27.12.2012 Views

The Blair VIP Toilet - EcoSanRes

The Blair VIP Toilet - EcoSanRes

The Blair VIP Toilet - EcoSanRes

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ensure the walls are vertical and the pit base flat. <strong>The</strong> mortar mix is made<br />

with 5li of Portland cement and 100li of pit sand (20:1). It works!<br />

Lay the bricks against the edge of the pit wall. <strong>The</strong> mortar is quite thin but<br />

sufficient to bond the bricks together. <strong>The</strong> internal diameter is 1.4m. Continue<br />

with this diameter for 1.4m<br />

A simple ladder can be made to enter and leave the pit. After 1.4m each brick<br />

course is stepped in (corbelled) by about 20mm per course. This corbelling<br />

continues till the brickwork is about 2 courses above ground level.<br />

10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!