COMPLEX MEP PROJECTS



Project consists of a three-level, 10,680 SF fully

furnished facility. The animal hospital is a 24-

hour facility, requiring a 24-hour natural gas

emergency generator. The mechanical system m

consists of two rooftop air handling units split

systems, & energy recovery units with a hot water

system on a closed loop. A new rehabilitation

center was built in the basement which included

an underwater treadmill l for animals recovering

from surgery.

ALDIE VETRINARY CENTER



INOVA FAIRFAX MEDICAL CENTER

EMERGENCY DEPARTMENT RENOVATION

An extensive renovation of the entire 20,000 SF

emergency department as well as the 9,000 SF

pediatric wing. A mechanical basement as well as

a communications room & new helipad were also

part of the renovation project. This project

was awarded an Excellence in Construction

Award by the Association of Builders & Contractors.



In our over 50-year history, we have completed

more than 3,000 healthcare projects, many of

which include building or renovating MRI suites.

In order to install these large pieces of imaging

equipment, suites often need complete demolition

or coordinated shut-downs to allow for the

installation of new mechanical, electrical, &

plumbing upgrades to take place. These projects

often take place in occupied medical facilities

that must have minimal disruptions to normal

operations.

MRI SUITES



WINCHESTER MEDICAL CENTER

STERILE PROCESSING DEPARTMENT

In this project, the existing Sterile Processing Department

was upgrade with all new equipment.

The work included cutting and patching concrete

floors, complete upgrades of the plumbing. Electrical,

& HVAC systems, and infection control

barriers. This project was under construction 24

hours a day, 7 days a week with multiple temporary

provisions so the unit could continue full

operations with minimal disruptions.



INOVA ALEXANDRIA HOSPITAL

AIR HANDLING UNIT REPLACEMENT

Scott-Long Construction replaced two existing air

-handling units (AHUs). These units were located

in an interstitial area & served two patient care

locations. They were replaced with a new, more

efficient single rooftop AHU. To safely support

the heavy load of the new units, a structural steel

support platform was integrated into the existing

structure below. Hospital operations were not

impacted by this project.


HEADQUARTERS

14420 Albemarle Point Place, Suite 250

Chantilly, Virginia 20151

COLUMBIA, MARYLAND

9520 Berger Road, Suite 212

Columbia, Maryland 21046

WINCHESTER, VIRGINIA

1755 North Sector Court

Winchester, Virginia 22601

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!