Views
5 years ago

0712-0299ZX60USB-3 - Flannery Plant Hire

0712-0299ZX60USB-3 - Flannery Plant Hire

0712-0299ZX60USB-3 - Flannery Plant

URL:http://www.hitachi-c-m.com This book is printed on recycled paper. PRINTED IN JAPAN (E) 2008, 01 ZAXIS60USB-3 HYDRAULIC EXCAVATOR OPERATOR’S MANUAL EM1N1-NA1-1 PART NO. EM1N1-NA1-1 60USB-3 Hydraulic Excavator Serial No. 0010001 and up

  • Page 2 and 3: Read this manual carefully to learn
  • Page 5 and 6: The manufacturing Nos. explained in
  • Page 7 and 8: MACHINE NUMBERS SAFETY Recognize Sa
  • Page 9 and 10: Battery ...........................
  • Page 11 and 12: RECOGNIZE SAFETY INFORMATION • Th
  • Page 13 and 14: WEAR PROTECTIVE CLOTHING SAFETY •
  • Page 15 and 16: ADJUST THE OPERATOR'S SEAT SAFETY
  • Page 17 and 18: OPERATE ONLY FROM OPERATOR'S SEAT S
  • Page 19 and 20: INVESTIGATE JOB SITE BEFOREHAND SAF
  • Page 21 and 22: DRIVE MACHINE SAFELY SAFETY • Dri
  • Page 23 and 24: AVOID INJURY FROM ROLLAWAY ACCIDENT
  • Page 25 and 26: SAFETY KEEP PERSONNEL CLEAR FROM WO
  • Page 27 and 28: DIG WITH CAUTION SAFETY • Acciden
  • Page 29 and 30: PARK MACHINE SAFELY • Unless the
  • Page 31 and 32: PRACTICE SAFE MAINTENANCE SAFETY
  • Page 33 and 34: SUPPORT MACHINE PROPERLY SAFETY •
  • Page 35 and 36: REPLACE RUBBER HOSES PERIODICALLY S
  • Page 37 and 38: Precautions for Handling Flammables
  • Page 39 and 40: PRECAUTIONS FOR WELDING AND GRINDIN
  • Page 41 and 42: PRECAUTIONS FOR HANDLING REFRIGERAN
  • Page 43 and 44: SAFETY SIGNS SS-259 SS-024 SS309048
  • Page 45 and 46: ROPS/TOPS/FOPS Cab SAFETY SIGNS SS4
  • Page 47 and 48: COMPONENTS NAME 4 5 1- Bucket 2- Ar
  • Page 49 and 50: 17- Air Conditioner Control Panel 1
  • Page 51 and 52: MONITOR PANEL 1- Coolant Temperatur
  • Page 53 and 54:

    OPERATOR’S STATION Alternator Ind

  • Page 55 and 56:

    HOW TO OPERATE TRIP METER OPERATOR

  • Page 57 and 58:

    Auto-Idle Mode Switch OPERATOR’S

  • Page 59 and 60:

    OPERATOR’S STATION Heating Operat

  • Page 61 and 62:

    RADIO 1- Radio/Clock OPERATOR’S S

  • Page 63 and 64:

    OPERATOR’S STATION Tuning Procedu

  • Page 65 and 66:

    OPENING/CLOSING CAB FRONT WINDOW OP

  • Page 67 and 68:

    EMERGENCY EXIT If the operator’s

  • Page 69 and 70:

    BREAKING IN NEW MACHINE BREAK-IN IM

  • Page 71 and 72:

    BEFORE STARTING ENGINE OPERATING TH

  • Page 73 and 74:

    OPERATING THE ENGINE STARTING THE E

  • Page 75 and 76:

    USING BOOSTER BATTERIES OPERATING T

  • Page 77 and 78:

    TRAVEL LEVERS AND PEDALS DRIVING TH

  • Page 79 and 80:

    TRAVEL MODE SWITCH DRIVING THE MACH

  • Page 81 and 82:

    TOWING THE MACHINE DRIVING THE MACH

  • Page 83 and 84:

    PARKING AND STOPPING ON SLOPES DRIV

  • Page 85 and 86:

    CONTROL LEVER (ISO EXCAVATOR PATTER

  • Page 87 and 88:

    OPERATING THE MACHINE CONTROL LEVER

  • Page 89 and 90:

    AUXILIARY PEDAL (OPTIONAL) OPERATIN

  • Page 91 and 92:

    PRECAUTIONS FOR BLADE OPERATION Thi

  • Page 93 and 94:

    WARMING UP OPERATION OPERATING THE

  • Page 95 and 96:

    OPERATING BACKHOE OPERATING THE MAC

  • Page 97 and 98:

    AVOID STRIKING WITH BUCKET OPERATIN

  • Page 99 and 100:

    AVOID HITTING BLADE WITH BUCKET OPE

  • Page 101 and 102:

    OPERATING THE MACHINE 3. Operating

  • Page 103 and 104:

    HYDRAULIC BREAKER (OPTIONAL) OPERAT

  • Page 105 and 106:

    Average Breaker Operating Availabil

  • Page 107 and 108:

    CRUSHER OPERATION (OPTIONAL) OPERAT

  • Page 109 and 110:

    AUXILIARY FLOW RATE CONTROL (OPTION

  • Page 111 and 112:

    3. Lower the boom in the following

  • Page 113 and 114:

    TRANSPORTING BY ROAD TRANSPORTING W

  • Page 115 and 116:

    TRANSPORTING SECURING THE MACHINE T

  • Page 117 and 118:

    LIFTING MACHINE WITH CRANE TRANSPOR

  • Page 119 and 120:

    Class ZX60USB-3 Class MAINTENANCE H

  • Page 121 and 122:

    PREPARE MACHINE FOR INSPECTION/MAIN

  • Page 123 and 124:

    OPENING/CLOSING TANK COVERS MAINTEN

  • Page 125 and 126:

    DAILY INSPECTION Tooth Arm Arm Cyli

  • Page 127 and 128:

    MAINTENANCE GUIDE MAINTENANCE A. GR

  • Page 129 and 130:

    H. ELECTRICAL SYSTEM (See Page 7-51

  • Page 131 and 132:

    MAINTENANCE Fuel Oil IMPORTANT: Use

  • Page 133 and 134:

    A. GREASING Front Joint Pins (Incl.

  • Page 135 and 136:

    (6) Swing cylinder (7) Swing post M

  • Page 137 and 138:

    Swing Bearing --- every 250 hours M

  • Page 139 and 140:

    Tilt Mechanism --- every 250 hours

  • Page 141 and 142:

    MAINTENANCE 5. Remove oil filter (3

  • Page 143 and 144:

    MAINTENANCE Change Gear Oil --- eve

  • Page 145 and 146:

    Check Hydraulic Oil Level --- daily

  • Page 147 and 148:

    Change Hydraulic Oil --- every 1000

  • Page 149 and 150:

    MAINTENANCE Clean Suction Filter---

  • Page 151 and 152:

    Replace Pilot Filter --- every 1000

  • Page 153 and 154:

    Check Hoses and Lines --- daily ---

  • Page 155 and 156:

    Hose Fitting • Metal Face Seal Fi

  • Page 157 and 158:

    MAINTENANCE Quick Coupler 1. Connec

  • Page 159 and 160:

    E. FUEL SYSTEM MAINTENANCE CAUTION:

  • Page 161 and 162:

    Replace Fuel Filter --- every 500 h

  • Page 163 and 164:

    F. AIR CLEANER Clean the Air Cleane

  • Page 165 and 166:

    Check Coolant Level --- daily MAINT

  • Page 167 and 168:

    Change Coolant --- Twice a year (Sp

  • Page 169 and 170:

    H. ELECTRICAL SYSTEM MAINTENANCE IM

  • Page 171 and 172:

    MAINTENANCE Check Electrolyte Speci

  • Page 173 and 174:

    I. MISCELLANEOUS MAINTENANCE Check

  • Page 175 and 176:

    Replace Bucket --- As required MAIN

  • Page 177 and 178:

    Loosen Track (Rubber Crawler) MAINT

  • Page 179 and 180:

    MAINTENANCE Installing Rubber Track

  • Page 181 and 182:

    Loosen Track (Steel Crawler) MAINTE

  • Page 183 and 184:

    Check Air Conditioner --- daily MAI

  • Page 185 and 186:

    MAINTENANCE CAUTION: Use reduced co

  • Page 187 and 188:

    MAINTENANCE Check, Clean and Functi

  • Page 189 and 190:

    MAINTENANCE Check Tightening Torque

  • Page 191 and 192:

    Tightening Torque Chart Bolt Dia. W

  • Page 193 and 194:

    PREPARATION FOR INSPECTION AND MAIN

  • Page 195 and 196:

    TILTING FLOOR DOWN WARNING: Do not

  • Page 197 and 198:

    CONSUMABLE PARTS LIST Filter Elemen

  • Page 199 and 200:

    MAINTENANCE UNDER SPECIAL ENVIRONME

  • Page 201 and 202:

    STORING THE MACHINE STORAGE 1. Thor

  • Page 203 and 204:

    Engine will not start TROUBLESHOOTI

  • Page 205 and 206:

    TROUBLESHOOTING ENGINE Problem Caus

  • Page 207 and 208:

    TROUBLESHOOTING ENGINE Problem Caus

  • Page 209 and 210:

    TROUBLESHOOTING ELECTRICAL SYSTEM P

  • Page 211 and 212:

    TROUBLESHOOTING CONTROL LEVERS Prob

  • Page 213 and 214:

    TROUBLESHOOTING HYDRAULIC SYSTEM Pr

  • Page 215 and 216:

    SPECIFICATIONS SPECIFICATION Type Z

  • Page 217 and 218:

    SHOE TYPES AND APPLICATIONS SPECIFI

  • Page 219 and 220:

    ADDITIONAL COUNTERWEIGHT The mass v

  • Page 221 and 222:

    A AM/FM Radio Operation............

  • Page 223 and 224:

    Towing the Machine ................

colour - Green Design Plant Hire
Ridgway Rentals Plant Machinery Guide May 17
WARNING - Flannery Plant Hire
Untitled - Flannery Plant Hire
Untitled - Flannery Plant Hire
Untitled - Flannery Plant Hire
Untitled - Flannery Plant Hire
Untitled - Flannery Plant Hire
GP.SERVICES - Sonic Plant Hire
MINIMIX 150 - Rapid Plant and Tool Hire
Ec13 - Plant Hire UK Limited
EC13 - Plant Hire UK Limited
plant list - Belmont Engineering
8457 JS145HD Spec (UK) Issue 3