greater than 0.02m and this increase will occur across open land to the south adjacent to

the track. With regard to the local-catchment (over-land) flooding there will be an impact as

a result of the development. This will be predominantly localised in the detention basin to

the south-west of the track where an increase of 0.17m is predicted. The detention basin on

site has been designed to capture this water and therefore there are no impacts outside of

the site. As noted above the assessment of local catchment water only, in the flood reports,

had not previously been captured and was part of the additional detail requested by Water

NSW.

Water NSW, as an integrated approval body, were referred the details of the modification

application. They advised Council that the existing flood work approval will require updating

to reference the new consent details and date. This will be secured by a new condition of

consent (2A). 161

7.2 Tender Process for the Construction of Riverina Paceway

HRNSW was responsible for the construction of the facility. On 30 November 2016 it

announced that it had appointed GHD Group as the project manager for the new

development. 162 On 7 April 2017 HRNSW announced that it had awarded the construction

of the paceway to Ladex. 163 Further investigations found that HRNSW had appointed

McKinnon Design in Orange to manage the procurement process by inviting expressions of

interest for the building and earthworks of paceway, the results of which would be used to

select a tender list for the project. 164

161

Ibid p 47.

162

Harness Racing New South Wales, ’New Look for the Riverina’ (Media Release, 30 November 2016)

<http://www.harness.org.au/media-room/news-article/?news_id=31676>.

163

Harness Racing NSW, ‘Wagga Development on Track’ (Media Release, 7 April 2017)

<https://www.hrnsw.com.au/news/1660/wagga-development-on-track>.

164

McKinnon Design, ‘Expressions of Interest – Building and Earthworks New Harness Racing Facility

Wagga Wagga NSW (closed on 6 June 2016)

<https://www.australiantenders.com.au/tenders/272411/expressions-of-interest-eoi-building-and-earthworksnew-harness-racing-facility-wagga-wagga-nsw>.

40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!