26.01.2023 Views

Feb 23 - Highway Dbn

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

In 2021, numerous upgrades added immeasurable value to<br />

our campus giving our boys the opportunity to use their<br />

potential to perform to the best of their ability in every sphere<br />

of school life, to ultimately fulfil their potential.<br />

This included upgraded cricket nets, an outdoor multi-sport<br />

court with stands for an extended Grade 10 break area.<br />

Huberta House had a complete overhaul as the Grade 8<br />

Boarding House and the Matric break area was revamped<br />

into an incredible space for our Grade 12s.<br />

2022 has already started on a positive note with the Grade 9<br />

classrooms being completely transformed. Bowden’s Sports<br />

Pavilion has undergone significant changes. The Grade 11<br />

break area has also had a facelift, and our Cricket Academy<br />

is due for completion by the end of August. A second<br />

boarding house is due for an upgrade, which will add<br />

to parking on the school grounds as well.<br />

These campus upgrades are vital to maintain Westville Boys’<br />

reputation as a high school that consistently has<br />

representatives at KZN and SA level in both academics and<br />

sport.<br />

30&31_Westville <strong>Feb</strong>-Westville Boys Boys DPS.indd All 2Pages<br />

20<strong>23</strong>/01/19 12:31:03 pm

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!