UAE • QATAR • SAUDI ARABIA - National Group
UAE • QATAR • SAUDI ARABIA - National Group
UAE • QATAR • SAUDI ARABIA - National Group
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
In Association with<br />
A Member of<br />
TARIK MOHAMAD BINLADIN<br />
COMPANIES - KSA<br />
<strong>UAE</strong> <strong>•</strong> <strong>QATAR</strong> <strong>•</strong> <strong>SAUDI</strong> <strong>ARABIA</strong>
NATIONAL PILING<br />
Introduction 4<br />
<strong>National</strong> <strong>Group</strong> 5<br />
Organization Chart 6<br />
Activities 8<br />
Piling 9<br />
Shoring 11<br />
Anchoring 17<br />
Dewatering 18<br />
Pile Testing 19<br />
Equipment and Machinery 22<br />
Experience Record 23<br />
Licenses and Certificates 29<br />
Locations and Contacts 32<br />
3
4<br />
NATIONAL PILING<br />
Introduction<br />
NATIONAL PILING was established in U.A.E. since 2006 in association with <strong>National</strong> <strong>Group</strong>.<br />
NATIONAL PILING is one of the esteemed leaders in delivering unrivalled piling services for a<br />
number of companies involved in geotechnical and foundation engineering sectors. Let it be minor<br />
intricate, we can undertake all types of piling projects, since we have invested in specialized rigs<br />
and equipment, all of which have been purchased from leading international foundation equipment<br />
manufacturers.<br />
Its work team staffed by experienced professionals also deserves a special mention, who in turn, is<br />
abreast of the latest piling equipment as well as techniques now adopted in the industry. In fact, we<br />
have everything including expertise, strong infrastructure, and man power to undertake a variety of<br />
deep foundation project works, from residential and commercial works to the erection of the huge<br />
sky scrapers, while ensuring customers satisfaction to its fullest!<br />
Mission and Future Plans<br />
Culture and Mission Future Plans<br />
At <strong>National</strong> <strong>Group</strong>, our core mission is to<br />
make available a variety of piling services<br />
that are second to none. Our affiliates and<br />
association operate based on six values: Spirit,<br />
Determination, Pride, Commitment, Passion<br />
and Integrity, each of which inspires the way<br />
we serve our customers, who in turn contently<br />
count on as a catalyst to achieve their unique<br />
business goals.<br />
Majority of our present works are widely spread<br />
various parts of <strong>UAE</strong>, covering all the seven<br />
emirates. We have started our operations<br />
in KSA from December 2010 in association<br />
with Tarik Mohamad Binladin Companies. We<br />
are now in the process to grow our business<br />
to expand its activities to other prominent<br />
countries in the Middle East such as Qatar,<br />
Bahrain and Sultanate of Oman.<br />
<strong>National</strong> <strong>Group</strong><br />
The <strong>National</strong> <strong>Group</strong> is one of the prominent names in the industry for the completion of a spectrum<br />
of piling projects. With exceptional entrepreneurial skills and impressive team, all of the companies<br />
in the group provide unmatched piling solutions to help you with any project. Further, to maintain<br />
the highest standards of excellence in every project we undertake, the <strong>National</strong> <strong>Group</strong> has made<br />
significant investments in acquiring its own Plant, Equipment and Machinery. In fact, we have played<br />
and continue to play an indispensable role for the development of the U.A.E. thus helping to build<br />
a vibrant and modern nation.<br />
From its modest beginning, our group has grown to operate in a number of business sectors under<br />
the following domains such as:<br />
United Arab Emirates<br />
<strong>National</strong> Piling (Dubai)<br />
<strong>National</strong> Engineering Piling (Abu Dhabi)<br />
<strong>National</strong> Dewatering & Land Draining Co. LLC<br />
<strong>National</strong> Engineering Contracting<br />
<strong>National</strong> Engineering Electromechanical Establishment<br />
Design Resource Centre<br />
<strong>National</strong> Pump Industry<br />
Blue Sea Shipping Agency<br />
Al Najat Trading Establishment<br />
First <strong>National</strong> Heavy Equipments<br />
First <strong>National</strong> Agricultural Services<br />
First <strong>National</strong> Air Conditioning System Establishment<br />
Kingdom of Saudi Arabia<br />
<strong>National</strong> Piling Establishment [A Member of Tarik Mohamad Binladin Companies]<br />
5
NATIONAL PILING<br />
Organization Chart<br />
6<br />
United Arab Emirates<br />
Kingdom of Saudi Arabia<br />
7
8<br />
NATIONAL PILING<br />
ACTIVITIES<br />
Piling Works<br />
Bored Cast-In-Situ Piles<br />
Shoring Works<br />
Secant Pile<br />
Contiguous Pile<br />
Soldier Pile<br />
Anchoring Works<br />
Dewatering Works<br />
Pile Testing Works<br />
Pile Static Load Test<br />
Pile Dynamic Test<br />
Pile Sonic Test<br />
Pile Integrity Test<br />
Piling Works<br />
Bored Cast-In-Situ Piles<br />
Also called drilled piers or Cast-in-drilled-hole piles (CIDH piles). Rotary boring techniques offer<br />
larger diameter piles than any other piling method and permit pile construction through particularly<br />
dense or hard strata. Construction methods depend on the geology of the site. In particular, whether<br />
boring is to be undertaken in ‘dry’ ground conditions or through water-logged but stable strata – i.e.<br />
‘wet boring’.<br />
‘Dry’ boring methods employ the use of a temporary casing to seal the pile bore through water-<br />
bearing or unstable strata overlying suitable material. Upon reaching the design depth, a reinforcing<br />
cage is introduced; concrete is poured in the bore through tremie pipe and brought up to the required<br />
level. The casing can be withdrawn or left in situ.<br />
‘Wet’ boring also employs a temporary casing through unstable ground and is used when the pile<br />
bore cannot be sealed against water ingress. Boring is then undertaken using a digging bucket to<br />
drill through the underlying soils to design depth. The reinforcing cage is lowered into the bore and<br />
concrete is placed by tremmie pipe, following which, extraction of the temporary casing takes place.<br />
In some cases there may be a need to employ drilling fluids (such as bentonite suspension) in order<br />
to maintain a stable shaft. Rotary auger piles are available in diameters from 500mm to 2400mm or<br />
even larger and using these techniques, pile lengths of beyond 50 meters can be achieved.<br />
9
10<br />
NATIONAL PILING<br />
Bored Cast-In-Situ Piles<br />
Shoring Works<br />
A guide wall usually constructed to guide the drilling operation. Secant or contiguous pile wall in<br />
general may be constructed as temporary shoring structures or as permanent part. The excavation<br />
can be done by drilling machine. Drilling operation is usually carried out either with long casing or<br />
with short casing and fluid support.<br />
Secant Pile<br />
Contiguous Pile<br />
Soldier Pile<br />
11
12<br />
NATIONAL PILING<br />
Construction of Secant Pile Wall<br />
A secant pile wall consists of a series of primary and secondary piles casted alternatively. The<br />
secondary piles are installed by cutting a portion of the concrete from the adjacent primary piles on<br />
both sides forming a water tight wall.<br />
1. Construction of Guide Wall<br />
4. Concreting of Primary Borehole<br />
7. Concreting of Secondary Borehole<br />
2. Installation of Casing<br />
5. Augering of Secondary Borehole<br />
8. Repetition of Process<br />
3. Augering of Primary Borehole<br />
6. Installation of Steel Cage<br />
13
14<br />
NATIONAL PILING<br />
Contiguous Pile Wall<br />
This pictorial guide illustrates the construction sequence of a Contiguous Bored Pile (CBP) wall.<br />
1. Position of Bored Pile<br />
4. Installation of Steel Cage<br />
7. Repetition of Process<br />
2. Installation of Casing<br />
5. Concreting of Borehole<br />
3. Augering of Borehole<br />
6. Extraction of Casing<br />
15
16<br />
NATIONAL PILING<br />
Soldier/H Beam Shoring Wall<br />
A soldier pile wall using concrete panels as lagging.<br />
Soldier piles, also known as king piles or Berlin walls, are constructed of wide flange steel H sections<br />
spaced about 1 to 2 m apart and are driven prior to excavation. As the excavation proceeds, horizontal<br />
concrete panel (lagging) is inserted between the H pile flanges.<br />
The horizontal earth pressures are concentrated on the soldier piles because of their relative rigidity<br />
compared to the lagging. Soil movement and subsidence is minimized by maintaining the lagging<br />
in firm contact with the soil.<br />
Soldier piles are most suitable in conditions where well constructed walls will not result in subsidence<br />
such as over-consolidated clays, soils above the water table if they have some cohesion, and free<br />
draining soils which can be effectively dewatered, like sands.<br />
Unsuitable soils include soft clays and weak running soils that allow large movements such as loose<br />
sands. It is also not possible to extend the wall beyond the bottom of the excavation and dewatering<br />
is often required.<br />
Anchoring Works<br />
Tiebacks-Ground Anchors-Rock Anchors<br />
Tiebacks are small diameter drilled elements consisting of steel strands or thread bar members<br />
grouted into place and tensioned to provide a preloaded condition to the underlying soil. Tiebacks,<br />
also referred to as ground anchors, are used for permanent or temporary shoring support, retaining<br />
walls, dam stabilization, and landslide repair. They can provide a cost effective alternative to<br />
conventional shoring structures. The tieback anchor will reduce the deflection and bending moment<br />
of the shoring wall.<br />
Jack<br />
Anchor Head<br />
Tendon<br />
Grout<br />
17
18<br />
NATIONAL PILING<br />
Dewatering Works<br />
Deep Well Dewatering<br />
It is the removal of water from solid material<br />
or soil by wet classification, centrifugation,<br />
filtration, or similar solid-liquid separation<br />
processes. Removing or draining water from<br />
riverbed, construction site, caisson, or mine<br />
shaft, by pumping or evaporation. This is often<br />
done during the site development phase of a<br />
major construction project due to a high water<br />
table. Usually involves the use of ‘dewatering”<br />
pumps. Methods of dewatering include” well<br />
point, Deep well.<br />
Well Point Dewatering<br />
These systems are beneficial for dewatering to<br />
depths at which suction lift limitations prevent<br />
the use of well point pumps. Deep wells also<br />
offer the ability to control large volumes of water.<br />
Other features and advantages of deep wells<br />
and the deep well system include: Installation<br />
of wells far enough from the excavation so as to<br />
not be obstructive. Under proper soil conditions,<br />
deep wells allow for drainage of large areas.<br />
Pile Testing Works<br />
Pile Static Load Test<br />
Pile Dynamic Test<br />
Pile Sonic Test<br />
Pile Integrity Test<br />
Caliper Logging Test<br />
19
20<br />
NATIONAL PILING<br />
Pile Static Load Test<br />
Static load tests were performed during the<br />
test phase of contract to verify the design<br />
assumptions and load-carrying capacity of the<br />
piles. Telltale rods installed at various depths<br />
within the piles were used to evaluate the load<br />
transfer behavior of the piles with regard to the<br />
surrounding soil and bearing stratum.<br />
The bearing capacity is depend on the size,<br />
shape and type of pile and on the properties of<br />
the soil in which it is embedded. The ultimate<br />
bearing capacity is the load at which the<br />
resistance of the soil becomes full mobilized.<br />
At the load greater than bearing capacity, this<br />
causes the head of the pile to settlement 10%<br />
of pile diameter.<br />
General pile load test on Preliminary (Non-<br />
working) and Working piles are to be carried<br />
out as per requirements of the specification.<br />
The test load on Preliminary Pile and Working<br />
Piles are defined in the specifications.<br />
The test assembly consists of the following:<br />
Hydraulic Jack<br />
Pressure Gauge and Load cell<br />
Settlement Measuring Gauge<br />
Reference Datum<br />
Counter weight Kentledge, Ground Anchors or<br />
Reaction Piles<br />
Dynamic, Sonic, Integrity and Caliper Logging<br />
High Strain Dynamic Pile Testing (PDA Testing)<br />
PDA Testing utilizes the Pile Driving Analyzer<br />
(PDA) and is based on the theory of Stress<br />
Wave Propagation on Piles (CASE Method).<br />
Force and acceleration measurements taken<br />
near the top of a pile during impact provide the<br />
necessary information to determine:<br />
<strong>•</strong> Activated bearing capacity<br />
<strong>•</strong> Hammer Performance<br />
<strong>•</strong> Maximum driving stresses<br />
<strong>•</strong> Pile Integrity<br />
Cross hole Sonic Logging<br />
A sonic logger such as the Cross-Hole Analyzer is<br />
used to detect defects in cast-in-situ piles. Cross<br />
Hole Sonic Logging provides information on:<br />
<strong>•</strong> Honeycombing due to inadequate vibration<br />
<strong>•</strong> Segregation due to over vibration and<br />
improper concrete placement methods<br />
<strong>•</strong> Washout of cement due to ground water flow<br />
<strong>•</strong> Cracks in pile shaft due to shrinkage<br />
<strong>•</strong> Inclusion of foreign material causing<br />
contamination of concrete<br />
<strong>•</strong> Necking of pile due to collapse of side<br />
walls during withdrawal of temporary<br />
casings<br />
Low Strain Pile Integrity Testing<br />
The Pile Integrity Tester (PIT) is used to for<br />
bored piles, driven concrete shafts, concrete<br />
filled piles or drilled shafts. It detects potentially<br />
dangerous defects such as major cracks,<br />
necking, soil inclusions or voids.<br />
21
22<br />
NATIONAL PILING<br />
Machineries and Equipment<br />
Plant & Equipment<br />
S. No.<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
Plant/Equipment And<br />
Its Manufacturer/Make<br />
Piling Rig<br />
BG28 Bauer Germany<br />
Pi ling Rig<br />
SD 28 JINTAI China<br />
Piling Rig<br />
SD 22 JINTAI China<br />
Piling Rig<br />
BG 22 BAUER Germany<br />
Piling Rig<br />
SD 20 JINTA China<br />
Piling Rig<br />
BG 18H BAUER Germany<br />
Piling Rig<br />
BG 15H BAUER Germany<br />
Piling Rig<br />
SD 12 JINTAI China<br />
Piling Rig<br />
BG 7 BAUER Germany<br />
Piling Rig<br />
MAIT HR 18<br />
Total 19<br />
Micropoling & Anchoring Machines<br />
S. No.<br />
1<br />
2<br />
3<br />
Plant/Equipment And<br />
Its Manufaturer/Make<br />
KLEMM 803-2 (1994) Drilling Rig<br />
top Hydraulic<br />
KLEMM 803-2 (1990) Drilling Rig<br />
top Hydraulic percussion<br />
KLEMM 806-D (2007) Drilling Rig<br />
top Hydraulic percussion<br />
Quantity Capacity<br />
1 Dia. up to 2500 mm depth up to 60 m<br />
3 Dia. up to 2500 mm depth up to 60 m<br />
1 Dia. up to 2000 mm depth up to 40 m<br />
2 Dia. up to 2000 mm depth up to 40 m<br />
2 Dia. up to 2000 mm depth up to 40 m<br />
3 Dia. up to 1500 mm depth up to 35 m<br />
2 Dia. up to 1500 mm depth up to 30 m<br />
1 Dia. up to 1000 mm depth up to 27 m<br />
2 Dia. up to 900 mm depth up to 20 m<br />
2 Dia. up to 1200 mm depth up to 40 m<br />
Quantity<br />
4 ABI - Vibro Hammer 1<br />
5 Crawler Cranes (50T & 80T) 10<br />
6 Mixing & Grouting Plant Lot<br />
7 Bentonite Desanders Lot<br />
1<br />
1<br />
1<br />
Experience Record<br />
S.<br />
No.<br />
1<br />
Project Title & Location Client Name<br />
Water’s Edge Tower on Plot BB.B01.055 at Business<br />
Bay, Dubai<br />
M/s DAMAC Properties<br />
2 Deerfields Town Square at Al Bahya Old, Abu Dhabi M/s Deerfields Town Square<br />
3<br />
Business Central on Plot No. BB.03.021 at Business<br />
Bay, Dubai<br />
M/s DAMAC Properties<br />
4 DAMAC Marina Bay at Al Najmat, Abu Dhabi M/s DAMAC Properties<br />
5 Business Park at Business Bay, Dubai M/s Dubai Properties<br />
6<br />
R829/4 - Access Arrangement to Rashidiya Park &<br />
Ride Station, Dubai<br />
7 P-289 (1) Fujairah Cable Landing Station, Fujairah M/s DU<br />
8 2B+G+4 Office Building at Dubai Media City, Dubai M/s TECOM<br />
9<br />
Proposed Car Parking (G+ 4+ Roofs) & Training<br />
Building (G+3 Floors) at Port Rashid, Dubai<br />
M/s RTA, Dubai Piling<br />
M/s Dubai Customs Piling<br />
10 Dubai Metro Project M/s RTA – Dubai Metro<br />
11<br />
12<br />
13<br />
2B+G+6 Storey Office Building at Dubai Outsource<br />
Zone, Dubai<br />
2B+G+4P+26 Storey Res /Comm./Retail Bldg. “Silver<br />
Stallion Towers” at Jumeirah Village, Dubai<br />
The Crystal- 3B+G+3P+12 Floors Office Bldg. at<br />
Businees Bay, Dubai<br />
Project Components -<br />
Types of Work Items<br />
Site Setup, Shoring, Excavation,<br />
Piling & Dewatering<br />
Site Setup, Piling, Excavation<br />
& Dewatering<br />
Site Setup, Shoring &<br />
Excavation<br />
Site Setup, Shoring, Piling,<br />
Excavation & Dewatering<br />
Site Setup, Shoring &<br />
Excavation<br />
Site Setup, Piling, Shoring &<br />
Excavation<br />
Site Setup, Shoring, Piling,<br />
Excavation & Dewatering<br />
Installation & Extraction of<br />
H Beams – Shoring<br />
Juma Al Majid Site Setup, Shoring & Excavation<br />
M/s Stallion Developments<br />
Mr. Parman & Jethan<br />
Site Setup, Piling, Shoring,<br />
Excavation & Dewatering<br />
Site Setup, Excavation, Piling<br />
& Dewatering<br />
14 Earthworks on Plot 26-097 at Dubai Silicon Oasis M/s Dubai Silicon Oasis Backfilling Works<br />
15<br />
4B+G+M+16 Floors Building on Plot No. JVC 10B<br />
MRH010 at Jumeirah Village, Dubai, U.A.E<br />
Mr. Satnam Singh<br />
16 Rasis Business Centre at Business Bay, Dubai M/s Rasis Developers<br />
17<br />
3B+G+11 Residential Tower on Plot No. P1- A011 at<br />
Cultural Village, Jaddaf, Dubai.<br />
M/s Trinity Developers<br />
18 Sandoval Gardens at Jumeirah Village, Dubai M/s Bavaria Gulf<br />
19<br />
Madison Residence (Astor (MUE010), Atlantic (MUE014),<br />
Columbus (MUE009) & York (MUE013) at Majan, Dubai<br />
M/s DAMAC Properties Shoring<br />
Site Setup, Piling, Shoring &<br />
Dewatering<br />
Site Setup, Shoring,<br />
Excavation & Dewatering<br />
Site Setup, Shoring, Excavation,<br />
Piling & Dewatering<br />
Site Setup, Shoring,<br />
Excavation & Dewatering<br />
23
24<br />
NATIONAL PILING<br />
Experience Record<br />
S.<br />
No.<br />
Project Title & Location Client Name<br />
20 2B+G+4 Floors – 4 Buildings at Mizin – Arjan, Dubai M/s DAMAC Properties<br />
21 TUSCAN RESIDENCE – 3 Plots at Jumeirah Village M/s DAMAC Properties<br />
22 Amber Residence at Dubai Central M/s DAMAC Properties<br />
23<br />
Burjside Terrace on Plot 345-392 at Burj Khalifa<br />
District, Dubai<br />
M/s DAMAC Properties<br />
24 Harbor Heights at Plot RT-2-C16, Abu Dhabi M/s DAMAC Properties<br />
25<br />
Suburbia on Plot No. DJA-MED-18 Res-003 & 004 at<br />
Downtown Jebel Ali, Dubai<br />
Project Components -<br />
Types of Work Items<br />
Site Setup, Shoring &<br />
Excavation<br />
Site Setup, Shoring &<br />
Excavation<br />
Site Setup, Shoring &<br />
Excavation<br />
Site Setup, Shoring &<br />
Excavation<br />
Site Setup, Shoring,<br />
Excavation<br />
M/s DAMAC Properties Site Setup & Excavation<br />
26 TAMANI Arts Office at Business Bay M/s KM Properties Shoring<br />
27 B2B Office Tower at Business Bay M/s KM Properties Shoring & Piling<br />
28 Jumeriah Island Car Park, Dubai M/s RTA Shoring<br />
29<br />
30<br />
31<br />
32<br />
33<br />
34<br />
35<br />
36<br />
37<br />
38<br />
B+G+4 Midrises Service Plot No. JVC10SMRP200 at<br />
Jumeirah Village, Dubai<br />
017661-CC-1003-EMAL-Plant Wide Roads<br />
Construction of Light Pole Foundations, Abu Dhabi<br />
3B+G+4Podium+32 Residential Floors + 1 Mech on<br />
Plot No. 600-6983, City of Arabia, Dubai Land<br />
G+M+1 Ware House Shed+Office on Plot 242-151 at<br />
Al Ghusais, Dubai<br />
Theatre + Parking + Prayer Hall on Plot 226-353 at<br />
Al Twar 1st, Dubai<br />
Parking Building on Plot No. 226-353 at Al Twar 1st,<br />
Dubai<br />
3B+G+11 Residential Building at Cultural Village,<br />
Dubai<br />
2B+G+11+Roof on Plot R4-2 at Dubai Sports City,<br />
Dubai<br />
132/33 Kv Substation For Sharjah Electricity & Water<br />
Authority at Mussallah, Sharjah<br />
132/11 KV Substation on Plot No. 621-1351 at<br />
International City, Dubai<br />
39 2B+G+11+Gym on Plot 319-0320 at Oud Metha, Dubai<br />
M/s Kliendienst & Partner<br />
"EMAL (Client) Al Naboodah<br />
(Main Contractor)<br />
M/s Dubai Ring Property<br />
M/s Dubai Police Head<br />
Quarters<br />
M/s Dubai Police Head<br />
Quarters<br />
M/s Dubai Police Head<br />
Quarters<br />
M/s Rhodi Real Estate<br />
Site Setup, Shoring &<br />
Excavation<br />
Piling Works – Light Pole<br />
Foundations<br />
Shoring, Exvavation &<br />
Dewatering<br />
Shoring<br />
Shoring<br />
Piling<br />
M/s Dubai Sports City Shoring<br />
M/s Sharjah Electricity & Water<br />
Authority (SEWA)<br />
M/s Dubai Electricity & Water<br />
Authority (DEWA)<br />
Mr. Hamad Rashid Hamad<br />
Ghedyer Al Katbi<br />
Site Setup, Shoring &<br />
Excavation<br />
Piling<br />
Shoring<br />
Shoring<br />
40 G+M+4 Building on Plot 114-108 at Al Buteena, Dubai M/s Al Fattam Properties Micropiling<br />
41<br />
42<br />
G+Mezz. Shops+Sheds on Plot 257, Industrial Area,<br />
Ajman<br />
ENOC Service Station on Plot 266-275 at Al Twar,<br />
Dubai<br />
M/s Shabbir Golawala Vibrostone Column Works<br />
M/s ENOC Shoring<br />
S.<br />
No.<br />
Project Title & Location Client Name<br />
Project Components -<br />
Types of Work Items<br />
43 G+1 Villa on Plot No. 367-838 at Umm Al Sheif, Dubai M/s Engineers Office Vibrostone Column Works<br />
44<br />
45<br />
B+G+1 Residential Villa on Plot 362-011 Umm Suquim<br />
at Dubai<br />
Khansaheb Villa, G+1 on Plot No. 353-275 at Al Safa,<br />
Dubai<br />
Mr. Mohammed Salin Hamood<br />
Al Tooqi<br />
Mr. Hassan Mohd. Abdula<br />
Rahman Khansaheb<br />
Shoring<br />
Shoring<br />
46 Luxury Villa on Plot L8 & L9 at Emirates Hills, Dubai M/s Arabtec Shoring<br />
47<br />
48<br />
49<br />
Proposed Additions to Building on Plot UG-02 at<br />
Academic City, Dubai<br />
Villa Complex on Plot No. 9, Sector SE-26, Mohd. Bin<br />
Zayed City, Abu Dhabi<br />
B+G+4 Residential Building on Plot IC3-H15 at<br />
Nad Al Shibba, Dubai<br />
M/s International Infrastructure<br />
Services FZ-LLC.<br />
Shoring<br />
Mr. Aboobaker Khoory Shoring<br />
Ms. Reema Awdha Shoring<br />
50 B+G+1 Villa on Plot 394-803 at Emirates Hills M/s Arabtec Shoring<br />
51 Abu Dhabi Health & Fitness Club at Abu Dhabi M/s Abu Dhabi Health Club Shoring works<br />
52 B+G+1 Villa on Plot 324-635 at Jumeriah 2nd, Dubai Mrs Nama Saif Al Zaffin Shoring & Excavation<br />
53<br />
Al Rajaan Villas on Plot Nos. 394-501, 502 & 503 at<br />
Emirates Hills<br />
M/s EMAAR Shoring<br />
54 New Hilton Beach Club & Resort M/s Dubai Properties Shoring & Excavation<br />
55<br />
56<br />
57<br />
58<br />
59<br />
60<br />
B+G+4 Floors Building on Plot JVC10KMRP006 at<br />
Jumeriah Village, Dubai<br />
B+G+1 Villa on Plot No. 394-802 at Emirates Hills 3rd,<br />
Dubai<br />
B+G+14 Floors Residential Building at Al Barsha,<br />
Dubai<br />
B+G+M+2 Commercial Building on Plot No. 128-791 at<br />
Al Khabeesi, Dubai<br />
2B+G+9 Commercial & Office Building on Plot No. 26-<br />
061 at Dubai Silicon Oasis, Dubai<br />
B+G+3Typ+Gym Building on Plot No. 318-120 at<br />
Al Karama, Dubai<br />
61 B+G+2 Bldg on Plot 375-2297 at Al Barsha, Dubai<br />
M/s CONDOR Shoring & Excavation<br />
M/s EMAAR Shoring<br />
Mr. Syed Al Moosavi Shoring, Excavation & Piling<br />
M/s Hana Obaid Mohd. Al Helo Piling<br />
M/s Dubai Silicon Oasis<br />
Mrs. Abnaa Obaid Al Shaikh<br />
Juma Saif Al Mansoori<br />
M/s Dubai Police Head<br />
Quarters<br />
Shoring, Excavation &<br />
Dewatering<br />
Shoring<br />
Shoring & Excavation<br />
25
26<br />
NATIONAL PILING<br />
Experience Record<br />
S.<br />
No.<br />
62<br />
Project Title & Location Client Name<br />
B+G+1 Residential Villas on Plot E-77, W38 & E-72 at<br />
Emirates Hills, Dubai<br />
Mr. Muhamed Aman Merchant Shoring<br />
Project Components -<br />
Types of Work Items<br />
63 B+G+1 Villa on Plot 394-270 at Emirates Hills, Dubai Mr. Sandip Chadha Shoring & Excavation<br />
64 G+1 Villa on Plot No. 394-270 at Emirates Hills, Dubai M/s EMAAR Shoring & Excavation<br />
65<br />
B+G+3 Floors on Plot 2609/45 at Industrial Area 15,<br />
Sharjah<br />
66 2B+G+9+Gym Building at Dubai Land, Dubai M/s ASCON<br />
67<br />
G+1 Luxury Villa on Plot No. L-33 at Emirates Hills,<br />
Dubai<br />
M/s Team Engg. Projects Ltd. Shoring & Excavation<br />
M/s EMAAR Shoring<br />
Site Setup, Shoring,<br />
Excavation<br />
68 G+7 Floors Hotel Building at Al Raffa, Dubai Mr. Saud Othman Shoring , Excavation & Piling<br />
69<br />
B+G+3 Floors Building for on plot no. 133- 457 at<br />
Hor Al Anz East, Dubai<br />
M/s Al Buhaira Contracting Shoring & Piling Works<br />
70 Private Villa on Plot No. 77 at Emirates Hills, Dubai Mr. Ashok Awtani Shoring & Excavation<br />
71<br />
72<br />
73<br />
74<br />
B+G+6 Floors Building on Plot 373-412 at Al Barsha,<br />
Dubai<br />
B+G+16 Residential Building on Plot No. IICCMRH100<br />
at Jumeirah Village, Dubai<br />
B+G+15 Floor Residential Building On Plot No. 682-<br />
158 at Sports City<br />
B+G+2 Floors Residential Building on Plot No.<br />
150FRP-001 at Jumeriah Village, Dubai<br />
Mr. Abdul Shakoor, Salah,<br />
Fatima<br />
Shoring & Excavation<br />
M/s CONDOR Shoring & Excavation<br />
M/s Dubai Sports City Shoring<br />
M/s Developer Parkvale LLC Shoring & Excavation<br />
75 Planet Africa on Plot 362-273 at Jumeirah, Dubai M/s Planet Africa Shoring & Excavation<br />
76<br />
G+3 Labor Accomodation on Plot 358-605 at Al Quoz<br />
3rd, Dubai<br />
Mr. Jalan Murari Lal Shoring & Excavation<br />
77 Sewage Pumping Station At Jumeirah Village, Dubai M/s Nakheel Shoring<br />
78 2B+G+8 Floors Res. Bldg. at Dubai Land M/s Universal Developers Shoring & Excavation<br />
79<br />
80<br />
81<br />
B+G+12 Building on Plot No.241-540 at Al Nahda-2,<br />
Dubai<br />
2B+G+19 Residential & Commercial Tower on Plot<br />
12D200 at Jebel Ali, Dubai<br />
3B+G+1+Int. Level. Upper Work Shop at Jebel Ali,<br />
Dubai<br />
Mr. Obaid Salem Obaid AL<br />
Shamsi<br />
M/s Investment <strong>Group</strong><br />
M/s Gurunank Darbar<br />
Piling<br />
82 2B+G+18+Gym on Plot C003-023 at TECOM, Dubai M/s New Dubai Real Estate Shoring<br />
83<br />
84<br />
B+G+8 Residential Building on Plot No. 11-007 at<br />
Nad Al Shibba, Dubai<br />
B+G+6+R Commercial & Residential Building on Plot<br />
No. 421-257 at Al Warqaa 1st, Dubai<br />
M/s Dubai Silicon Oasis /<br />
Khansahen Investment<br />
Mr. Mohd. Mahmoud Mohd.<br />
Mashroom<br />
Shoring, Exvavation &<br />
Dewatering<br />
Site Setup, Shoring &<br />
Excavation<br />
Shoring<br />
Shoring<br />
S.<br />
No.<br />
85<br />
86<br />
Project Title & Location Client Name<br />
B+G+1 Villa on Plot No. R-66 (394-168) At Emirates<br />
Hills, Dubai<br />
2B+G+3P+18 Floors Residential Building on Plot No.<br />
BB.B03.012 at Business Bay, Dubai<br />
M/s EMAAR Shoring<br />
M/s Al Madar <strong>Group</strong><br />
Project Components -<br />
Types of Work Items<br />
Shoring, Excavation &<br />
Dewatering<br />
87 B+G+1 Villa on Plot No. 394-394 at Emirates Hills Mr. Shahram Nabili Shoring & Excavation<br />
88<br />
89<br />
90<br />
91<br />
2B+G+7 Residential & Commercial Building on Plot<br />
No. R10 at International City, Phase 3, Dubai<br />
Underground Water Tank & Holding Tank on Plot No.<br />
599-1289 at Jebel Ali, Dubai<br />
2B+G+5 Commercial Building on Plot No. 630-1231 at<br />
International City, Dubai<br />
B+G+8 +Gym Res. Building on Plot No.11-008, at<br />
Dubai Silicon Oasis<br />
M/s Aman Holdings Shoring & Excavation<br />
Mr. Qadhi Mohd. Saeed Al<br />
Murooshid<br />
Shoring<br />
Mr. Abdel Azeez Lenjawi Shoring & Excavation<br />
Mr. Ahmed Abdul Moety Adel<br />
Murad<br />
Shoring<br />
92 Park lane Tower at Business Bay KM Properties Shoring & Excavation<br />
93<br />
94<br />
95<br />
G+7 Floors Building on Plot No. 328 at Muwailah,<br />
Sharjah<br />
2B+G+M+8 TYP+HC Office Building at Al Garhoud,<br />
Dubai<br />
B+G+6 Residential Building on Plot No. 373-255 at<br />
Al Barsha I, Dubai<br />
96 B+G+M+1 on Plot No. 358-274 at Al Quoz 3rd, Dubai<br />
97<br />
98<br />
99<br />
100<br />
G+1 Girls School on Plot No. 217-2342 at Al Rashidiya,<br />
Dubai<br />
The Crystal- 3B+G+3P+12 Floors Office Bldg. at<br />
Businees Bay<br />
2B+G+18 Floors Office Building on Plot C-008-009 at<br />
TECOM, Dubai<br />
B+G+8+R Commercial & Residential Building on Plot<br />
No. 373-1275 at Al Barsha, Dubai<br />
Mr. Bakheet Saeed Bin<br />
Miskeen<br />
Mr. Sheikh Sultan Soud Bin<br />
Khalid Al Qassem<br />
Piling<br />
Shoring<br />
Hiers of Ali Ibrahim Al Sayegh Shoring & Excavation<br />
Mr. Khalfan Ahmed Hareeb Bin<br />
Hareeb<br />
Shoring<br />
M/s Al Rashidiya School Piling, Shoring & Excavation<br />
M/s Parmanand Jethanand Shoring & Excavation<br />
Mr. Ahmed Ali Abdullah Piling, Shoring & Excavation<br />
Mr. Mohd. Noor Mohd.<br />
101 G+3+Roof on Plot No. 313-459 at Al Hamriya, Dubai M/s Juma Al Majid Piling<br />
102<br />
103<br />
2B+G+2 Floors Building on Plot No. 373-403 at<br />
Al Barsha, Dubai<br />
B+G+14 Floors Residential Building on Plot No.C005-<br />
027 at TECOM, Dubai<br />
Mr. Abdul Rahman Humaid Al<br />
Shamsi<br />
Shoring, Excavation &<br />
Dewatering<br />
Shoring<br />
M/s Islamic Bank of Sharjah Shoring<br />
27
28<br />
NATIONAL PILING<br />
Experience Record Licenses & Certificates For More Information Visit www.nationalgroupme.com<br />
S.<br />
No.<br />
104<br />
105<br />
106<br />
107<br />
Project Title & Location Client Name<br />
Parking+4Floors+Gym Residential Building on Plot No.<br />
124-666 at Al Muraqabat, Dubai<br />
G+5 Park+29+Health Club on Plot No. A-845 at<br />
Al Majaz 2nd, Dubai<br />
B+G+3 Floors Building on Plot No.129-687 at Port<br />
Saeed, Dubai<br />
B+G+14 Floors Building on Plot No. C-005-003 at<br />
TECOM, Dubai<br />
M/s Al Ghurair Centre<br />
Mr. Mohd. Saleem Al Bakht<br />
Mr. Abdul Noor Asadali Al Rais Shoring<br />
Mr. Badr Abdulla Ismail Al<br />
Muthawa<br />
Project Components -<br />
Types of Work Items<br />
Shoring, Excavation &<br />
Dewatering<br />
Shoring, Excavation &<br />
Dewatering<br />
Piling<br />
108 G+3 Building on Plot 358-602 at Al Quoz 3rd, Dubai Mr. Mohd. Husail Fakhruddin Piling<br />
109<br />
110<br />
111<br />
112<br />
113<br />
114<br />
Underground Water Tank on Plot M0028 at Jebel Ali,<br />
Dubai<br />
B+G+Typ Floors+Roof on Plot No. 373-210 at<br />
Al Barsha, Dubai<br />
B+G+1 Commercial & Office Building on Plot No.357-<br />
707 at Al Safa, Dubai<br />
G+2P+10 Floors Building on Plot No. 428, Mulk at<br />
Al Nahda, Sharjah<br />
Construction of Factory shed, Office Block, G+1 Staff<br />
Accomodation on Plot 60-72, Ajman Free Zone<br />
B+G+1 Residential Development on Plot No. 323-467<br />
at Al Jafliya, Dubai<br />
115 B+G+1 villa on Plot No. 363-926 at Al Manara, Dubai<br />
116<br />
3B+G+6 Floors Building on Plot no. 373-412 at<br />
Al Barsha, Dubai<br />
M/s Swift Freight International<br />
M/s Al Esithmar Reality LLC Shoring<br />
M/s Dubai Rail - Dubai<br />
Municipality<br />
Mr. Abdul Karim Ismail Al<br />
Fahim<br />
Shoring, Excavation &<br />
Dewatering<br />
Shoring, Excavation &<br />
Dewatering<br />
Piling<br />
M/s Crown Paper Mill Piling<br />
Mr. Saeed Mohd. Al Ghandi<br />
Mrs. Entisar Bint Ahmed Bin<br />
Hamed<br />
Shoring, Excavation &<br />
Dewatering<br />
Shoring<br />
Mr.Abdul Shakoor Shoring<br />
Commercial Licenses<br />
Dubai<br />
Sharjah<br />
Abu Dhabi<br />
Fujairah<br />
Kingdom Of Saudi Arabia Chamber Of Commerce - KSA<br />
29
30<br />
NATIONAL PILING<br />
ISO Certificates<br />
<strong>National</strong> Piling<br />
<strong>National</strong> Engineering Piling
<strong>National</strong> <strong>Group</strong> of Companies and Branches<br />
<strong>National</strong> Piling<br />
<strong>National</strong> Dewatering & Land Draining Co. LLC<br />
<strong>National</strong> Engineering Contracting<br />
<strong>National</strong> Engineering Electromechanical Establishment<br />
Design Resource Centre<br />
<strong>National</strong> Pump Industry<br />
Blue Sea Shipping Agency<br />
Al Najat Trading Establishment<br />
First <strong>National</strong> Heavy Equipments<br />
First <strong>National</strong> Agricultural Services<br />
First <strong>National</strong> Air Conditioning System Establishment<br />
<strong>National</strong> Engineering Piling<br />
<strong>National</strong> Dewatering & Land Draining Co. LLC<br />
<strong>National</strong> Piling Establishment<br />
A Member of Tarik Mohamad Binladin Companies<br />
Opening shortly in Qatar, Bahrain and Sultanate of Oman<br />
DUBAI<br />
P.O. Box 20782<br />
Tel: +971 4 3333123, Fax: +971 4 3331876<br />
Email: npc@nationalgroup.org<br />
mail@nationalgroup.org<br />
Website: www.nationalgroup.org<br />
ABU DHABI<br />
P.O. Box 9052<br />
Tel: +971 2 4419337, Fax: +971 2 4419334<br />
Email: npc@nationalgroup.org<br />
KINGDOM OF <strong>SAUDI</strong> <strong>ARABIA</strong><br />
P.O. Box 6039 Jeddah, 21442 KSA<br />
Tel: +966 2 6655839, Fax: +966 2 6673213<br />
Email: npc@nationalgroup.org