Views
5 years ago

ptJ- ftcE- 67~ ~O1OY-0 - part - usaid

ptJ- ftcE- 67~ ~O1OY-0 - part - usaid

Mmlstry of Water and

Mmlstry of Water and IrngatlOn Water Quahty Improvement and ConservatIOn Project Spring MOnItoring Plan VISIt, thIS spnng IS Judged to have normal or natural flow and IS proposed to be reactIvated as a monthly momtonng statIOn Its water IS bemg used for dnnkmg by the PotaSSIUm Co (Table 12) and Its water qualIty needs to be momtored accordmg to the speCIficatIOns of the Dnnkmg Water 1 category (Table 13) 3 4 HydrologiC Measurements, SamplIng, and QualIty Assurance Protocols ConSIstent hydrologIC measurements, samplmg, qualIty assurance, and data management protocols WIll be followed throughout the momtonng program to ensure that the data and aSSOCIated analyses proVIde an accurate representatIOn of the spnngs water resources throughout the basms These procedures are SImIlar to those for surface water momtormg and are presented m detaIl m the Water Momtormg System Upgrade Plan AppendIX A (Volume 2) (MWI, 1995b) and melude (1) (11) (m) (IV) (V) (VI) Data Measurement Surface water resources measurement procedures (SectIOn 10 0), Surface water sample collectIOn (SectIOn 6 0), Sample preservatIOn and shIpment (SectIOn 20), Cham-of-custody control (SectIOn 20), QualIty assurance (SectIOn 2 0), and Data management (SectIOn 3 0) Spnngs water resources data measurement IS SImIlar to that of surface water resources Data wIll be obtamed m accordance WIth mtematIOnally accepted procedures SectIOn 100 ofthe Water Momtonng System Upgrade Plan AppendIX A (Volume 2 - Water Momtormg System Procedures) presents detailed descnptIOns of data measurement technIques and procedures to be followed for the spnngs or surface water resources momtonng program PrImanly, water level (heIght for weIr measurement method), water velOCIty, and cross-sectIOnal area data WIll be measured and recorded m the field SectIOn 50 of the Water Momtormg System Upgrade Plan AppendIX A (Volume 2 - Water Momtonng System Procedures) presents general mformatlOn for planmng a water measurement event \ \monItor\m-plans\sprmgs\spring wr rvO 19 3114-97-1c-037 December 1997

Sample CollectiOn Mll11stry of Water and Irngatlon Water Qualtty Improvement and ConservatIOn Project Sprmg Momtonng Plan Sprmgs water samples WIll be obtamed m accordance WIth mtematIonally accepted procedures Samples wIll be handled and transported with full cham-of-custody SectiOn 6 0 of the Water Momtonng System Upgrade Plan AppendIx A (Volume 2 - Water Momtonng System Procedures) presents detaIled descnptiOns of the samphng procedures to be followed for the surface water momtonng program SpecIfic conductance, temperature, and pH WIll be analyzed and recorded m the field Table 14 presents a genenc summary of mformatiOn relatmg to contamer type and volume, preservatiOn technIque, and holdmg tIme for chemIcal parameters for whIch samples Will be collected SectIon 4 0 of the Water Momtormg System Upgrade Plan AppendIx A (Volume 2 - Water Momtonng System Procedures) presents general practices and procedures for field operatiOns to ensure collectIOn ofrepresentative data and samples SectiOn 5 a of the Water Momtonng System Upgrade Plan AppendIx A (Volume 2 - Water Momtonng System Procedures) presents general mformatiOn for planmng a water quahty samplmg event Quahty Assurance Quahty assurance protocols for the momtonng program are presented m SectiOn 2 4 of the Water Momtonng System Upgrade Plan AppendIX A (Volume 2 - Water Momtonng System Procedures) These protocols descnbe the system to promote collectiOn of representative and defenSible data, use of field mstrumentatiOn, eqmpment calibratlOn, sample documentatIOn and record keepmg reqUIrements, and quahty control samples Use of field logs and field report forms IS speCIfied to mamtam proper sample documentatIOn SectIOn 10 aofthe Water Momtonng System Upgrade Plan AppendIX A (Volume 2 - Water Momtonng System Procedures) prOVIdes general mformatIon about use of field mstrumentatIOn, eqmpment cahbratIOn, data documentatIOn and record keepmg reqmrements Use offield logs and field report forms IS speCIfied to mamtam proper documentatIOn ofmeasurement data Quahty control samples shall be collected m accordance WIth the quahty assurance gUIdelmes descnbed ill SectIOn 24 ofthe Water Momtonng System Upgrade Plan AppendIX A (Volume 2 - Water Momtonng System Procedures) FIeld, eqUipment, and tnp blanks and duphcate samples WIll be used to prOVIde field quahty assurance for spnngs water samples A \ \momtor\m-plans\spnngs\spnng-wr rvO 20 3114-97-1c-037 December 1997

Fragile Lands of Latin America Strategies for ... - PART - USAID
USAID REGIONAL HIV/AIDS PROGRAM - part - usaid
Building Integrated Capacity for Infrastructure (BICI) - part - usaid
vailability, Access and Nutrition - part - usaid
and Integrated Pest Management - part - usaid
Jurisprudence of Equality Program - PART - USAID
assessment of social accountability standards - part - USAid
expanding agriculture and food security activities in ... - part - usaid
conflict early warning and prevention: toward a ... - part - usaid
Project on National Security Reform - part - usaid
Afghanistan Accelerating Sustainable Agriculture ... - part - usaid
ACCESS OF FOOTWEAR RAW MATERIAL INPUTS - part - USAid
CONSERVING BIOLOGICAL DIVERSITY IN ... - part - usaid
Theme 4. Socioeconomics and Policy - (PDF, 101 mb) - USAID
Knowledge, Attitudes and Practices Study - part - usaid
MU.,Coo,0O - PDF, 101 mb - usaid
integrated protected area co-management (ipac) - part - usaid
A Rapid Assessment of the Specialty Coffee Value Chain in ... - usaid
Global Waters - June, 2013 - usaid