20.04.2020 Views

VGB POWERTECH 11 (2019)

VGB PowerTech - International Journal for Generation and Storage of Electricity and Heat. Issue 11 (2019). Technical Journal of the VGB PowerTech Association. Energy is us! Power plant operation: legal & technology. Pumped hydro storage. Latent heat storages.

VGB PowerTech - International Journal for Generation and Storage of Electricity and Heat. Issue 11 (2019).
Technical Journal of the VGB PowerTech Association. Energy is us!
Power plant operation: legal & technology. Pumped hydro storage. Latent heat storages.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>VGB</strong> PowerTech <strong>11</strong> l <strong>2019</strong><br />

<br />

Plants in direct exchange of experience with <strong>VGB</strong> I August <strong>2019</strong><br />

Nuclear<br />

power plant<br />

Country<br />

Type<br />

Nominal<br />

capacity<br />

Gross Net<br />

MW MW<br />

Operating<br />

time<br />

generator<br />

in h<br />

Energy generated<br />

(gross generation) MWh<br />

Month Year 1 commis-<br />

Since<br />

sioning<br />

Time Unit capability<br />

availability % factor %*<br />

Energy unavailability<br />

%*<br />

Energy<br />

utilisation %*<br />

1 1 Postponable Not postponable Month Year 1<br />

Planned** Unplanned***<br />

Month Year Month Year<br />

Month Year 1<br />

Month Year 1 Month Year 1<br />

GKN-II Neckarwestheim DE PWR 1400 1310 207 223 200 7 082 010 336 908 844 100.00 100.00 21.19 89.84 78.81 10.06 0 0.10 0 0 21.19 86.86 1,2,4<br />

KBR Brokdorf DE PWR 1480 1410 744 994 792 6 432 247 357 000 057 100.00 83.52 94.05 78.35 5.95 15.92 0 0.02 0 5.72 89.88 74.24 -<br />

KKE Emsland DE PWR 1406 1335 744 1 026 542 6 728 057 353 547 026 100.00 83.78 100.00 83.66 0 9.09 0 0 0 7.25 98.<strong>11</strong> 82.06 -<br />

KKI-2 Isar DE PWR 1485 1410 744 1 031 644 7 820 515 361 546 328 100.00 93.91 98.93 93.51 0 6.12 1.07 0.14 0 0.24 92.84 89.95 -<br />

KKP-2 Philippsburg DE PWR 1468 1402 409,25 536 941 6 876 315 373 037 470 55.01 84.50 54.82 84.22 37.37 9.91 0 0 7.81 5.87 48.33 79.10 1,2,5<br />

KRB-C Gundremmingen DE BWR 1344 1288 744 978 185 6 460 061 337 401 816 100.00 83.70 99.40 83.00 0.60 15.84 0 0 0 1.16 97.38 81.99 -<br />

KWG Grohnde DE PWR 1430 1360 744 990 908 6 708 328 384 282 542 100.00 85.06 100.00 84.73 0 10.76 0 0 0 4.51 92.41 79.93 -<br />

OL1 Olkiluoto FI BWR 920 890 744 680 095 5 107 389 266 762 596 100.00 96.22 99.94 95.18 0.06 4.43 0 0.21 0 0.18 99.36 95.21 -<br />

OL2 Olkiluoto FI BWR 920 890 744 678 578 4 769 520 256 666 062 100.00 89.76 100.00 89.16 0 9.24 0 1.60 0 0 99.14 88.91 -<br />

KCB Borssele NL PWR 512 484 693 336 333 4 782 186 166 503 874 91.08 81.95 91.06 81.86 0 15.45 8.94 1.14 0 1.55 88.20 78.39 -<br />

KKB 1 Beznau CH PWR 380 365 733 272 559 1 855 842 129 189 952 100.00 84.60 100.00 84.38 0 15.62 0 0 0 0 96.27 83.62 7<br />

KKB 2 Beznau CH PWR 380 365 239 86 668 2 0<strong>11</strong> 679 136 362 086 32.12 91.34 31.92 91.31 68.08 8.69 0 0 0 0 30.14 90.70 1,2,7<br />

KKG Gösgen CH PWR 1060 1010 495 5<strong>11</strong> 876 5 138 912 319 014 440 66.47 84.14 66.04 83.49 0 8.97 0 0.92 33.96 6.62 64.91 83.14 7<br />

KKM Muehleberg CH BWR 390 373 744 280 420 2 222 570 129 626 885 100.00 100.00 99.93 99.75 0.07 0.25 0 0 0 0 96.64 97.73<br />

CNT-I Trillo ES PWR 1066 1003 744 785 304 5 390 978 252 682 646 100.00 87.79 99.87 87.33 0 <strong>11</strong>.76 0 0 0.13 0.91 98.16 86.16 -<br />

Dukovany B1 CZ PWR 500 473 379 176 941 2 662 535 <strong>11</strong>4 892 028 50.94 93.62 50.34 93.32 49.66 6.44 0 0 0 0.23 47.57 91.32 3<br />

Dukovany B2 CZ PWR 500 473 0 0 1 610 472 109 844 643 0 56.85 0.10 56.39 0.10 14.76 0 0 100.00 28.85 0 55.24 2<br />

Dukovany B3 CZ PWR 500 473 744 355 841 2 322 286 108 820 326 100.00 81.91 99.95 81.50 0 <strong>11</strong>.94 0 0 0.05 6.56 95.66 79.65 -<br />

Dukovany B4 CZ PWR 500 473 733 355 048 2 888 305 109 331 573 98.52 99.81 97.61 99.62 0 0.07 0 0 2.39 0.31 95.44 99.07 -<br />

Temelin B1 CZ PWR 1082 1032 744 793 753 4 720 428 <strong>11</strong>9 081 470 100.00 75.82 99.86 75.52 0.10 24.47 0 0 0.04 0.01 98.60 74.82 -<br />

Temelin B2 CZ PWR 1082 1032 5<strong>11</strong> 537 389 5 014 587 <strong>11</strong>4 287 104 68.68 79.32 66.85 79.03 33.15 20.77 0 0 0 0.20 66.76 79.48 1<br />

Doel 1 BE PWR 454 433 744 341 195 1 923 479 137 367 941 100.00 71.29 99.97 70.94 0.03 29.02 0 0 0 0.04 98.34 71.16 -<br />

Doel 2 BE PWR 454 433 744 330 999 2 246 141 136 048 080 100.00 85.95 99.28 84.37 0.05 15.42 0 0 0.67 0.22 97.52 84.46 -<br />

Doel 3 BE PWR 1056 1006 744 775 861 4 839 363 259 971 848 100.00 78.61 99.74 77.91 0 19.70 0 0.01 0.26 2.38 98.19 78.07 -<br />

Doel 4 BE PWR 1086 1038 744 696 829 6 124 559 266 497 969 100.00 100.00 87.42 96.62 0 0 0.01 0.39 12.57 2.99 84.39 95.36 -<br />

Tihange 1 BE PWR 1009 962 744 725 185 5 845 679 304 676 537 100.00 100.00 100.00 99.99 0 0.01 0 0 0 0 96.57 99.48 -<br />

Tihange 2 BE PWR 1055 1008 744 756 385 1 416 023 256 067 953 100.00 24.64 99.92 23.88 0 0.73 0.08 0.03 0 75.36 97.<strong>11</strong> 23.16 -<br />

Tihange 3 BE PWR 1089 1038 744 778 719 6 183 131 277 410 404 100.00 99.96 100.00 99.14 0 0.78 0 0 0 0.08 96.50 97.86 -<br />

Remarks<br />

1<br />

PWR: Pressurised water reactor<br />

Beginning of the year<br />

2<br />

BWR: Boiling water reactor<br />

Final data were not yet available in print<br />

* Net-based values (Czech and Swiss nuclear power plants gross-based)<br />

** Planned: the beginning and duration of unavailability have to be determined more than 4 weeks before commencement<br />

*** Unplanned: the beginning of unavailability cannot be postponed or only within 4 weeks.<br />

All values were entered in the column not postponable.<br />

– Postponable: the beginning of unavailability can be postponed more than 12 hours to 4 weeks.<br />

– Not postponable: the beginning of unavailability cannot be postponed or only within 12 hours.<br />

Remarks:<br />

1 Refuelling<br />

2 Inspection<br />

3 Repair<br />

4 Stretch-out-operation<br />

5 Stretch-in-operation<br />

6 Hereof traction supply:<br />

7 Hereof steam supply:<br />

KKB 1 Beznau<br />

Month: <br />

Since the beginning of the year:<br />

Since commissioning:<br />

KKB 2 Beznau<br />

Month:<br />

Since the beginning of the year:<br />

Since commissioning:<br />

391 MWh<br />

12,003 MWh<br />

541,926 MWh<br />

16 MWh<br />

2,150 MWh<br />

132,580 MWh<br />

KKG Gösgen<br />

Month:<br />

4,004 MWh<br />

Since the beginning of the year: 46,897 MWh<br />

Since commissioning: 2,353,956 MWh<br />

8 New nominal capacity since January <strong>2019</strong><br />