RESTORATIONS AND REPAIRS

BIRDSMOUTH FENCING: £1600 - £2000

To BIRDSMOUTH be constructed FENCING between the car park and the proposed Boules court.

To be constructed between the car park and the proposed boules court.

CEILING REPAIRS: £1000

Recently there has have been been an an unprecedented number number of of falls falls of of plaster plaster coming coming

from the ceiling in the church and church room.

The

The

church

church

is

is a

listed

listed

building

so the plaster work has to be repaired like for like.

building, so the plasterwork has to be repaired like for like.

OVERHAUL OF THE CHURCH ORGAN

St Barnabas organ has had a few overhauls, the most major one was

undertaken by a previous vicar and members of St Barnabas. The organ was

taken to pieces and completely restored, a rank of new pipes was added.

The time has come for another complete overhaul. Estimates received so far

have suggested a cost of £15,000.

We are seeking grants and donations which hopefully will go some way to

restoring the organ.

Further inspections have shown that several other areas of the ceiling are in a

critical state. Plaster expected to fall at any time. Photographs shown here

illustrate the problem.

It should be noted that the St Barnabas fellowship are responsible for all the

ongoing church building repairs. The work could cost over £1000.

TEER - SEE ATTACHED LEAFLET or email projectsandgifts@talktalk.net

If you wish to help with the

projects or need further details

please contact us.

Projects and Gifts:

projectsandgifts@talktalk.net

33 MESSENGER APRIL MAY 2020

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!