North Canterbury News: June 30, 2022
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
NEWS<br />
20 The <strong>North</strong> <strong>Canterbury</strong> <strong>News</strong>, <strong>June</strong> <strong>30</strong>, <strong>2022</strong><br />
Cycleway and footpath wanted<br />
By SHELLEY TOPP<br />
More than 100 people havesigneda<br />
petition calling for asafe cycleway/foot<br />
path to be installed from the Rangiora<br />
Leigh HolidayPark corner to Loburn<br />
School.<br />
The petitionisincludedina<br />
submission the school has made to the<br />
WaimakaririDistrict Council calling<br />
for the council to add the cycleway to<br />
the list of others already prioritised<br />
under its Walking and CyclingNetwork<br />
Plan.<br />
Loburn Schoolprincipal Stuart<br />
Priddy saysthe busy sectionofroad<br />
from the holiday parkcorner to Loburn<br />
School is not safe for pupils to use.<br />
‘‘Ruralroadsrepresentasignificant<br />
hazard to our pupils trying to get to<br />
school,and parents tell me that they<br />
have been put off letting their kidsbike<br />
and walktoschool because of the<br />
dangers,’’ he says.<br />
‘‘We all enjoy the driving experience<br />
of rural roads,but for some the journey<br />
comes with extra risks. Our kids,along<br />
with all road users,deserve asafe trip.<br />
‘‘What we need are dedicated<br />
cycleway/paths to the school.’’<br />
‘‘This issue is areal impediment to<br />
promoting cycling skills in rural areas<br />
and there are such greathealth<br />
outcomes when kidscan get on abike<br />
safely,’’ he says.<br />
The council’s Walking and Cycling<br />
Strategy was developedinpartnership<br />
with the community and adopted in<br />
2017.<br />
It includes avision that Waimakariri<br />
residents choose to walkand cycle and<br />
that the environment is friendly, safe<br />
and accessible for walkers and cyclists.<br />
The council’s senior engineering<br />
adviserDon Young, saysacycleway to<br />
Loburn Schoolhas not made it on to the<br />
Dangerous journey ... Loburn School pupils face adangerous walk to and from their<br />
school and now more than 100 people have signed apetition calling for acycleway/footpath<br />
to be installed from the Rangiora Leigh Holiday Park corner to Loburn School to make their<br />
journey safer.<br />
PHOTO: STUART PRIDDY<br />
council’s priority list but that is only a<br />
staff decision and all submissions will<br />
be fully considered by the council.<br />
‘‘I am really interested in what<br />
Loburn School does put in its<br />
submission. ‘‘We are very interested in<br />
hearing fromthe community and<br />
looking forward to seeing their<br />
submissions and what they would like<br />
us to think about.’’<br />
Submissionsfor the plan close at 5pm<br />
today,Thursday<strong>June</strong> <strong>30</strong>.<br />
Upgrade<br />
continues<br />
Work is continuing on Kaiapoi’s<br />
‘‘shovelready’’ stormwater and<br />
floodingproject.<br />
Residents will have noticed workin<br />
and aroundOtaki Street, whichshould<br />
be completed by the end of August.<br />
Thereare teams working in<br />
Hodgson Avenue, Otaki Street,<br />
Chapman Place and Wesley Street,<br />
with all hands on deck to complete the<br />
worksassoon as possible.<br />
The work involves connectingan<br />
undergroundpumping station in Otaki<br />
Street with two branches of large<br />
gravity pipes stretching east over to<br />
Ashley Place and westtoWesley<br />
Street.<br />
AlongOtakiStreet, alarge pressure<br />
main is being installedtoget the water<br />
to the riverinlarge rainfall events.<br />
To minimise disruption, the council<br />
is taking the opportunity to replace the<br />
Chapman Place wastewaterrising<br />
main,and some watermains as well as<br />
kerb and channelonOtaki Street and<br />
Chapman Place.<br />
To completethis stage the Fuller /<br />
OtakiStreets intersection will be<br />
closed to traffic while one of the<br />
pipelines is installed.<br />
The intersection will be closed for<br />
around fourweeks and there willbe<br />
traffic management and detours in<br />
place. There will be achange to some<br />
bus stop locations in the area too, with<br />
temporarybus stops in place as the<br />
busesuse the detour routes.<br />
The major upgrade to the Kaiapoi<br />
Stormwater Systemwill increase the<br />
resilience of the stormwater network.<br />
Need Heat Fast?<br />
The Fastest, Warmest Indoor/Outdoor HeaterYou Will Ever Own!<br />
Buy One Get One Free! *<br />
+Plus<br />
Free<br />
Floor<br />
Stand!*<br />
worth<br />
$199.99<br />
• Heats Up Instantly<br />
y<br />
• Suitable efor Indoors orOutdoors<br />
-InRain, Fog, Wind or Snow<br />
• Carbon-Fibre Bulb BubTechnology<br />
ogy<br />
• Multi-Directional Stand<br />
• Includes Remote Control<br />
&Built-Int nTimer<br />
• Motion Detection Function<br />
1.8m High<br />
• Commercial Grade<br />
• Multi-Directional<br />
• Easy Install<br />
• Portable<br />
• Indoors &Outdoors<br />
*Call forTerms<br />
&Conditions<br />
CALL NOW! 0800 665 665