RESTORATIONS AND REPAIRS
BIRDSMOUTH FENCING: £1600 - £2000
To BIRDSMOUTH be constructed FENCING between the car park and the proposed Boules court.
To be constructed between the car park and the proposed boules court.
CEILING REPAIRS: £1000
Recently there has have been been an an unprecedented number number of of falls falls of of plaster plaster coming coming
from the ceiling in the church and church room.
The
The
church
church
is
is a
listed
listed
building
so the plaster work has to be repaired like for like.
building, so the plasterwork has to be repaired like for like.
OVERHAUL OF THE CHURCH ORGAN
St Barnabas organ has had a few overhauls, the most major one was
undertaken by a previous vicar and members of St Barnabas. The organ was
taken to pieces and completely restored, a rank of new pipes was added.
The time has come for another complete overhaul. Estimates received so far
have suggested a cost of £15,000.
We are seeking grants and donations which hopefully will go some way to
restoring the organ.
Further inspections have shown that several other areas of the ceiling are in a
critical state. Plaster expected to fall at any time. Photographs shown here
illustrate the problem.
It should be noted that the St Barnabas fellowship are responsible for all the
ongoing church building repairs. The work could cost over £1000.
TEER - SEE ATTACHED LEAFLET or email projectsandgifts@talktalk.net
If you wish to help with the
projects or need further details