market in Vila Franca do Campo, Azores, into a

Restaurants' Mall

Design Date:

2017

Site Area:

493 m 2

Gross Floor Area:

493 m 2 + 203m 2 (exterior spaces)

Client:

Vila Franca do Campo Town Hall

Location:

Vila Franca do Campo, São Miguel island, Azores, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arch.

Julião Soares da Eira, Arch.

João Pedro Carneiro, Arch.

João Soares, Eng.

1.206 2.220

Corte 4

Corte 6

Corte 7

Corte 3

1/100

Section (C3)


Alçado Sul, Parte 1

2

2

1

1

Planta, Parte 1

GÁS

GÁS

VN9

VN9

VN9

AV. Vasco da Silveira

1.222 5.451 5.221 5.052 5.257 6.888

6.888

BB15

téc.

6,7m2

VA3.1

BB15

VA2.1

158,1m2

VN4.1

VN4.2

1 VA4.1 VA4.2 VA4.3

1

VA2.2

VA3.2

VA3.2

218

218

VN3 VN3

4.173 8.016 3.784

4.173 8.016 3.784 3.484

BB15

BB15

BB15

BB15

BB15

BB15

BB15

A A A A A

BB15

BB15

BB15

A A A



BB20

caldeira

aq. água

INDIF

INDIF

INDIF

INDIF

INDIF

11




90L

90L

90L

90L

90L

90L

90L

90L





Secos

Tubérculos

Indiferenciados

Prod. Químicos

12

esp.

VN10.1 VN10.2 VN10.3 VN10.4 VN10.5

VN6 VN7

3 12 lixo

13

Congelados e Refrigerados

VN6 VN7

3 4 4

2.790

VN2.2

2.790

VA5.1 VA5.2 VA5.3 VA5.4 VA5.5

VN2.2

VN8.1

VN8.1

BB20

RACR RACR RACR RACR RACR RACR

14

RACR

14

5

218

1.222 5.451 2

5.221 2


5.052 5.257 6.888

4.173 8.016 3.784 3.484


vest. func vest. func

Copa Suja

alçapão vest. func vest. func

de acesso

ao alçapão

4.599

de vão do

6.1 6.2

telhado

acesso

ao vão do

6.1 6.2

Farinhas

caldeira

BB20

telhado


aq. água

INDIF

INDIF

INDIF

INDIF

INDIF

BB20

90L

90L

90L

90L

90L

90L

90L

90L

11

COZINHA TRADICCIONAL PORTUGUESA

Q.E.

BB20

Secos

Tubérculos

VN2.1

Q.E.

Indiferenciados BB20 Prod. Químicos

Apoio comum (Pasta, Sushi e Fast-food)

Cozinha de Apoio

Preparação alimentar

Preparação de Massas cruas

12 lixo

13

esp.

VN2.1

VN10.1 VN10.2 VN10.3 VN10.4 VN10.5 Congelados e Refrigerados

VN6 VN7

3 3 4 4

1 1

circulação

2.790

VN2.2

VA5.1 VA5.2 VA5.3 VA5.4 VA5.5

circulação

7

8

VN8.1

14

VN1

VN1

5

BB20

BB20

BB20

grelha pluvial

sanitários

BB20

2

2

WC Masc.

WC Fem.

grelha pluvial

sanitários

atendimento

WC Masc.

WC Fem.

10.1 Copa Suja

10.2

10.1

vest. func

9

10.2 vest. func


alçapão

de acesso

VCR

téc.

6,7m2

VCR

A

A A

A

VCR VCR

VCR VCR VCR VCR VCR VCR VCR VCR

VA3.1

A

A

A

VCR Viroc 0,0-0,95m; Celenite 0,95-4,17m; Reboco 4,17m-tecto

RACR Reboco s/ acabam. 0,0-0,95m; Azulejo 0,95-2,25m; Celenite 2,25-4,17m; Reboco 4,17m-tecto

A Azulejo 0,0m-tecto

Alçado Sul, Parte 2

PIZZAS PASTAS SUSHI BAR FAST-FOOD (hamburguers, pregos, saladas,pré-cozinhados, saladas) COZINHA TRADICCIONAL PORTUGUESA

VA2.1

VN4.1

sala de refeições

158,1m2

VA4.1 VA4.2 VA4.3

VA2.2

VN4.2

Planta, Parte 2

1 Sala de Refeições

2 Atendimento

3 Cozinhas

4 Armazenamento-Apoio Copa

A

VA3.2

2

1

5 Copa Suja

6.1 Vestiário Masc.

6.2 Vestiário Fem.

7 Átrio

RACR RACR VCR VCR

VCR VCR

A

A

A

A

A

A

VN3

A

A

A

A

grelha pluvial

8 Circulação

9 Hall WCs

10.1 WC Masc.

10.2 WC Fem.

7,6m 2

7,6m 2

entrada

entrada

VN2.1

7

7

A A

WC Mob. Red.

BB20

WC Mob. Red. circulação

VA8.3

7

8

BB20

(à cota VA8.3 superior)

(à cota superior)

4.051 3.054 4.962

4.051 3.054 4.962

VN1

7,6m 2

entrada

10.3 WC Mobilidade Reduzida

11 Espaço Técnico - Gás

12 Circulação-Lixos

13 Arrumo Exterior

14 Pátio

7

sanitários

WC Masc.

WC Fem.

00 31.07.2017 Primeira emissão

revisão 10.1 data descrição 9

10.2

desenhou aprovou

requerente

Município de Vila Franca do Campo

projecto

Arranjo do Antigo Mercado do Peixe

título

Vi 2.5 Vi 2.5

Q.E.

BB BB 1

BB BB 1

Planta e Alçado Sul - Parte 1

Vi 3.1

3.1

BB15 BB15

6 6

10.3

10.3

6

6

2.140

BB15 BB15

Vi 3.3

Vi 3.3

2,9m 2

2,9m 2

Vi 2.1

2.1

Vi 1.1

Vi 1.1

BB BB BB 1 5,4m 2

5,4m 2 BB 1

5,4m 2

N

Vi 3.2

3.2

7

BB15 BB15

projecto de arquitectura

4.051 3.054 4.962

Vi 2.5

Vi 3.1

6

10.3

Vi 3.3

2,9m 2

VA8.3

(à cota superior)

6

ao vão do

telhado

WC Mob. Red.

Vi 2.1

Vi 3.2

6.1

Vi 1.1

BB BB 1 1

BB BB 1

Vi 2.4

2.4

BB BB 1

Vi 2.3

2.3

Vi 2.4

Vi 1.2

Vi 1.2

A

Vi 2.2

2.2

Rua da Restauração 83, 2º

4050 503 Porto

+351 22 609 70 54

josesoaresarq@gmail.com

serviço

serviço

projecto de especialidades

fase

especialidade

desenho nº

Projecto de execução

Arquitectura

PE.006

escala

data

1:50 31.07.2017

Vi 2.3

Vi 1.2

5,4m 2

6.2

Vi 2.2

A

A

VN5 VN5

VN5

1

7

1

2

serviço

1

7

7



rev.

00

190

423

190

423

INDIF

90L

VIDRO

INDIF

90L

VIDRO

INDIF

90L

VIDRO

INDIF

90L

VIDRO

INDIF

90L

EMBAL

INDIF

90L

EMBAL

4.599


esplanada

esplanada

BB20

1 Sala de Refeições

2 Atendimento

3 Cozinhas

4 Armazenamento-Apoio Copa

5 Copa Suja

6.1 Vestiário Masc.

6.2 Vestiário Fem.

7 Átrio

8 Circulação

9 Hall WCs

10.1 WC Masc.

10.2 WC Fem.


VN8.2

Arrumo

VN8.2

Arrumo

2

2

10.3 WC Mobilidade Reduzida

11 Espaço Técnico - Gás

12 Circulação-Lixos

13 Arrumo Exterior

14 Pátio


revisão data descrição desenhou aprovou

requerente

Município de Vila Franca do Campo

projecto

Arranjo do Antigo Mercado do Peixe

título

00 31.07.2017 Primeira emissão

Planta e Alçado Sul - Parte 2

N

projecto de arquitectura

Rua da Restauração 83, 2º

4050 503 Porto

+351 22 609 70 54

josesoaresarq@gmail.com

projecto de especialidades

fase

especialidade

desenho nº

Projecto de execução

Arquitectura

PE.007

escala

data

1:50 31.07.2017

RACR VCR

VCR

A

A

rev.

00

A

A

grelha pluvial

Vi 2.5

i 3.3

Location

Rua dos Oleiros

Atlantic Ocean

1/4000


Site Plan

RUA DOS OLEIROS

1/500

1.788

1.788


VA1.1

VA1.1

BB20

RACR

VA8.1

(à cota alta)

VA8.1

(à cota alta)

BB20


3 3 3

3

1.704

1.704

VA8.2 VA8.2

(à cota cota alta) alta)

VA8.2

(à cota alta)

4 4 4

4 4

3.118 2.450 3.118 3.042 2.450 1.908

3.042 1.908

BB20

átrio

átrio 15,7m 2

15,7m 2

2,1m 2

8,5m 2 2,1m 2 8,5m2

8,5m 2 8,5m2

BB20

átrio 15,7m 2

2,1m 2

8,5m 2 8,5m2

BB20

BB20 BB20

grelha pluvial

3.118 2.450 3.118 3.002 2.450 1.948

3.002 1.948

5,4m 2 7,7m2

grelha grelha pluvial pluvial

5,4m 2 7,7m2

EMBAL

90L

EMBAL

90L

PAPEL

90L

PAPEL

90L


5 5 5

5

PAPEL

90L

PAPEL

90L

1.908

12 13

1.908

Main Façade

12 13

BB20

1/500


Floor Plan

Façade to the street


1.222 5.451 5.221 5.052 5.257 6.888

218

4.173 8.016

1

2

1.788

GÁS

BB20

11

esp.

VA1.1

VCR

VA8.1

VCR

RACR

(à cota alta)

BB15

BB15

BB15

BB15

téc.

6,7m2

BB20

Farinhas

VA3.1

VA2.1

158,1m2

VA4.1 VA4.2 VA4.3


Secos

Apoio comum (Pasta, Sushi e Fast-food)

Cozinha de Apoio

Preparação alimentar

Preparação de Massas cruas

VN10.1 VN10.2 VN10.3 VN10.4 VN10.5 Congelados e Refrigerados

3 3 4

A

A A


VA5.1 VA5.2 VA5.3 VA5.4 VA5.5

2

atendimento

PIZZAS PASTAS SUSHI BAR FAST-FOOD (hamburguers, pregos, saladas,pré-cozinhados, saladas) COZINHA TRADICCIONAL PORTUGUESA

1 1

VN4.1

3 3

sala de refeições

BB15

VN4.2

BB15

BB15

A A A A A A A

A

A

A

RACR RACR RACR RACR RACR RACR

VCR VCR VCR VCR VCR VCR VCR VCR

VA2.2

VCR Viroc 0,0-0,95m; Celenite 0,95-4,17m; Reboco 4,17m-tecto

RACR Reboco s/ acabam. 0,0-0,95m; Azulejo 0,95-2,25m; Celenite 2,25-4,17m; Reboco 4,17m-tecto

A Azulejo 0,0m-tecto

2

VA3.2

1.704

caldeira

aq. água

A

A

VA8.2

(à cota alta)

VN3

VN2.2

VN2.1

átrio

7,6m 2

VN1

4 4

entrada

7

7

Tubérculos

3.118 2.450 3.042 1.908

14

5

Copa Suja

a

de

a

BB20 BB20

BB15

4.051 3.054

A

BB20

Q.E.

8

BB20

sanitários

WC Masc.

2,1m 2

8,5m 10.1

2 9

10.3

2,9m 2

BB11

BB11

WC M

BB20

VA8.3

(à cota supe

Vi 3.1

BB15

6

6

BB15

1 Sala de Refeições

4 Armazenamento-Apoio Copa

6.2 Vestiário Fem.

9 Hall WCs

10.3 WC Mobilidade Reduzida

13

Arrumo Exterior

2 Atendimento

5 Copa Suja

7 Átrio

10.1 WC Masc.

11 Espaço Técnico - Gás

14 Pátio

3 Cozinhas

6.1 Vestiário Masc.

8 Circulação

10.2 WC Fem.

12 Circulação-Lixos

1/200

Floor Plan Detail - Dining and open kitchen area


evisão data descrição desenhou aprovou

requerente

projecto

projecto de arquitectura

Rua da Restauração 83, 2º

4050 503 Porto

+351 22 609 70 54

josesoaresarq@gmail.com

projecto de especialidades

revisão data descrição desenhou aprovou

requerente

projecto

título

projecto de arquitectura

fase

escala

Rua da Restauração 83, 2º

4050 503 Porto

+351 22 609 70 54

josesoaresarq@gmail.com

projecto de especialidades

desenho nº

data

rev.

Housing building in Porto

Designation:

Rehabilitation of a building for housing and Airbnb

Design Date:

2018

Site Area:

118 m 2

Gross Floor Area:

422 m 2 + 177m 2 (exterior spaces)

Client:

Dr. António Torres

Location:

Porto, Portugal

Co-Authorship/Collaboration:

Julião Soares da Eira, Arch.

João Pedro Carneiro, Arch.

João Soares, Eng.

2,50 2,50

2,50 2,50

4,20 3,82 3,50

11,52 3,46

Alçado Traseiras

Corte C3/Alçado Traseiras (Corte pelo pátio exterior)

Alçado Principal

Alçado Tra

1/200

Corte C1

Rear Façade, Longitudinal Section (C1), Main Façade

00 15.06.2018 Primeira emissão

00 15.06.2018 Primeira emissão

António Torres

António Torres

Prédio na R. Formosa

Corte Longitudinal

Projecto de execução

especialidade

Arquitectura

0.09

00

Prédio na R. Formosa

1/50

11SET 2018


projecto

Rua da Restauração 83, 2º

4050 503 Porto

+351 22 609 70 54

josesoaresarq@gmail.com

00 15.06.2018 Primeira emissão

António Torres

requerente

projecto de arquitectura

projecto de especialidades

Espaço de Lavandaria e arrumos com abertura para pátio exterior e acesso ao jardim

revisão data descrição desenhou aprovou

00 15.06.2018 Primeira emissão

Espaço de Lavandaria e arrumos com abertura para pátio exterior e acesso ao jardim

MSR

MLR

estendal

de tecto

MSR

MLR

estendal

de tecto

MSR

MLR

estendal

de tecto

Apartamentos T0 para Alojamento Temporário, (AirBnB)

Apartamentos T0 para Alojamento Temporário, (AirBnB)

Apartamentos T0 para Alojamento Temporário, (AirBnB)

VNi1.1 VNi1.2

DP

DP

BA

BA

BA

BA

P

P

VNi1.1 VNi1.2

VAe1.5

DP

DP

BA

BA

BA

BA

P

P

VNi1.1 VNi1.2

VAe1.5

DP

DP

BA

BA

BA

BA

P

P

VAe1.5

Apartamento Principal em triplex, Piso Inferior - Entrada e Quartos

Apartamento Principal em triplex, Piso Inferior - Entrada e Quartos

Apartamento Principal em triplex, Piso Inferior - Entrada e Quartos

11SET 2018

1/50

escala

data

Plantas

Pisos 3, 4 e 5

0.07

00

Projecto de execução

Arquitectura

título

fase

desenho nº rev.

especialidade

Prédio na R. Formosa

projecto

Rua da Restauração 83, 2º

4050 503 Porto

+351 22 609 70 54

josesoaresarq@gmail.com

11SET 2018

escala

data

Plantas

António Pisos 3, Torres 4 e 5

0.07

00

Projecto de execução

Arquitectura

desenho nº rev.

projecto de especialidades

fase

projecto de arquitectura

título

requerente

especialidade

Prédio na R. Formosa

projecto

revisão data descrição desenhou aprovou

00 15.06.2018 Primeira emissão

Rua da Restauração 83, 2º

4050 503 Porto

+351 22 609 70 54

josesoaresarq@gmail.com

VAi2.5

António Torres

projecto de especialidades

projecto de arquitectura

Apartamento Principal em triplex, Piso Intermédio - Sala e Cozinha

revisão data descrição desenhou aprovou

00 15.06.2018 Primeira emissão

VAi2.5

Apartamento Principal em triplex, Piso Intermédio - Sala e Cozinha

VAi2.5

VAi3.8

Micro

Forno

Frigo

Cald.

VAi3.8

Micro

Forno

Frigo

Cald.

Apartamento Principal em triplex, Piso Superior (Recuado) - Escritório

Apartamento Principal em triplex, Piso Superior (Recuado) - Escritório

Cobertura

Location

Piso 0, AB:77,8m 2

C3

Piso 0, AB:77,8m 2

Piso 0, AB:77,8m 2

C1

C1 C1C2

C2 C2

VAe0.4

VAe0.4 VAe0.5 VAe0.4 VAe0.5

VAe0.5

TQ

TQ

TQ

TQ

TQ

TQ

C3

C3

C3

C3

C3

C3

C3

C3

C3

Lavandaria

VAe1.3

VAe1.3 VAe1.4 VAe1.3 VAe1.4

VAe1.4

VAe0.2

VAe0.2 VAe0.3 VAe0.2 VAe0.3

VAe0.3

Lavandaria

Lavandaria

13,50 m 2 13,50 m 2 13,50 m 2

Façade to the street

sofá-cama

sofá-cama

sofá-cama

radiador

radiador

radiador

VAi0.2

VAi0.2

VAi0.2

VAi1.2

VAi1.2

Elevador Elevador

Elevador

Elevador Elevador

Elevador

VAi0.1

VAi0.1

VAi0.1

VAi1.1

VAi1.1

VAi1.1

Piso 1, AB:100,7m 2

Piso 1, AB:100,7m 2

Piso 1, AB:100,7m 2

1 1

30,14 m 2 30,14 m 2

2 2

AirBnB

C1

AirBnB

AirBnB

AirBnB

30,68 m 2 30,68 m 2

radiador

radiador

radiador

1

AirBnB

30,14 m 2

2

AirBnB

sofá-cama

sofá-cama

sofá-cama

C1 C1C2

C2 C2

VAi1.2

WC

Casa

(Entrada)

WC

30,68 m 2

VAe1.6

radiador

radiador

radiador

Frigo

Frigo

Frigo

VAi1.4

Termoacumulador

Eléctrico

WC

WC

Casa Casa

(Entrada) (Entrada)

Termoacumulador

Eléctrico

VAi1.3

VAe1.6

VAi1.4

Termoacumulador

Termoacumulador

Eléctrico

Eléctrico

VAi1.3

WC

WC

Frigo

Frigo

Frigo

VAe1.6

VAi1.4

Termoacumulador

Termoacumulador

Eléctrico

Eléctrico

Piso 2, AB:105,8m 2

VAi1.3

C3

Piso 2, AB:105,8m 2

radiador

C3

Quarto 1

radiador

radiador

radiador

C3

Quarto 1

VAi2.2

VAi2.1

Piso 4, AB:33.4m 2

Piso 4, AB:33.4m 2

Piso 3, AB:104.3m 2

Piso 3, AB:104.3m 2

Piso 2, AB:105,8m 2

VNi2.1 VNi2.2

requerente

VNi2.1 VNi2.2

VNi2.1 VNi2.2

1/50

Quarto 2

VNi2.3

C1

VAe2.3

VAi2.6

16,67 m 2

radiador

radiador

C1C2

Quarto 1

VAi2.2

VAi2.1

VAe2.3

VAi2.6

Quarto 2

VNi2.3

Elevador

VAe2.4

VAi2.7

16,67 m 2

30,14 m 2 30,14 m 2 30,14 m 2

30,68 m 2 30,68 m 2 30,68 m 2

17,22 m 2 17,22 m 2 17,22 m 2

VAi2.2

VAi2.1

Quarto 2

VNi2.3

C1

VAe2.3

VAi2.6

Elevador

VAe2.4

VAi2.7

Central stairway

WC

WC

radiador

VAe2.5

WC

VAi2.4

VAi2.3

C2

Elevador

WC

radiador

VAe2.4

C3

C3

VAe2.5

VAi2.7

16,67 m 2

WC

VAi2.4

VAi2.3

WC

C2

radiador

C3

VAe2.5

VAi3.6

29,80 m 2

VAi3.2

VAi2.4

VAi3.1

VAi2.3

C1

VAe3.3

30,87 m 2

radiador

radiador

C3

VAi3.6

radiador

C1

VAe3.3

29,80 m 2

VAi3.2

VAi3.1

Sala de

Jantar

Elevador

30,87 m 2

VAi3.7

VAi3.5

VAe3.4

Sala de Estar

radiador

radiador

C2

Cozinha

VAi3.4

Sala de

Jantar

Elevador

VAi3.7

VAi3.5

VAe3.4

Sala de Estar

VAe3.5

radiador

ML radiador

C2

Cozinha

VAi3.4

VAi3.3

C3

VAe3.5

VAi3.3

ML radiador

C3

Terrace on 4th Floor

C1 C1

C2 C2

VAe4.3

VAe4.3

radiador

radiador

radiador

radiador

VAe4.1

VAe4.1

VAe4.2

VAi4.1

VAi4.1

Escritório Escritório

24,59 m 2

24,59 m 2

VAe4.2

radiador

radiador

radiador

radiador

radiador

radiador

VAe3.1

VAe3.1

VAe3.2

VAe3.2

VAe1.1

VAe1.1

VAe1.2 VAe1.1

VAe1.2

VAe1.2

VAe2.1

VAe2.1

VAe2.2 VAe2.1

VAe2.2

VAe2.2

VAe0.1

VAe0.1

VAe0.1

C1 C1 C1C2

Ground F

1/200

C2

C2

C1

1st F

C1

C1C2

C2

C2

2nd F

C1

C1

C1C2

C2

C2 C1

3rd F

C1

C2

C2

4th F

C1

C1

C2 C2

Floor Plans


2,50

5, 0

1, 0

Ce4

Ce5

Ce5

Ce5

Ce4

Ce4

Ce5

Ce4

Gk

Gk

Gk

Gk

Gk

Gk

Gk

Gk

L a r g o D .S a n c h o

2,50

3,70

3,00

2,85

2,60 2,60 3,70 3,00 2,85

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ce1

Ce1

Ce1

P3

Ap

Ce3

Ce2

Ce2

Ce2

Ce6

4,50

+0.15

-0.09

+0.06

-0.09

+0.06

+0.15

0. 0

R . D . Afonso Henriques

Estacionamento

50lug.

Ex

Ex

Cat

Cat

291.40 291.95

292.16

286. 4

286.40

Estacionamento

17lug.

0.00

Ap

Ap

Ap

Estacionamento

6lug.

Ap

Ap

R . Eça de Queirós

P1

3,25

5,00 0,50 5,00

B

B

coberto

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ap

Ecoponto existente

Arouca Urban Plan

Designation:

Urban Requalification Plan for the West Area of Arouca village, Portugal

Design Date:

2017 - 2019

Site Area:

55 122 m 2

Gross Floor Area:

3 Phases:

43 586 m 2 + 7 576m 2 + 3 960m 2

Client:

Arouca City Hall

Location:

Arouca, Portugal

Co-Authorship/Collaboration:

Julião Soares da Eira, Arch.

Pedro Martins, Arch.

João Pedro Carneiro, Arch.

João Soares, Eng.

R . d o s N a m o r a d o s

1,51

3,96 3,04

2,09

P2

N 3 2 6

3,50

3,50

3,50

2,99 3,70 2,05

2,20

P2

Estacionamento

5lug.

Variante à N3 2 6

paragem autoca ros

R . M e r c a d o

paragem táxis paragem táxis

Estacionamento

6lug.

telefone

táxis

abrigo

táxis

C1 C1

4,17

3,50 3,50 3,50 3,50

6,00 4,70 4,70 3,43

2,00

4,50 3,70 4,50 7,00 4,50 3,70 4,53

C2 C2

2,00 2,00

3,50 3,50

2,00

P4 P4

2,00

2,87

4,00

4,00

2,00

10,00

2,00

6,70

Área Bicicletas -

Ace so Ciclovia

Aparcamento e Ca regamento d e-Bikes Aparcamento Sharing e Ca regamento d e-Bikes Sharing

Painéis Fotovoltaicos planos (deitados) na cobertura

paragem autoca ros

4,75

5,00

6,00

5,00

Estacionamento

21lug.

ca regamento

de V.E.

(2lug.)

Edifícios (a manter)

destinados ao apoio do

Turismo e Ambiente

espaço de paragem para

espera de autocarros

C3 C3

P3

P2

4,50

2,66

3,50 3,50 3,50 3,13 2,00

R . R o s a S a c r a m e n t o

Estacionamento

80lug.

R . S u b -R i b e s

18 lug. est.

R . R o s a S a c r a m e n t o

1/2500

Site Plan


2,50

0,70

5,75

4,25

3,92

9x8=72

3,24

1,26

7,50

14,24

4,94

4,95

0,11

1,20

4,15 2,24 10,00 1,65 1,91

7,23 0,78

8,97

7,50

0,45

3,69

2,50

requerente

Linha de Corte pelo

Terreno Existente

Câmara Municipal

de Arouca

projecto de arquitectura

5%

284,45 Cota altimétrica do Terreno Existente

284,60

Cota altimétrica de Projecto

Rua da Restauração 83, 2º

4050 503 Porto

+351 22 609 70 54

josesoaresarq@gmail.com

projecto

PROJECTO DE ARQUITECTURA PARA A REQUALIFICAÇÃO URBANÍSTICA DO LARGO D. SANCHO I E ZONAS ENVOLVENTES

título fase desenho nº

rev.

PERFIS P.E. 04

00

escala

1/100

data

ABR 2017

286. 4

286.40

3,86

2,50

6,36

0,11

2,39

0,11

0.00

2,39

40,52

5,5% 5,5%

7,50

4,00

1,00

2,50

7,50

8,21

6,20

4050 503 Porto

2,50

+0.15

+0.15

0.00

21,226 m 2

1,75

Ap

288.94

1,15

Ce2

56,67

288.72

289.21

6,36

291.01

290.815

290.43 290.62

290.10

0,25

1,15

Ce3

4 lug. est.

2,00

1,75

Ap

288.71 288.89

15 lug. est.

3,86

90°

2,50

Ap

288.38

287.64

288.46

286.44

Location

3,25 1,25 3,25 3,00 8,56

03 288.61 288.36

287.94

1,42 1,75 5,37 9,94

0,11

0,25

17,83

0,40

6,3

0,11

2,39

2,57

289.51

289.49

289.54 289.01

R 2,00

R 6,00


R 95,00

2,50

2,39

0,11

2,50

R 8,00

R 100,00

3,86

4,15

5,86

90°

287.62

287.43

59°

P2

289.49

289.51

288.78 288.56 288.31

286.48

286.48

286.44

6,36

Ap

2,50

0,11

2,39

0,11

8 lug. est.

3,86

R 6,00

286.86

101°

R 2,00

286.46

286.40

286.40

131°

7,23

1,25

Ce6

4,15

288.80

14,30

0,11

P4

286.49

290.50

19,23

289.11

289.11

1,20

289.56

288.87

289.06

20,85

11,19

287.61

287.42

289.25

122°

R 4,00 R 2,25

R 2,00

122°

122°

286.41

22°

P3

286.48

288.80

286.36

11,65

Cat

286.87

288.95

R 95,00

3,64

288.80

1,20 0,60

0,60

Cat


4,70 7,65

6,92

1,72

288.80

1,93

288.05

288.02

288.80

17,01

3,48

1,99

0,87

2,66

2,93

2,33

3,00

5,55

3,00

34,83

3,00

3,00

0,42

4,02 3,00 3,00 3,00 4,64 3,00 23,03 3,00 3,72 3,00 3,00 2,46

71,57

4,20 2,67

3,93

3,66

R 4,00

2,00 1,75 4,70 1,75 4,70 1,40

R 100,00

288.12

287.96

287.06

288.80

113°

P6 P6

286.20

286.60

8%

286.67

286.12

286.73

286.04

286.49

Estacionamento

17lug.

284.73 284.82

6,70

285.32

2,5% →

1/500

290,53

R 5,50

289,33

289,35

R 8,00

B

131°

289,85

289,70

284.00

289,54

R 4,95

289,91

131°

285.77

284.32

289,11

11,87

4,89

52,38

285.53

12,10

3,59

285.58

287.00

1,77

285.77

P1

286.10

289.25

R . R o s a S a c r a m e n t o

290,19

290,04

288,89

285.79

12,53

1,94

288,54

284.91

6,10

286.06

1,80

285.48

286.16

285.48

285.79

1,40 3,50 1,50 1,50

285.73

285.80

285.93

P5

Floor Plan Detail - Largo D. Sancho I Square

288.80

287.96

287.00

1,94

288,69

286.06

B

290,25

1,94

288,84

288,52

288,67

3,00 3,00 24,56

287,48

287,61

287,77

287,50

287,76

287,92

286,57

287,84

287,84

286,57 286,57

287,59

287,36

Estacionamento

6lug.

286,45

89°

R 5,45

Ap

286,50 286,50

285,91 286,46 286,99 287,45 287,57

287,70

287,86

288,61

288,52

288,67

288,99

7,50

289,69

21,57

288,75

6,20 2,50 8,70 2,50

B

← 2,0% 2,5% → ← 2,5%

2,0% →

1,94

289,84

16,66

7,50

290,31

289,99

4,09

290,14

2,24

1,48

288,57

1,64

289,54

288,71

3,17

3,28

288,86

289,01

1,36

288,71

288,86

289,01

B

3,47

7,50

289,16

8,29

289.11

1/500 Elevation P4 - Largo D. Sancho I Square

288,56

B

2,20

286.88

288.80

288,00

B

286.20

287.43

4,00 2,50 5,12 2,50 5,12 2,50 2,43 5,62 4,22 2,50 7,02 2,50 7,02 2,50 7,02 2,50

3,81

8,89

← 2,0% 2,5% → ← 2,5%

2,0% →

0,28

1,56

287,77

1,56

287,50

287,48

287,465

287,320

287,175

287,030

287,885

286,740

286,595

1,56

288,11

287,610

1,56

0,92

0,75

1,56

287,36

287,59

286.71

3,00 3,00 3,00

1,56

1,56

0,25

1,56

12,33

B

0,80

23°

1,15

8%

90°

R 8,50

Ap

286,50

2,0% →

41°

0,29

286,42

286,27

R 8,00

3,00

5,54

286,58

286,90

286,90

286,05

B

286,14

2,0% →

Ap

7,85

286,34

22,76

286,27

286,42

131°

R 9,50

6,01

Ap

B

135°

45°

286,61

Ap

Ap

286,37

2,05

286,52

286,61

286,37

286,52

2,36

3,00

3,05

Ap

Estacionamento

80lug.

Cubo de granito (0,11m)

Micro-cubo de granito (0,05m)

Micro-cubo de granito (0,05m)

em zonas de atravessamento por veículos

para acesso a garagens

Área ajardinada

R 8,50

90°

286,31

286,18

286,33

41°

0,29

Passadeira em betuminoso (pintura)

Ap

South section of Av. 25 de Abril

45°

Ap

285,96

33,032 m 2

4,22

286,04

B

284,60

R 9,50

285,82

45°

Ap

Ap

Área a incorporar no domínio privado

Área a incorporar no domínio público

Banco de jardim tipo "Larus"

284,45 Cota altimétrica do Terreno Existente

286,06

286,08

45°

C1

286,00

131°

Cota altimétrica de Projecto

37,93

Ap

0,11

2,39

135°

286,10

286,25

Ap

286,29

37,250

Ap

8,06

B

← 2,0% 2,5% → ← 2,5%

2,0% →

2,50 2,93

Ap

-0.09

+0.06

-0.09

+0.06

287.73

requerente

projecto de arquitectura

3,17

8,94

6,77

R . S u b -R i b e s

Câmara Municipal

de Arouca

Rua da Restauração 83, 2º

+351 22 609 70 54

josesoaresarq@gmail.com

projecto

PROJECTO DE ARQUITECTURA PARA A REQUALIFICAÇÃO URBANÍSTICA DO LARGO D. SANCHO I E ZONAS ENVOLVENTES

284,55

37,25

1/500

6%

2,37

19,29

288,79

2,38

288,10

B

289,00

285,60

7.7%

284.36

título fase desenho

PLANTA (Zona 2) P.E.

02

Floor Plan Detail - the new Avenue with larger sidewalks, small square, parking bay and waterway

B

284.238

284.19

escala

data

1/200

P1


Sala de aula.

A actual livraria /

reprografia passa


Sala de aula.



intrusiva.







pretende-se retomar o projecto original,


e aplicando os mesmos materiais de


das infraestruturas.


redimensionamento dos

lugares retomando os





C38.1

C55.1

C55.2

C55.3

C55.4

C55.5

C55.6

C56.1

C55.7

C55.8

C46.1

167

136

paredes

a demolir

estrado novo

139

GABINETE

20,7m2

138

GABINETE

20,7m2

C37

E.1.0

ESCADAS

55,8m2


a demolir

140

137

162

SALA DE AULA

77,3m2

36 lug

163

SALA DE AULA

79,6m2

34 lug

165

SALA DE AULA

160,6m2

92 lug

135

SALA DE AULA

163,0m2

92 lug

134

i.s. F

28,4m2

Pc Pc Pc Pc

Pc Pc Pc

C33.1

C50.2

paredes

a demolir

141

SALA DE AULA

160,0m2

90 lug

140

ARRUMO

7,5m2

137

ARRUMO

7,5m2

134

133

161

AIESEC

20,7m2

166

164

161

162

133 133a

i.s. M


28,5m2

5,1m2

133a

novo

QUADRO EXISTENTE

E.1.1

ESCADAS

19,9m2

132

E.1.1

C.1.0

C.1.0

C.1.0


427,0m2

118

132

i.s. Def

5,9m2

117


207,4m2

157 lug

E.1.0

118

C18

C16.4


C17.4

C17.5

C16.5

C16.6

151

GABINETE

23,2m2

152

GABINETE

16,9m2

C62

Gab. Apoio ao Aluno

SEREIA / GMC

E.2.8

ESCADAS

GABINETE

(a sala de aula passa

(a sala de aula passa

150 13,4m2



C17.6

patamar de

C45.1

C17.7

entrada nascente

C28.3 C28.2 C28.1


GABINETE

149

C61

multibanco

13,4m2

4,4m2


ARRUMO

148

E.1.7


C60

153a 154

C51.1

i.s.

153A

4,9m2

i.s. F 155

17,5m2

i.s. M

C64

17,6m2

C16.7

C16.8

C17.1

C16.1

C16.2

C17.2

C17.3

C16.3

alterar

porta passa a

abrir para fora

demolir porta e

parede clantestinos

C12.1

C2.4

C.1.1

116

C1.1

C50.3

131b

i.s. M

5,0m2

143

131a

i.s. F

7,0m2

131

143

130

130


19,7m2

144

144

GABINETE

13,7m2

145

145

GABINETE

37,4m2

C9.1 C10

C.1.0

C.1.0

m.??

m.??

C42.1

C43.1


pretende-se retomar o projecto original,


e aplicando os mesmos materiais de


das infraestruturas.

ESCADAS

19,9m2

E.1.2

37,4m2

GABINETE

C34.9

C.1.5

42,0m2



redimensionamento dos lugares





infraestruturas.

101

142

BIBLIOTECA

311,0m2

C22.1 C20

C22.2




original.

Pc

Pc Pc

C.1.1

114

125


118,0m2

128


25,6m2


a demolir

122


22,3m2

123

GAB SUB DIRECTOR

16,3m2

124

GAB DIR CONS EXECUTIVO

43,4m2

147

ARRUMO

5,0m2

115 113



115,4m2

115,5m2

51 lug 51 lug

129

115

128

127

142

126

122A

122

125

124

122B

123

151

150

149

152

C13.1

146

148

166


TELEFONISTA

C6.1

113

C13.2

C5.1

C13.3

C63

C6.3

C13.5

10,5m2


153

153

C5.2



C39.2 C39.1 C39.3

m.??

2,9m2

130A

C54

C34.8

m.??

E.1.2

C34.7

PATIO NORTE

m.B6


a demolir

130a

cofre 129

4,1m2 3,2m2

C34.6


parede da secretaria

142A

127

5,4m2

C58


a demolir

C34.5

m.??

126

BASTIDOR

3,3m2

m.B2.1

Caixas de correio

C34.4

porta

a demolir

grade

a demolir

m.B2.2

m.??

C34.3

C.1.3


SECRETARIADO

24,4m2

m.??


redimensionamento dos lugares





infraestruturas.

C.1.4


38,0m2

Caixas de correio

147

ESCADAS

21,5m2

E.1.4

C34.2

m.??

m.??

Caixas de correio

148A

ESCADAS

10,4m2

C49.2

C49.1

E.1.3

m.??

m.B5

C34.1

m.??



C12.2












ESCADAS

13,9m2

Passagem da telefonista para o




acesso de deficientes

C13.4

C.1.1

m.B3

121

ARRUMO

36,8m2

154 155

C13.6 C5.3

C13.7


pretende-se retomar o projecto original,


e aplicando os mesmos materiais de


das infraestruturas.



redimensionamento dos lugares





infraestruturas.

156 157

GABINETE DE APOIO AO ALUNO

SEREIA / GMC

74,0m2 72,5m2

C7.1 C7.2

111


C6.2

C15.1

176,9m2

C15.3

C14.1

95 lug

C.1.1


1244,0m2

Pc

C.1.2





C.1.2

Pc

Pc


727,2m2

121

121A

m.??




destinado a Meeting

point/Vending e arrumos





1

m.??











14,9m2


112

119

119

MEETING POINT / VENDING

108,7m2

80 lug

m.??



estrado

a demolir

156 157

10

112







120

C6.4

109

C53.1

parede a

demolir

m.??




tecto falso intrusivos

120A

120

ARRUMO

36,8m2

estrado

a demolir

C15.2




108


18,8m2

m.??

C5.4

C13.8

C12.3

108

C13.9

m.??

C2.1

C.1.2

C.1.2

101

C.1.2

168

107

160

caixilho

a demolir

E.1.6

ESCADAS

16,1m2


158

FEP JUNIOR

72,6m2

COPA

SUJA

26,8m2

caixilho

a demolir

102

101


306,2m2

342 lug







158

160

BAR

115,9m2

96 lug

Pc

E.1.5

ESCADAS

43,0m2

C27

159


145,0m2

159

Pc

Pc

106

i.s. F

22,8m2

105

i.s. M

23,0m2

102

tecto a

demolir


81,0m2

Pc

C2.2

C2.3


38,6m2

COPA

LIMPA

25,3m2

Pc

Pc

parede a

demolir

Pc

C26

C21.1

C21.2

C21.3

C21.4

C21.5

C44.1

m.A4

COPA

i.s.

4,8m2

103

m.B4

C19


C.1.6


17,4m2

estrado

a demolir

PT07

tampa


103C







Cafetaria

103B

103A




pretende-se retomar o projecto original,


e aplicando os mesmos materiais de


das infraestruturas.

103

51,4m2

m.??

101A

104

C32


escada

023b

requerente

base de ECOPONTO a demolir




para a antiga casa do guarda

retorno

111

211

029

UTA's

16,5m2




PT08

tampa

PT10

tampa

infraestruturas nomeadamentedupla


029

C40.2

014

PT11

tampa

grelhas

015

projecto de arquitectura

C40.1



FRIO

13,0m2

SALA DE QUADROS

24,5m2



BEBIDAS

8,3m2



ARRUMO



porta corta-fogo

na


20,2m2

43,3m2

DESPENSA

escada

11,3m2




paredes e

pretende-se retomar o projecto original,

portas a demolir




e aplicando os mesmos materiais de

GABINETE

4,0m2


001


das infraestruturas.

porta a

demolir

paredes e

porta demolir


015


CALDEIRA

51,3m2




a Fep Junior e A.E.





novo

PISO 1

101

102

103

105

106

108

111

112

113

115

118

119 MEETING POINT / VENDING *

120 ARRUMO *

121 ARRUMO *

122

123 GAB. SUB DIRECTOR

124 GAB. DIRECTOR CONSELHO EXECUTIVO

125

126 BASTIDOR

128

130

131a

131b

132

133

133a

134

135 SALA DE AULA

137 ARRUMO

138 GABINETE

139 GABINETE

140 ARRUMO

141 SALA DE AULA

142 BIBLIOTECA

143 GABINETE

144 GABINETE

145 GABINETE

146 ARRUMO

148

149 GABINETE

150 GABINETE

151 GABINETE

152 GABINETE

153

154

155

156 GABINETE DE APOIO AO ALUNO *

157 SEREIA / GMC

158 FEP JUNIOR *

159

160 BAR*

161 AIESEC

162 SALA DE AULA

163 SALA DE AULA *

165 SALA DE AULA *

166

* FASE POSTERIOR

Faculdade de Arquitectura da Universidade do Porto / CEFA-UP


projecto



fase


escala

PLANTA PISO 1

1/200

C47

C48







cacifos

cacifos

novo

caleira de pavimento

E.0.6

i.s. F

21,0m2

bancada de trabalho

C.0.1


42,2m2



030

OFICINA

27,7m2

002

Pc Pc Pc Pc

ARRUMO

38,1m2

banco

banco

novo

030

C.0.2


62,4m2

010

i.s. M

23,1m2

011

012

ARRUMO

11,7m2

JARDINEIRO

parede a demolir










intrusivas

Pc


Pc Pc


012

pcf

031

009


1,6m2

novo

009

alterar

porta passa a

abrir para fora

013


josesoaresarq@gmail.com


01.04

data

C41

PT3

C59

C50.1

m.A1

017

COPA

017

m.B1

013

6,5m2





porta corta-fogo na



024

025

central

bombas

4,9m2

7,2m2

PT1

016

CAIS


m.A2

018

C52

PT2

paredes e

portas a demolir

016


64,7m2 022





019


50,5m2

021


020

m.A3


020

i.s.

4,1m2

C66

018

ARRUMO 019

4,4m2






G1


7,4m2

pcf

023

027

PT2 parede/muro de suporte

e porta a demolir

novo



pcf

023a

novo

023


UTA's

73,2m2



do guarda noturno e





paredes e

portas demolir

9,9m2



a construir (chilers)

a construir (chilers)





026


TANQUE DE
















































FEP

Designation:

Rehabilitation of FEP - Faculty of Economy of the University of Porto

Design Date:

2016 - 2019

Site Area:

7 164 m 2

Gross Floor Area:

15 879 m 2 + 41 029m 2 (exterior spaces)

Client:

University of Porto

Location:

Porto, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arch.

Julião Soares da Eira, Arch.

Hugo Natário, Arch.

João Pedro Carneiro, Arch.

João Soares, Eng.

LEGENDA

138 139

135 141 165 163

131A 131B

C.1.7


Pc Pc

C35.1

C35.2

C35.3

C35.4

C35.5

C35.6

C35.7

C35.8

C35.9

106 105

G1

-1 F

pcf

032

011 010

caleira de pavimento

1/1000

Ground Floor


pretende-se retomar o projecto original,


e aplicando os mesmos materiais de


das infraestruturas.

AC

C38.2

C55.9

C55.10

C55.11

C55.12

C55.13

C55.14

C57

C55.15

C56.2

C46.2

240

19,8m2

236

GABINETE

C37

238

236

??.??

??.??

GABINETE

24,3m2

238

E.2.0

ESCADAS

36,9m2

219

234

i.s. F

28,8m2


7,4m2

261

262

SALA DE AULA

122,4m2

50 lug

263

SALA DE EXAMES

347,9m2

138 lug

241

SALA DE AULA

162,8m2

68 lug


235

19,0m2

233

i.s. M

28,8m2





das infraestruturas.

Pc

Pc

Pc

Pc

Pc

Pc

Pc

C33.2

237

233a

219

C50.4

GABINETE

20,7m2

261

262

239

18,7m2

ARRUMO

237

novo

235

5,2m2


233a

E.2.1

ESCADAS

14,8m2

C.2.0

C.2.0


461,5m2

232

232

i.s. Def

6,1m2

217

218


202,0m2

C.2.0

parede a demolir

110 lug

AC

218

C17.11

C17.12

C17.13

C16.12

C16.13

C17.14

C17.15

C16.14

C16.15

C17.16

C17.17

C16.9

C17.8

C17.9

C17.10

C12.4

C2.8

216

243

GABINETE

18,1m2

C25.1

C16.10





C16.11

das infraestruturas.

alterar

porta passa a

abrir para fora

C.2.1

cofre

231b

i.s. F

13,2m2

231a 229

i.s. M

ARRUMO

14,7m2

5,2m2

228


84,1m2

215


115,4m2

47 lug

230

ARRUMO

5,2m2

231

228

215

242c

244 245 246 247

GABINETE GABINETE GABINETE GABINETE

18,1m2 18,1m2 18,1m2 18,1m2

C25.2 C25.3 C25.4 C25.5

C9.2 C11

C.2.0

C.2.0

C1.2

m.??






m.??

C51.2

C50.5

C42.2

C43.2

Pc

C.2.5


47,2m2

C.2.1

230

229

227

242

214

227

SALA CONS. EXECUTIVO

73,4m2

242

BIBLIOTECA

155,2m2

226

242a

BIBLIOTECA

103,7m2

C39.5 C39.4

m.??

231B


a demolir

C.2.3 4,8m2


231A


a demolir




E.2.2

ESCADAS

14,3m2

m.??


a demolir


pretende-se retomar o projecto original,


e aplicando os mesmos materiais de


das infraestruturas.

AC AC AC

C.2.1

C3

249

BIBLIOTECA

22,0m2

247

E.2.8

ESCADAS

9,0m2

222

pcf

250

248

E.2.4

ESCADAS

13,0m2

C.2.4

novo

pcf

242B

novo

pcf

242A

novo

C6.5

C.2.4


42,2m2

m.??

223

GABINETE

20,0m2

15,1m2

GABINETE

224

225

GABINETE

14,2m2

226


23,8m2

242b

BIBLIOTECA

56,1m2





das infraestruturas.

m.??

m.??

m.??

E.2.3

ESCADAS

9,6m2

213


115,6m2

47 lug

C49.4

C49.3

m.??


m.??

m.??

252a

C13.10

213

C12.5

252

C6.6

C13.11

C6.7

251

252

C23

SALA DOUTORAMENTOS

49,0m2

C.2.1

C.2.1

C.2.1

C4

AC







tela de cobre.


C13.13

C6.10

C13.12

C6.9

C15.4

E.2.7

ESCADAS

11,9m2


C50.6

C50.7


a gabinete

C50.8

C50.9

C50.10

253a

10,5m2

253

CENTRO DE

RECURSOS

m.B3.1

253

C.2.1

254 255

i.s.F

i.s.M

17,0m2 17,0m2

254 255

C6.11 C13.14

C6.12

C6.8

PT4

253a

m.??

demolir


E.3.2

ESCADAS

18,0m2


pretende-se retomar o projecto original,


e

aplicando os mesmos materiais de



das

infraestruturas.


C45.2

m.??

303

GABINETE

15,2m2

302

GABINETE

15,0m2

Pc

Pc

Pc

C.2.1


1432,9m2

C14.2

304

GABINETE

42,8m2

C39.6

Pc

Pc

221

ARRUMO TUNAS

37,0m2

301

GABINETE

29,6m2

C.3.0


27,6m2

221

AC


304

301

demolir

caixilho

E.3.2

m.??

C.2.2


682,8m2

novo

300

C.3.1


91,6m2

2 1

211


173,5m2

95 lug

demolir


310

SERVIDOR

15,3m2





das infraestruturas.

222

REPROGRAFIA / LIVRARIA

97,9m2

m.??

C31.3 C31.2 C31.1 C30 C29

212

m.??

222

256 257

SALA DE AULA

SALA DE AULA

73,6m2 72,1m2

40 lug 40 lug

m.??

demolir pavimento falso e pavimento c/ amianto

Reprografia/Livraria



AC AC AC

305

SALA DE AULA

68,8m2

40 lug

305

pcf

309

pcf

310

novo

309

ARQUIVO

78,7m2

211

306

E.3.3

ESCADAS

9,6m2

pcf

309a

novo

256 257

210

212

306

SALA DE AULA

60,5m2

30 lug

novo



m.??

307

308

14,0m2

GABINETE

307

308

GABINETE

12,8m2

C13.15

220

209

220

C7.3

C13.16

C13.17


original - salas de


C53.2

parede a

demolir

E.3.3

C14.3

REPROGRAFIA

36,8m2

C50.12

C50.11

208


19,2m2

C15.5

C12.6

208

C6.13



intrusiva

m.??

m.??

C8

C2.5

m.??

272


demolir

C.2.2

201

258

SALA DE AULA

72,0m2

32 lug

C.2.1

264


36,0m2

265


35,4m2

E.2.6

ESCADAS

13,9m2

AC




m.??

264

265

C.2.2

258

259

GABINETE

20,6m2

259

207

206

205

260

260

SALA DE AULA

107,0m2

53 lug


C2.7


intrusiva

C2.6

266

GABINETE

20,9m2

267

GABINETE

21,1m2

268

GABINETE

21,1m2

269

GABINETE

21,1m2

270

GABINETE

21,0m2

204

GABINETE

203

GABINETE

C24.7

C24.6

C24.5

C24.4

C24.3

C24.2


201


C.2.2

271


73,9m2

C.2.2


demolir

Pc

E.2.5

ESCADAS

36,7m2

Pc

Pc

i.s. F

24,0m2

i.s. M

23,6m2


Pc Pc Pc

parede a

demolir


19,0m2

19,0m2

demolir

degraus e cadeiras

Pc









C24.1




pretende-se retomar o projecto original,


e aplicando os mesmos materiais de


C44.2

das infraestruturas.




estrutura de anfiteatro



sala plana.






requerente






infraestruturas nomeadamente


PISO 2

201

202

203 GABINETE

204 GABINETE

205 INST. SANIT. MASCULINA

206 INST. SANIT. FEMININA

208

211

212

213

215

218

220 REPROGRAFIA

221 ARRUMO TUNAS

222 LIVRARIA / REPROGRAFIA

223 GABINETE

224 GABINETE

225 GABINETE

226

227 SALA CONS. EXECUTIVO

228

229 ARRUMO

230 ARRUMO

231a INST. SANIT. MASCULINA

231b INST. SANIT. FEMININA

232 INST. SANIT. DEFICIENTES

233 INST. SANIT. MASCULINA

233a

234 INST. SANIT. FEMININA

235

236 GABINETE

237 ARRUMO

238 GABINETE


241 SALA DE AULA


242 BIBLIOTECA


242a BIBLIOTECA

242b BIBLIOTECA

242c BIBLIOTECA

243 GABINETE

244 GABINETE

245 GABINETE

246 GABINETE

247 GABINETE

252 SALA DOUTORAMENTOS

253 CENTRO DE RECURSOS

254 INST. SANIT. FEMININA

255 INST. SANIT. MASCULINA

256 SALA DE AULA

257 SALA DE AULA

258 SALA DE AULA

259 GABINETE

260 SALA DE AULA

261 GABINETE

262 SALA DE AULA


263 SALA DE AULA


264

265

266 GABINETE

267 GABINETE

268 GABINETE

269 GABINETE

270 GABINETE

311 ARQUIVO



projecto de arquitectura

E.3.6

ESCADAS

13,9m2

202


202

CABINE


6,8m2


201


Faculdade de Arquitectura da Universidade do Porto / CEFA-UP


projecto



fase


escala

PLANTAS PISO 2 e PISO INTERMEDIO

1/200





76 lug




311


311

ARQUIVO

217,2m2


V1.7

V1.6

V1.5

V1.4

V1.3

V1.2

V1.1









4050 503 Porto

+351 22 609 70 54

josesoaresarq@gmail.com


01.05

data

29/01/2016



































Location

East façade, detail South patio Foyer

Auditorium


1/1000 East Elevation

241 263

C34.18

C34.17

246 245

244

243

C34.16

C34.15

C34.14

C34.13

C34.12

C34.11

C34.10

C34.27

302 303

C34.26

C34.25

calha de parede

C34.24

C34.23

C34.22

pcf

312

C34.21

C36.1

C36.2

C36.3

C34.20

C36.4

C36.5

calha de parede

C34.19

2nd F

206 205

266 267 268 269 270

LEGENDA


233 234

204 203

Pc Pc Pc

223 224 225

C35.10

C35. 1

C35.12

C35.13

C35.14

C35.15

C35.16

C35.17

C35.18


2nd F

1/1000

1st Floor


Projects


Two Houses (T1 + T2)

Designation:

Two houses with a common entrance, in Rua Azevedo de Albuquerque/

Virtudes/ Hospital S. António

Design Date:

1973

Site Area:

44 m 2

Gross Floor Area:

129 m 2

Location:

Porto, Portugal

3 rd Degree of

Architecture Course of ESBAP (Escola Superior de Belas Artes do Porto)

Alçado Poente

1/200

West Elevation

1/2


1

1

1

1

1

1

1

1

Site Plan 1/1000

Elevation 1/500

1st Floor

2nd Floor 3rd Floor Roof

1/500

North Elevation

Section 1

1/500


Evangelic Church of Aldoar

Designation:

Evangelic Church of Aldoar

Design Date:

1979

Site Area:

300 m 2

Gross Floor Area:

125 m 2

Client:

The Evangelical Alliance Mission

Location:

Porto, Portugal

Axonometric


1

2

2

1

Ground Floor

2 2

1

1/200

1st Floor

2 2

1

1/200

1

Roof

2 2

1

1/200

Section 1

North Elevation 1/200 West Elevation

1/200 Section 2

1/500


Two crossed Houses - Two - Two twin twin sisters

Designation:

Two houses in one single plot in Gondomar

Design Date:

1980

Site Area:

116 m 2

Gross Floor Area:

318 m 2

Client:

José Luís Teixeira

Location:

Gondomar, Porto, Portugal

Plantas Floor Plans 1/200


1 1

Site Plan 1/500

North-East Elevation South-West Elevation South-East Elevation

1/200

Section 1 1/100


House in Évora

Designation:

Unifamiliar House in Graça do Divôr

Design Date:

1983

Site Area:

7 990 m 2

Gross Floor Area:

780 m 2

Client:

Dr.ª Teresa Oliveira

Location:

Graça do Divôr, Évora, Portugal

Entrance view


Floor Plan

West Elevation

1/1000

South aerial view

View of the exterior and living room building

View of the distribution hallway/corridor


Municipal Pool

Designation:

Pool in the Municipal Park of Castelo de Paiva

Design Date:

1985

Site Area:

32 210 m 2

Gross Floor Area:

505 m 2

Client:

Castelo de Paiva City Council

Location:

Castelo de Paiva, Portugal

Model


4

4

4

Site Plan

1/5000

3 3

1

2

Floor Plan 1/1000

Section 1

Section 2

Floor Plan

1/500

Section 3

1/2000


Hotel in Moledo Do Minho

Designation:

Hotel in the beach of Moledo do Minho

Design Date:

1987 - 1989

Site Area:

1 510 m 2

Gross Floor Area:

2 388 m 2

Client:

António Meleiro

Location:

Moledo do Minho, Portugal

Sketch


5

1

1

3

3

4

4

5

3

1

4

3

3

4

4

Site Plan

1/5000

3

4

1

1

5

5

2

2

2

2

Roof

1/1000 2nd Floor

1/1000

3

4

3

4

1

1

5

5

5

5

2

2

2

2

North-West Elevation

1st Floor

1/1000

Ground Floor

1

1/1000

Section 1

Section 2

West Elevation

1/500

Section 4

Section 3

1/500

Section 5

1/1000


Castell Fence of Vila de Óbidos

Designation:

Ideas Competition to valorize the Castell fence and walls in Vila de Óbidos

Design Date:

1991

Site Area:

2 660 m 2

Gross Floor Area:

118 m 2

Client:

Vila de Óbidos City Council

Location:

Vila de Óbidos, Portugal

Co-Authorship/Collaboration:

Luísa Brandão, Arq.

João Soares, Eng.

Perspective view


4

1 1

3 3

4

2

2

Site Plan

1/10000

Floor Plan

1/2000

Section 1

Section 2

Section 3

1/1000

Section 4


Paranhos Quarter

Designation:

Study for the requalification and consolidation of Economical Quarters in Porto

City Council

Design Date:

2000

Site Area:

55 300 m 2

Gross Floor Area:

9 900 m 2

Client:

Porto City Council

Location:

Paranhos, Porto, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Soares, Eng.

AXONOMETRIA DE CASAS TIPO B3 E B4 -

Axonometric view


OBRAS OBRAS

VIA

EDUARDO

DO

INTERNA

LARANJEIRA

ACTOR

VOUGA

DR. MANUEL

RUA DO SADO

RUA

MOVIMENTO

D. 8

AGUEDA

RUA

DO

B1. 11

D. 7

B2. 14

DE TERRA

B3. 24

RUA

B2. 13

C.34

B2. 12

E. 10

E. 9

C.33

B2. 11

C.32

CORGO

B1. 10

DO

RUA DO

B3. 19

E. 8

B4. 17

B1. 9

E. 7

COA

DO

B1. 8

B2. 10

B2. 9

CORGO

D. 6

B1. 6

D. 5

TUA

B2. 8

B1. 1

ESCOLA

E.6

C. 24 B1. 1

C. 23

E. 5

DO

TAMEGA

B3. 17

RUA

DO

B3. 16

B4. 12

C.C.

B1. 1

RUA

B1. 3

RUA

B3. 14

B4. 14

C. 18

B4. 11

C. 17

C.22

B3. 15

B4. 10

B2. 5

C.21

C. 16 B2. 4

DO

B3. 13

C. 15

B4. 9

C.14

RUA DO ZEZERE

B4. 8

B3. 12

C.13

B3. 11

DO

LIS

B3. 10

R

GUADIANA

B3. R 9

B4. 7

NEIVA

B3. 7

B3. 8

PRACA ,

DO

C.12

C.11

B3. 5

RUA

B4. 6

R

DO

B3. 4

R

B3. 5

B4. 5

C.10

RUA

CAVADO

C. 9

TEJO

DO VEZ

RUA DO BACA

,

RUA

CINTURA

DE

RUA DO DR. MANUEL

PEREIRA DA SILVA

RUA DO

DO

Bairro

Economico

de Paranhos

~

B3. 23

RUA

C. 31

DO

C. 30

DO

RUA

CEMITERIO DE PARANHOS

B3. 22

B4. 19

B4. 18

B3. 21

RUA

C. 29

DO

RUA

GUADIANA

B3. 20

B2. 15

C. 27

B3. 18

B4. 16

B2. 6

B1. 4

C. 20

C. 19

C. 6

C. 5

C. 4

C. 3

E. 4

B2. 3

B4. 4

C. 8

B1. 2

C. 2

C. 7

A. 7 A. 8

B3. 2

C.1

E. 3

D.4

A. 2

B4. 3

A. 1

B4. 2

A. 6

B3. 1

A. 4

B4. 1

A. 5

B2. 2

A. 3

D.3

B3. 3

D.2

D.1

B1. 1

B2. 1

E. 2

E. 1

C. 28

B1. 7

A. 12

B2. 7

A. 11

C.26

C.25

A. 10

A. 9

R

R

SUBESTACAO

DE PARANHOS

Casa original

Casa muito alterada

Ampliação num só piso

Ampliação em dois pisos

A demolir

Overall Intervention Plan 1/2000

A

Alçado frontal Planta Piso 0

A

A

Planta Piso 0 Ampliado

AXONOMETRIA DE CASA TIPO A COM

AMPLIAÇÃO NUM SÓ PISO

B1

B2

Lote curto de cunhal

Lote curto intermédio

B1

B2

Lote curto de cunhal

Lote curto intermédio

B1

B2

B3

B4

Alçado frontal Planta Piso 0

Planta Piso 0 Ampliado

alternativa p/

T3

alternativa p/

cozinha

AXONOMETRIA DE CASAS TIPO B1 E B2 -

LOTE CURTO COM AMPLIAÇÃO NUM SÓ PISO

Lote longo de cunhal

B3

Lote comp. de cunhal

Lote longo intermédio

B4

Lote longo intermédio

Lote longo intermédio

solução p/ lote longo

de cunhal

Alçado frontal Planta Piso 0

Planta Piso 0 Ampliado

Planta Piso 1 Planta Piso 1

AXONOMETRIA DE CASAS TIPO B3 E B4 -

LOTE LONGO COM AMPLIAÇÃO EM DOIS PISOS

C

Alçado frontal

Planta Piso 0

C

Planta Piso 0 Ampliado

Planta Piso 1

AXONOMETRIA DE CASA TIPO C

COM AMPLIAÇÃO EM DOIS PISOS

Expansion proposals for some standard plots 1/500


Casa da Música in Batalha, Porto

Designation:

Competition to elaborate the design of the new facilities of Casa da Música in

Porto

Design Date:

2001

Site Area:

2 910 m 2

Gross Floor Area:

6 650 m 2

Client:

Porto City Council

Location:

Praça da Batalha, Porto, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Soares, Eng.

Aerial view of Proposal, from South-West


SERV.

Model, roof view Model, interior, view of 1st Floor Foyer Model, interior, Ground Floor Foyer

CAFÉ/

SELF-SERVICE

SERVIÇOS

ACESSO PISO

ADMINIST.

SERV. CAFÉ/

SELF-SERVICE

COLUNA SERVIÇO

TEATRO

NAC. S. JOÃO

CAMARINS

50 HOMENS

TEATRO

NAC. S. JOÃO

T.N.S.JOÃO

SANIT.

EQUIP.

PALCO

INSTRU-

MENTOS

PAINEIS

ELEVATÓRIOS

DO PALCO

FOYER

DOS

MÚSICOS

CAMARINS

CAMARINS

35 MULH.

ARQUIVO

SALAS

ENSAIOS

"ORCHESTRA MANAGER"

SERV. ADMIN.

OFICINA

SALA

ENSAIOS

CIRCUL. PLATAF.

VERTICAL ELEVAT.

ORQUESTRA

CAIS COBERTO

PALCO

ORQ. SINFÓNICA

AUDITÓRIO 750 LUG.

SERVIÇOS

ENTRADA/

BILHETEIRAS

SERV./

SAÍDAS EMERG.

"HALL" / RAMPA

ENTRADA/

PÚBLICO

ENTRADA/CAIS

-1 Floor

"HALL"

SERV.

ADMINISTRATIVOS

PEQUENO

AUDITÓRIO

300 LUG.

Ground Floor 1/1000 1st Floor

1/2000

Elevation 1/500


Facultys of Medicine and

Nutrition Sciences of the University of Porto

Designation:

Public Competition for the elaboration of the designs for the new facilities of the

Basic Sciences Services of the Medicine Faculty and the Nutrition and Food

Sciences of the University of Porto

Design Date:

2001

Site Area:

15 980 m 2

Gross Floor Area:

21 800 m 2

Client:

Universidade do Porto

Location:

Campus S. João, Porto, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Pedro Carneiro, Arq.

João Soares, Eng.

Sketch


N

CONCURSO PÚBLICO PAR A ELABORAÇÃO DOS PROJECTOS DAS NOVAS INSTALAÇÕES

DO SERVIÇOS DAS CIÊNCIAS BÁSICAS DA FACULDADE DE MEDICINA E DA FACULDADE

DE CIÊNCIAS DA NUTRIÇÃO E ALIMENTAÇÃO DA UNIVERSIDADE DO PORTO

PLANTA PISO -2 - COTAS 109.87 e 108.53 - ESCALA 1:2 0

N

CONCURSO PÚBLICO PAR A ELABORAÇÃO DOS PROJECTOS DAS NOVAS INSTALAÇÕES

DO SERVIÇOS DAS CIÊNCIAS BÁSICAS DA FACULDADE DE MEDICINA E DA FACULDADE

DE CIÊNCIAS DA NUTRIÇÃO E ALIMENTAÇÃO DA UNIVERSIDADE DO PORTO

PLANTA PISO -1 - COTAS 112.53 e 1.20 - ESCALA 1:2 0 4

Floor Plan, sketch

East Elevation

1/2000

South Elevation

1/2000

Axonometric

3

-2 Floor -1 Floor Ground Floor

1st Floor 2nd Floor 3rd Floor

Site Plan

1/5000

4th Floor

1/5000


UNICER

Designation:

Architecture project for the renovation of the Auditory and Administrative Area of

the UNICER Facilities in Leça do Balio

Design Date:

2001

Site Area:

1 845 m 2

Gross Floor Area:

1 070 m 2

Client:

UNICER SA

Location:

Leça do Balio, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Pedro Carneiro, Arq.

João Soares, Eng.

Aerial view of proposal


Ground Floor Plan

1st Floor Plan

Model, North view

Model, South view


Av. da Ponte

Designation:

Urban proposal to redesign Av. da Ponte, an avenue leading to the D. Luís I

Bridge, in Porto

Design Date:

2002

Site Area:

15 830 m 2

Gross Floor Area:

8 735 m 2

Client:

Porto City Council

Location:

Av. da Ponte, Porto, Portugal

Co-Authorship/Collaboration:

João Soares, Eng.

Aerial view of Proposal, from North


79.56

RUA

Travessa

79.67

Travessa de

S. Sebastião

ESCURA

North view, pedestrian access to the Plaza and to the tunnel by car

1

2

Section 1

DE

Section 2

64.13

RUA

PELAMES

Section 3

1/5000

R

DOS

3 3

RUA

do

Souto

R

R

Floor Plan, 1/2000

1

2


Law Faculty in Lisboa

Designation:

Public Competiton for the design of the new Law Faculty of Universidade Nova,

University of Lisbon

Design Date:

2002

Site Area:

7 100 m 2

Gross Floor Area:

13 100 m 2

Client:

Universidade Nova de Lisboa

Location:

Lisboa, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Pedro Carneiro, Arq.

João Soares, Eng.

Sketch


2.008 m

Faculdade de Direito da Universidade Nova de Lisboa

2.369 m

Sketch, South view

Sketch, South-West view

South Elevation

1/2000

West Elevation 1/2000

-3 Floor -2 Floor -1 Floor 0 Floor

1st Floor 2nd Floor 3rd Floor 1/5000

Site Plan, 1/2000


ALMA Atacama, ESO

Designation:

International Invitational Competition for the elaboaration of the architecture

project to the facilities of the Observatory ALMA - Atacama Large Millimitre Array

Design Date:

2003

Site Area:

96 500 m 2

Gross Floor Area:

8 000 m 2

Client:

ESO - European Southern Observatory

Location:

Desert of S. Pedro de Atacama, Chile

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Pedro Carneiro, Arq.

João Soares, Eng.

Sketch


4

4

Visitors

Gallery

Sketch

Model views

Section 1

Section 2 Section 3 Section 4 1/2000

2935

2935

2930

2930

2 2

2930

2925

2920

2920

3

2915

2915

3

2910

1

2910

1

Site Plan 1/2000

Ground Floor 1st Floor

2nd Floor

1/10000


Vinhais City Council

Designation:

Public Competition to conceive the architecture project for the

Condes de Vinhais’ Manor-House rehabilitation and its conversion into the new

City Council

Design Date:

2005

Site Area:

5 055 m 2

Gross Floor Area:

8 205 m 2

Client:

Vinhais City Council

Location:

Vinhais, Bragança, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Pedro Carneiro, Arq.

João Soares, Eng.

Alçado South Elevation, Principal, vista street rua view

Sketch 1/500


1

1

2 2

Site Plan

1/1000

Ground Floor 1st Floor

Section 1

Section 2

2nd Floor

3rd Floor

Rear Elevation

4th Floor

5th Floor

1/2000

Elevation of new building, section by the plaza

1/1000


ALMA Santiago, ESO

Designation:

International Invitational Competion to design

the Central Offices of the Observatory

ALMA - Atacama Large Millimitre Array,

in the Facilities of ESO - European

Southern Observatory, in Santiago.

Design Date:

2007

Site Area:

8 475 m 2

Gross Floor Area:

2 850 m 2

Client:

ESO - European Southern Observatory

Location:

Santiago, Chile

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Pedro Carneiro, Arq.

João Soares, Eng.

West Elevation


Site Elevation

1/5000

Model, East view

Ground Floor Plan

1 5 10

1st Floor Plan

1 5 10

East Elevation

1 5 10


AMI Headquarters, Cascais

Designation:

Public Competition for the elaboration of the project for the future AMI

Headquarters Facilities in Cascais

Design Date:

2007

Site Area:

7 770 m 2

Gross Floor Area:

9 000 m 2

Client:

AMI

Location:

Cascais, Lisboa, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Pedro Carneiro, Arq.

João Soares, Eng.

South-East night view


1 1

2 2

Site Plan

1/2000

South-East view

Terrace 2nd Floor 1st Floor Ground Floor -1 Floor -2 Floor -3 Floor 1/2000

South Elevation

East Elevation

South-West view, Entrance

Section 1

Section 2

1/2000

Interior view


ISCAL

Designation:

International Public Competition to design the new facilities of

ISCAL - Instituto Superior de Contabilidade e Administração de Lisboa, a

Superior Institute for Accounting and Administration in Lisbon.

Design Date:

2007

Site Area:

38 500 m 2

Gross Floor Area:

20 300 m 2

Client:

Instituto Politécnico de Lisboa

Location:

Lisboa, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Pedro Carneiro, Arq.

João Soares, Eng.

Model, North view, entrance


1

3

4 4

2

3

2

1

Site Plan

1/5000

Sketch

-3 Floor

-2 Floor

-1 Floor

Ground Floor

1st Floor

1/2000

2nd Floor

3rd Floor

4th Floor

5th Floor

6th Floor

1/5000

Section 1

Section 3

Section 2

Section 4

1/2000


Industrial Complex in Ovar

Designation:

Architectural and Engineering Concept Proposal for the expansion of an

Industrial Complex in Ovar

Design Date:

2007

Site Area:

108 995 m 2

Gross Floor Area:

57 700 m 2

Client:

John Nield & Associados

Location:

Ovar, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Pedro Carneiro, Arq.

João Soares, Eng.

Model, North-East view


Site Plan

1/3000

North Elevation 1/3000

North Elevation, Detail 1/1000

Aerial view of the existent


Jumbo Maia

Designation:

Expansion of the facilities of Jumbo Hypermarket in Maia and requalification of

its surrounding road network

Design Date:

2007

Site Area:

102 150 m 2

Gross Floor Area:

65 728 m 2

Client:

Grupo Auchan

Location:

Maia, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Pedro Carneiro, Arq.

Tiago Mendes, Arq.

João Soares, Eng.

Aerial view of proposal


1

1

Site Plan 1/3000

Section 1 1/3000

Aerial view of the existing situation


Maia Kindergarten

Designation:

Day Care Center and Kindergarten in Maia

Design Date:

2009

Site Area:

955 m 2

Gross Floor Area:

1 095 m 2

Client:

Grupo Auchan

Location:

Maia, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Pedro Carneiro, Arq.

Tiago Mendes, Arq.

João Soares, Eng.

Model, South view


47

48

18

4

2

5

46

15

16

13

14

12

1

5

5

45

4

43

28

26

3

29

42

41

27

30

1

40

31

39

36

37

10

32

3

34

38

35

90

Model, North view

Site Plan

1/2000

Model, West view

2

17 19 2021 2 2324

25

1 1

2

Section 1

Section 2

West Elevation

Floor Plan 1/1000 South Elevation

1/1000


Matosinhos Kindergarten

Designation:

Day Care Center and Kindergarten

in Matosinhos

Design Date:

2008

Site Area:

3 550 m 2

Gross Floor Area:

1 150 m 2

Client:

Grupo Auchan - Fundação Pão de Açúcar

Location:

Matosinhos, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arq.

João Pedro Carneiro, Arq.

Tiago Mendes, Arq.

João Soares, Eng.

North Elevation

1/200


40.00

40.00

3

1

4 4

1

2 2

3

Site Plan 1/2000 Floor Plan

1/1000

Section 1

Section 2

Section 3

Section 4

1/500


Cedofeita Retirement Home

Designation:

Retirement Home for old people in S. Martinho de Cedofeita

Design Date:

2009

Site Area:

800 m 2

Gross Floor Area:

2 090 m 2

Client:

Paróquia de Cedofeita

Location:

Porto, Portugal

Co-Authorship/Collaboration:

João Pontes, Arq.

Nuno Felgar, Arq..

Rear Elevation


1 2 3 4a

6.4m2

6.4m2

6.4m2

6.4m2

Main Façade, Existent

Main Façade, Proposal

1 2 5 1 2 5

1 2 3 4a

4b

5

6

7

E

5

6

5

1

8

6

1

Floors 2 e 4

1 2 3 4a

6

4b

4a

3

E 3

7

poço - 1.5m

extra-curso - 3.8m

(eléctrico)

4a

1

4a

6

5

4b

3

4a

1

Floor 1

11

14 1 2 3 4

13

13

10 9b

E

poço - 1.5m

extra-curso - 3.8m

(eléctrico)

rampa

7.35 m

sobe 0.44m (6% incl.)

5

12

Section 1 1/500

1

8

9a

8a

6

A

7

1

6

13

B

Floor 0

11

10

10

1 2 3

9

Piso 4

Piso 3

Piso 2

12

8

E

poço - 1.5m

extra-curso - 3.8m

(eléctrico)

4

5

1

7

7

9

2

6

1

11

13

8

Piso 1

Floor -1

Piso 0

Piso -1

1

4

2

A

3

E

poço - 1.5m

extra-curso - 3.8m

(eléctrico)

B

5

1

1

Piso -2

Floor -2 1/1000

Axonometric Perspective


Bouça Retirement Home

Designation:

Architecture Project for the Residential Retirement Home of Eng. Pacheco de

Almada, no Porto

Design Date:

2009

Site Area:

7 085 m 2

Gross Floor Area:

1 390 m 2

Client:

Santa Casa da Misericórdia

Location:

Porto, Portugal

Co-Authorship/Collaboration:

João Pedro Carneiro, Arq.

João Pontes, Arq.

João Soares, Eng.

Model, South-East view

Model, East view


2

2

2

Rua do Gerez

1

Rua de Carlos Malheiro Dias

1

projecção Rua da Bouça

Rua da Bouça

Site Plan

1/2500

1 1

3 3

2

1st Floor

North Elevation

South Elevation

3 3

2

Western Elevation

Ground Floor

Section 1

-1 Floor

1 1

3 3

3A

2

1/1000

Section 2

Section 3

1/1000


Radisson Argel

Designation:

Radisson Hotel and Conference Center in Argel, Argélia

Design Date:

2012

Site Area:

8 250 m 2

Gross Floor Area:

69 660 m 2

Client:

Radisson

Location:

Argel, Argélia

Co-Authorship/Collaboration:

Julião Soares da Eira, Arq.

View from the access road


E19 - Bar / Restaurant / Terrace

E18 - Installations

E13-17 - Hotel Appartements

E6-12 - Hotel Chambres

E5 - Hotel / Restaurant / Pool

E4 - Spa / Gym

E3 - Conference Center

E2 - Evenements

E1 - Mirage Mall

E0 - Mirage Mall

E-1 - Mirage Mall

E-2 - Parking Mirage Mall

E-3 - Parking Hotel / Appartement

Elevation

View from the Plaza

Aerial view over the gardens

View of the entrance


Residence for a high government official of

Mozambique

Designation:

Invitational Competition for the design of the new residence and events

facilities, for a high government official of Mozambique,

in Maputo.

Design Date:

2013

Site Area:

7 400 m 2

Gross Floor Area:

1 622 m 2

Client:

Government of Mozambique

Location:

Maputo, Mozambique

Co-Authorship/Collaboration:

Julião Soares da Eira, Arq.

North-East view of residence


ventilação natural

+

+

+

wc

wc

wc

varanda

ginásio

wc

wc

Site Plan

Esc. 1/5000

ventilação

natural

ventilação

natural

serviços/

armazém

pátio

cozinha +

sala jantar

seguranças

pátio

pátio

quarto

assist.

protocolar

wc's

quarto quarto

membro membro

escolta escolta

pátio

quarto ADC

principal

pátio

arrumos

arrumos

arrumos

pátio

sala de estar +

sala de música

wc's

pátio pessoal

pátio wc's wc's pátio

pátio

pátio

pátio

sala de jantar

família

escritório

biblioteca

pátio

pátio

sala de estar

família

pátio

escritório 1

pátio

pátio

pátio

magazine

armas

pátio

serviço

entrada

oficial

sala de

jantar 22p.

cozinha

copa

wc's +

arrumos

entrada

família

escritório 2

terraço

terraço

quarto

terraço

quarto

terraço

quarto

terraço

quarto

terraço

terraço

quarto

terraço

piscina

espelho de

água

entrada

foyer

bengaleiro

salão

recepção/

aperitivo

salão 200p.

+ bar

wc's

wc's

cozinha

copa

-1 Floor Ground Floor 1st Floor

Esc. 1/100

Longitudinal Section

Esc. 1/1000

Axonometric, West view

View from the gym, over the garden and events building


Concurso Internacional para um Complexo

Familiar em Zeralda, Argel

Designation:

International Competiton to Study a Family Complex to Zeralda, with an

apart'hotel with 200 apartments, village-Hall, thalassotherapy center, aquapark

and leisure and services areas

Design Date:

2013-2014

Plot Area:

103 175 m 2

Site Area:

17 940 m 2

Gross Floor Area:

34 210 m 2

Client:

Ministère de la Défense Nationale

Location:

Alger, Algeria

Co-Authorship/Collaboration:

Pedro Martins, Arq.

Julião Soares da Eira, Arq.

João Soares, Eng.

Thalassotherapy

Center

Cafetaria

Aqua-Park

Restaurant

Apart'hotel

Open air

Theatre

Village Hall

Mediterranean sea

Lake

Pool

Ice-cream

store

Aerial view of the Complex from East


1 1

1/4000



Site Plan

Section 1



Village Hall

Village Hall cloister

Apart'hotel ambulatory

Aqua-park and pool, with apart'hotel on the right

View of the restaurant and ice-cream store with the the pool and apart-hotel in the background


Three housing buildings in Birkhadem, Argel

Designation:

Three housing buildings with 300 apartments composed by single and

double strory T2, T3 and T4 typologies, with central access gallery

Design Date:

2014

Plot Area:

10 152 m 2

Site Area:

4 040 m 2

Gross Floor Area:

71 666 m 2

Client:

Bessa Promotion

Location:

Birkhadem, Alger, Algeria

Co-Authorship/Collaboration:

Pedro Martins, Arq.

Julião Soares da Eira, Arq.

João Soares, Eng.

View of the private exterior space of the Condominium


espaces communs


Birkhadem, Argel

Location Plan

Model-Plan, Lower Floor

1/2500



Upper

Floor

T4 Model-Apartments

1/500

Lower

Floor

T2 Model-Apartments

1/200

T3 Model-Apartments, Upper Floor

Aerial view from West

View from the balcony of an apartment over the garden

Entrance and Condominium private garden


Two housing buildings in Draria, Argel

Designation:

Two housing buildings with 40 apartments composed by single and double

strory T2 and T3 typologies, with central access gallery

Design Date:

2014

Plot Area:

2 990 m 2

Site Area:

1 450 m 2

Gross Floor Area:

9 785 m 2

Client:

Bessa Promotion

Location:

Draria, Argel, Argélia

Co-Authorship/Collaboration:

Pedro Martins, Arq.

Julião Soares da Eira, Arq.

João Soares, Eng.

View of the entrance and the private exterior space of the Condominium


1

1

sortie du parking


espaces communs

espaces communs

Draria, Argel

VOIE

Location Plan Ground Floor Plan 1/1500

armoire

armoire

F3

F4

Upper

Floor

F4

F3

F4 - a

surface utile

93m2

surface habit.

73m2

terrasse

chambre 2

chambre 1

hall

sdb 2

sdb 3

dress

chambre 3

terrasse

F4

F4

F4

F4

F3

F4

F4

F3

F4

F4

F4 - b

surface utile

60m2

surface habit.

47m2

terrasse

chambre 3

sdb 4

dress

sdb 3

hall



chambre 2

F3

F3

F4

F4

F4

Lower

Floor

F3


F3


F4

F4

F4

F4

F4

sdb 2

F4

F4

couloir

chambre 1

F3

F3

F3

F3

F4 - a

surface utile

57m2

surface habit.

44m2

terrasse

cuisine

salon

sdb 1

hall

hall

sdb 1

salon

cuisine

terrasse

F4 - b

F4 - b

surface utile

surface 87m2 utile

surface 87m2habit.

surface 67m2 habit.

67m2

Model-Plans

Piso

Alto

1/1000

Model-Apartments T3

Baixo



1/200 Model-Apartments T2








Piso

1/500

View from the street

View from the balcony over the garden

West Elevation


j

31.78

31.76

31.72

0,150

0,584

2,345

0,1 0

pavimento em mármore

duche no tecto

prateleira ralo

embutida

0,806

Ar 4

1,036

0,746

31.91

1,5%

0,010

31.89 0,140

31.80

1,043

1,161

1,293

0,717

0,182 0,535 0,787

2, 50

31.93

divisória em vidro

lavatório

embutido

na pedra

Cota Existente

1,514 0,860

paredes revestidas a mármore

igual ao do chão

pavimento em mármore

1,5%

1,504

focos no tecto

0,1 0

0,4 0

0,217

0,760

Sanitário

sifão de pavimento

em aço inox

31.91

Ar 6

espelho a tod a largura,

a 10cm acima da bancada

2,0 0

Cota Existente

31.93

0,860

largura do vão existente

dimensão a confirmar em obra

Ve 3

0,4 0

0,620

31.93

0,4 0

0,7 0

0,600

0,7 0

Cota Existente

31.80

0,170

0,680

0,027

0,050

0,050

Medida a definir em função da profundidade do QE

0,560

radiador

Cota Existente

Sala Estar/Biblioteca

Portada de

co rer em

madeira

Ar 5

Cota Existente

31.84

31.86

31.91

Reentrância para tapete

31.88

31.93

radiador

31.86

0,312

0,340

31.88

2,397

3, 26

0,525 3,325

31.88

31.89

31.88

Pedra para

gárgula

31.88

0,5 0

0,5 0

g

g

31.88

31.89

31.88

0,358

2,302 0,825

3,795

3,325

0,397

31.91

0, 20

0,403

Ha l / Marquise

(31.93)

0,423

Ve 5

0,340

Ba 2

Reentrância

para tapete

0,5 0

0,310

31.91

31.93

Ba 3

0,360

0,5 0

1,616

2,450

0,395

2,6 0

0,328

0,370

Pedra para

gárgula 31.88

31.88

2,835

2,4 2

0,370

31.88

31.88

0,984

2,630

ventilação

do quarto

2,6 0

8, 16

31.93

Ar 2

0,603

Ar 3

1, 30

31.88

0,603

0,984

1,350

ventilação

do quarto

Ba 4

0,050

7,401

3,023

1,616

3,023

0,423

2,039

31.93

31.88

32.75

31.86

0,383

0,1 3

31.88

House in Ericeira

Designation:

Expansion and Rehabilitation of a weekend house in Ericeira, Portugal

Design Date:

2014

Site Area:

142 m 2

Gross Floor Area:

142 m 2 + 5 267m 2 (exterior spaces)

Client:

Henrique Montelobo

Location:

Ericeira, Portugal

Co-Authorship/Collaboration:

Julião Soares da Eira, Arch.

Pedro Martins, Arch.

João Pedro Carneiro, Arch.

João Soares, Eng.

d

dimensão a confirmar em obra

largura do vão existente

parapeito, ombreiras

e padieira em mármore

igual às paredes e chão

1,470

0,190 2,0 0

Ve 10

0,397

2,618

0,403

0, 20

Ve 9

radiador radiador

Quarto menor

Quarto maior

Pm 3

a a

Ha l quartos

(32.31)

a1 (32.31)

a1

0,825 1,465 0,825 1,465

Ve 7 Ve 8

2,6 0 1,4 0 2,6 0

0,758

largura do vão existente

dimensão a confirmar em obra

Ve 2

Ve 1

Cota Existente

radiador

inclinação no pavimento

inclinação no pavimento

Ar 1

h h

Pm 2

Ba 1

QE

Cota Existente

Cota Existente

Cota Existente

Cota Existente

(31.93)

Pm 1

Cota Existente

Ve 4

largura do vão existente

dimensão a confirmar em obra

0,358

b

1, 0

0,020

1,160

0,030

0,0 8

Pm 5

0,323

Peça em madeira para

transição de estereotomias

do pavimento com calha para

porta de correr

1,280

0,825 0,825

c1

(31.93)

Ve 6

2,1 0

0,423

0,1 0

b

2, 53

0,184

2,359

c1

2,359

d

0,423 2,210

Pm 4

1,205

c c

2,1 0

0,0 5 0,065

0,264

1,160

1,280

3,913

1,390

4,716

f f

1/200

Ground Floor


0,166

0,423

35

20

32.5

27. 5

gás

0,403 2,620

27. 5

30

27.50

25

armário

Caldeira

1,605 0,995

27.50

27.50

15

1,297

27.50

e

0,020

d

31.78

31.76

31.72

31.91

31.89

31.80

31.93

31.91

31.93

31.93

31.80

1,605 0,995

2,600

2,640

31.84

31.86

31.91

31. 8

(31.93)

31.93

31.86

31. 8

31. 8

31.89

31. 8

31. 8

QE

g

g

radiador

31. 8

31.89

31. 8

b

31.91

(31.93)

20

0,020

31.91

31.93

31. 8

c1

(31.93)

31. 8

31. 8

31. 8

b

31.93

(32.31)

c1

d

31. 8

terreno natural compactado

31.93

(32.31)

31. 8

32.75

31.86

31. 8

e

27.5

22.5

35

30

FOSSA

25

17.5

manta geotêxtil

manta drenante

manta geotêxtil

2 telas asfálticas - polyplas 30 + polyxis R 50C Garden

- juntas alternadas

regularização

terra vegetal

pintura "flintkote"

brita de drenagem

manta geotêxtil

0,064

0,142

0,040

0,362

dreno

15

BETÃO

ver

Projecto

de

Estabilida

de

0,423

terreno natural compactado

Notas:

Para a definição de arranjos exteriores este desenho não é válido, deve ser consultado o Projecto de Arranjos Exteriores

PE-00 08-08-2014

REVISÃO DATA DESCRIÇÃO

TIPO DE EMISSÃO

REQUERENTE

PROJECTISTAS

PROJECTO DE ARQUITECTURA

PROJECTO

ESPECIALIDADE

TÍTULO

FASE

Nº PROJECTO

coroamento de

nível

2,567

Primeira emissão

pernos de ligação em

aço galvanizado d=20mm

em todas as fiadas superiores

cordão de neopolene Ø=20mm

argamassa de assentamento

junta seca

0,1 0

radiador

Rua da Restauração 83, 2º

4050 503 Porto

Tel./ Fax (351) 22 609 70 54

e-mail: josesoaresarq@gmail.com

lajeado de granito

massame de betão e=20cm

manta geotêxtil

sub-base granulometria extensa (0/40)

manta geotêxtil

manta drenante

manta geotêxtil

2 telas asfálticas - polyplas 30 + polyxis R 50C Garden

- juntas alternadas

regularização

terra vegetal

pintura "flintkote"

brita de drenagem

manta geotêxtil

verguinhas deixadas na

execução do muro em

betão, em quincôncio de

2m em 2m coincidentes

com as juntas das pedras

degraus em granito

5,960

dreno

BETÃO

ver

Projecto

de

Estabilida

de

1,330

Nº DESENHO

coroamento de

nível

Coordenação:

Projecto Geral:

ESCALA

pernos de ligação em

aço galvanizado d=20mm

3,023

em todas as fiadas superiores

3,023

radiador

cordão de neopolene Ø=20mm

argamassa de assentamento

junta seca

verguinhas deixadas na

execução do muro em

betão, em quincôncio de

2m em 2m coincidentes

com as juntas das pedras

degraus em granito

lajeado de granito

massame de betão e=20cm

manta geotêxtil

sub-base granulometria extensa (0/40)

5,960

PROJECTOU

DESENHOU

José Manuel Soares

José Manuel Soares

Pedro Moura Martins

João Fernando Soares

Julião da Eira

ORDEM FASEPE

REVISÃO

2,039

APROVOU

3,077 5,498

5,500

TIPO DE EMISSÃO

REQUERENTE

PROJECTISTAS

0,190

Exaustor

2,000

2,000

Ardósia Preta

Amaciada

Microondas

+ Gri l

M L Frigo

Lixo

0,700 0,600 0,700

3,077 5,498

5,500

0,170

0,760

0,020

0,190

Exaustor

2,000

2,000

Ardósia Preta

Amaciada

Microondas

+ Gri l

M L Frigo

Lixo

0,700 0,600 0,700

TIPO DE EMISSÃO

REQUERENTE

PROJECTISTAS

PROJECTO DE ARQUITECTURA

PROJECTO

0,170

0,760

ESPECIALIDADE

TÍTULO

FASE

Nº PROJECTO

0,020

Location

h h

a a

a1 a1

c c

32.5

f f

i i

j j

27.5

South Façade

Caminho

22.5

Caminho

17.5

Corte E, esc. 1/50

PROJECTO DE EXECUÇÃO

HENRIQUE MONTELOBO

Connection Volume interior

JOSÉ SOARES

Arquitecto, lda

Main room

32.50

JOSÉ SOARES

Arquitecto, lda

31.85

0,650

ARQUITECTURA

PLANTA GERAL DE IMPLANTAÇÃO

PROJECTO DE EXECUÇÃO

RECONVERSÃO E AMPLIAÇÃO DE

HABITAÇÃO NA FOZ DO LIZANDRO

0,850

0,850

1/200

01

1,980

2,0 1/1000 Site Corte E, esc. 1/50 Plan

121

1/200

01 01 00

ESPECIALIDADE Nº

South Elevation

Corte G, esc. 1/50

0,075

0,382

0,637 1,392

0,1 0

2,487

2,457

0,360

0,030

2,097

0,030

0,100

0,810 0,570 0,977

2, 0

0,005

0,4 0 0,726

0,869

31.85

0,650

0,945

0,100

1,969

32.50

29.30

0,850

0,726

0,869 0,400

0,100

0,850

0,100

0,770 0,697 0,530 0,390

0,612 1,390 0,485

2,097

0,100

0,040

0,030

0,770

0,570 0,977

1,980

2,047

2,0 0

PE-00 08-08-2014

REVISÃO DATA

PROJECTO DE EX

Corte A, esc. 1/50

1/200

Corte F, esc. 1/20

0,850

Section A

Corte H, esc. 1/50

1/200

Corte G, esc. 1/50

Section H

0,850

Corte A1, esc. 1/50

0,385 0,385 0,385 0,385

0,020 0,020 0,020 0,020

0,359

0,020

0,379 1,601

0,1 0

1,590

0,006 0,020

0,005

1,590

0,100

0,616

1,601

0,020

0,020

0,259

0,100

2,0 2,487

2,280

1,980

2,850

Corte I, esc. 1/50 Corte F, esc. 1/20

Corte J, esc. 1/50

0,050

0,857

29.30

1,300

1,600

2,100

2,500

Corte H, esc. 1/50

0,1 0

0,770 0,697 0,530 0,390

0,612 1,390 0,485

2,097

0,1 0

0,040

0,030

0, 70

0,570 0,9 7

ARQUITECTURA

2,047

CORTES 2

PROJECTO DE EX

121

0,280

0,064

Alçado Este, esc. 1/200

2,292

0,196

2,032

0,424

1/500

0,869 0,4 0

0,731

2, 0

0,379

0,362

1,684

0,246

0,142

0,196

0,166

0,040 0,064

0,020

0,379 1,601

2,292 0,280

1,684

1,591

0,379

1,601

0,020

2,0 0

0,450

0,030

0,399 0,732

0,389

0,869 0,400

0,731

0,100

0,015

0,015

0,739

0,701

2,292

2,280

0,050

0,857

1,980

2,850

1,300

1,600

PE-01 05-09-2014 Segunda Emissão

PE-00 08-08-2014 Primeira emissão

REVISÃO DATA DESCRIÇÃO

PROJECTO DE EXECUÇÃO

2,100

2,500

East Elevation

PROJECTOU DESENHOU APROVOU

Corte B, esc. 1/50 Corte C, esc. 1/50 Corte C1, esc. 1/50

Corte I, esc. 1/50 Corte J, esc. 1/50

HENRIQUE MONTELOBO


7.2

Public Competition for the Library and Toys'

Museum of Torres Vedras






Designation:

Public Competiton for the conception and elaboration of the Municipal Library

and Toys´s Museum of Torres Vedras, Portugal

Design Date:

2017

Site Area:

1 934 m 2

Gross Floor Area:

7 427m 2

Client:

Torres Vedras City Hall

Location:

Torres Vedras, Portugal

Co-Authorship/Collaboration:

Pedro Martins, Arch.

Julião Soares da Eira, Arch.

João Soares, Eng.


LEGENDA







1.3 Loja


1.4 Cafetaria





1.7 Cacifos






2.2 Copa


25.70

25.80





7.4 Arrumos



2

1 1

1/500

25.80

25.80

25.70

1.5

146,6m2

2.3

34,1m2

2.2

23,4m2


1.2

18,3m2

1.7

1.6

26.00

12,5m2

25.30

2.1

22,7m2

26.00

26.00

1.1

236,1m2

1.7


1.4

105,7m2

1.8

82,8m2

1.3

44,5m2

26.00

26.35

57,7m2

8.2

23,5m2

26.40

26.50

7.3

40,2m2

26.00

7.4

15,4m2

7.1

190,7m2

26.80

4

Ground Floor - Museum, Auditorium, bar

3

2


4.3

476,1m2

4.4

30,0m2

4.5

57,9m2


4.1

3.1

11,0m2

38,0m2

4.2

15,0m2

4.2

15,0m2

4.2

15,0m2

4.2

15,0m2

31.00

5.2

15,0m2

5.2

15,0m2

31.00

31.00

3.1

3.2

50,6m2

5.1

10,0m2

5.3

188,1m2

4.6

38,1m2

5.8

19,8m2

5.4

29,7m2

5.7

14,7m2

5.5

54,5m2

5.6

54,5m2

29.85

















3





6.5

18,0m2

35.50

35.50

6.6

18,4m2

35.50

6.7

9,9m2

6.8

19,1m2

6.2

165,9m2

6.3

60,0m2

6.1

60,8m2

I.S.

6,0m2

6.4

86,9m2


I.S.

6,0m2

8.4

19,2m2

32.85

8.5

16,9m2

8.3

41,6m2

8.1

90,6m2

8.6

15,7m2

3

Location

1/1000

Section 1 - West Elevation

View from the Castle

CORTE 5 - Esc. 1/200

1/1000




Section 5








































1/500

Section 2




5

5






2

2

2

2








4

4


1/1000

4

1st Floor - Library


1/1000

2nd Floor - Services/Offices

4




Interior view, Library area opening South

Exterior view, Main Entrance


José Soares Arquitecto

Rua da Restauração, 83 2º

4050-053 Porto

Portugal

+351 226 097 054