Provincial Waste Management Plan Styria - Abfallwirtschaft - Abfall ...
Provincial Waste Management Plan Styria - Abfallwirtschaft - Abfall ...
Provincial Waste Management Plan Styria - Abfallwirtschaft - Abfall ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Provincial</strong> <strong>Waste</strong> <strong>Management</strong> <strong>Plan</strong> <strong>Styria</strong> - 2005<br />
quantitative and qualitative analysis of construction materials used, of existing buildings, and of the<br />
quantity of demolition and construction waste is provided.<br />
From that, the annual waste volume of demolition and construction waste and excavated materials in<br />
<strong>Styria</strong> is extrapolated based on various data and literature references (Tab. 7 and 8).<br />
Demolition and construction waste in m t/year<br />
Method from to<br />
Federal <strong>Waste</strong> <strong>Management</strong> <strong>Plan</strong> 1998 0.94<br />
Other literature references 0.32 1.4<br />
Calculation based on construction activities 1.1 2.7<br />
Extrapolation based on demolition activities 2.0 3.3<br />
Collected volume (waste management) 0.3<br />
Estimated demolition and construction waste<br />
volumes<br />
2 - 3m t/year<br />
Tab. 7: Spectrum of demolition and construction waste volumes in <strong>Styria</strong>, without excavated<br />
materials<br />
Excavated materials m t/year<br />
Method from to<br />
Federal <strong>Waste</strong> <strong>Management</strong> <strong>Plan</strong> 1998 4.5<br />
Other literature references 1.7 3.6<br />
Calculation based on construction activities 3,7 7.2<br />
Extrapolation based on investigations 9.6<br />
Collected volume (waste management) 0.3<br />
Estimated volume to be landfilled per year minimum 4m t/year<br />
Tab. 8: Spectrum of excavated material volumes in <strong>Styria</strong><br />
Page 31