Views
5 years ago

0712-0299ZX60USB-3 - Flannery Plant Hire

0712-0299ZX60USB-3 - Flannery Plant Hire

PIPING FOR BREAKER AND

PIPING FOR BREAKER AND CRUSHER (OPTIONAL) OPERATING THE MACHINE Operational procedures for stop valve and selection valve. A-Selection valve Operate the selection valve after removing rubber cap. Stop valves B, C Close: When not using attachment or is detached. Open : When using attachment B C M1M0-05-004 M1M0-05-006 5-18 B-Stop valve Close Open C- Stop valve Close Open A M1M0-05-005 M1M0-05-007 M1M0-05-008 M1M0-05-009 M1M0-05-010

HYDRAULIC BREAKER (OPTIONAL) OPERATING THE MACHINE Before installing a hydraulic breaker to the machine, change in machine stability, and the hydraulic pressure and flow rate to operate the hydraulic breaker must be checked. Consult your authorized dealer for selection of the hydraulic breaker model to be installed. Refer to the Breaker Operation Manual for operation of the hydraulic breaker. Observe the following instructions to prevent the base machine and the hydraulic breaker from being damaged. Precautions for Installing Hydraulic Breaker Pipe Lines • When disconnecting or reconnecting the hydraulic breaker hoses from or to the hydraulic pipe lines at the arm tip, take care not to allow dust to stain or enter the inside of pipes and hoses. • When the hydraulic breaker is not installed, be sure to put caps or plugs to the arm tip pipe open ends and the hydraulic breaker side hose ends to prevent the hydraulic system from being contaminated by dust. Be careful not to lose the caps and plugs. Always keep the auxiliary parts in the tool box. • Check that the pipe clamp bolts are tight, and no oil is leaking from the pipe and hose joints before operating the hydraulic breaker. Precautions for Hydraulic Breaker Operation WARNING: When the hydraulic breaker is installed, machine stability is reduced as the breaker is much heavier than the bucket. In addition, soil, broken pieces of rock or metals may be scattered during breaker operation, potentially creating hazardous situation. Take protective measures against danger of machine tipping over and/or scattering of hard materials and observe the precautions described below to ensure safe operation. 1. Avoid crashing the breaker onto hard materials. The breaker is heavier than the bucket, causing the lowering speed of the breaker to become faster. If breaking hard materials by crashing the breaker onto hard materials is attempted, damage to the front attachment and/or the upperstructure may result due to accelerated crashing reaction force. 2. Do not move crushed materials using the breaker unit and/or the swing function. Damage to the boom, arm, and/or breaker may result. 5-19 WRONG M1M7-05-020 WRONG M585-05-020

colour - Green Design Plant Hire
Ridgway Rentals Plant Machinery Guide May 17
WARNING - Flannery Plant Hire
Untitled - Flannery Plant Hire
Untitled - Flannery Plant Hire
Untitled - Flannery Plant Hire
Untitled - Flannery Plant Hire
Untitled - Flannery Plant Hire
GP.SERVICES - Sonic Plant Hire
MINIMIX 150 - Rapid Plant and Tool Hire
Ec13 - Plant Hire UK Limited
EC13 - Plant Hire UK Limited
plant list - Belmont Engineering