Views
5 years ago

0712-0299ZX60USB-3 - Flannery Plant Hire

0712-0299ZX60USB-3 - Flannery Plant Hire

LOADING TRANSPORTING

LOADING TRANSPORTING WARNING: • Always turn the auto-idle switch OFF. Failure to do so may cause the engine speed to suddenly change. • Always travel the machine slowly. Press the travel mode switch (1) toward the TURTLE side. • Steering on a ramp may create a danger of tipping over. Never attempt to change travel direction on a ramp, possibly causing the machine to become unstable. If steering is unavoidable, first move back to the ground, modify traveling direction, and begin to drive again. • The top end of the ramp where it meets the flatbed, there is a sudden bump. Slowly drive over it. • Use extra care when rotating the upperstructure on the flatbed to prevent possible injury from machine tipping. Slowly rotate the upperstructure with the arm fully rolled in under the boom to maintain the good machine stability. 1. Load the machine on the trailer so that the centerline of the machine aligns with the centerline of the flatbed. 2. Drive the machine onto the ramp slowly. 3. Position the bucket above the flatbed. Operate the front attachment so that the angle between the boom and the arm is maintained at 90 to 110°. 4. The machine tips forward when the machine travels over the top end of the ramp. Lower the bucket onto the flatbed before the machine begins to tip forward. 5. After the machine reaches the specified position, slightly lift the bucket up off the flatbed. Slowly rotate the upperstructure 180° while keeping the arm fully rolled in. 6. Lower the bucket on wooden blocks seated on the flatbed. 7. Stop the engine. Remove the key from the switch. 8. Move the pilot control shut-off lever to the LOCK position. 9. Cover the openings on the machine to prevent wind and/or rain from coming in. CAUTION: During cold weather season, be sure to sufficiently warm up the machine before loading or unloading the machine. 6-2 1 Less than 15 ゚ M1M0-06-001 M1M7-06-001

TRANSPORTING SECURING THE MACHINE TO THE TRAILER FOR TRANSPORTATION WARNING: Securely tighten the machine to the flatbed with wire ropes. During transportation, the machine will be moved back and forth or laterally. 1. Wedge the front and rear of the crawlers to secure the machine in position. 2. Securely tighten the base machine and the front attachment to the flatbed with wire ropes. Transporting the machine equipped with rubber crawlers When securing the machine to the flatbed, do not directly tighten the rubber crawler with wire ropes. As illustrated below, be sure to fasten the right and left side frames securely to the flatbed with wire ropes and soft protectors. Soft Protector Side Frame Lower Roller Rubber Crawler Truck Flatbed 6-3 Wire Rope M102-06-003

Neuson Zero-Tail Swing Excavator 50Z3/6003 - Chase Plant Hire
Ridgway Rentals Plant Machinery Guide May 17
Get inspired by - Green Design Plant Hire
3. Fusarium mycotoxins in cereals - Plant Research International ...
Quick Coupler Safety Quick Coupler Safety - Flannery Plant Hire
4878 JS200W Spec (Iss2) (UK) - Flannery Plant Hire
s130 skid-steer loader specifications - Ringby Plant Hire Ltd
MINIMIX 150 - Rapid Plant and Tool Hire
ALR 900 | AVR 1100 - PSM PLANT & TOOL HIRE CENTRES LTD
Hiring cell gatekeepers - ABC transporters in plant ... - BioTechnologia
15. LOADERS - CPHA - Contractors Plant Hire Association
New Copy of Stock List Hire Rates - Baileys Plant Hire Ltd
Pacific Coast Canola Begins Hiring for New Plant - Legumex Walker ...
JCB TRACKED EXCAVATOR | JS130 L T.A.B. - Exuma Plant Hire
Hilti - TE15-C - Light Duty Electric Breaker - Exsel Plant & Tool Hire Ltd
CES 3 2011 Hire of Plant SCHEDULES - Drakenstein municipality
Construction Plant World - 28th June 2018
Atlas Copco Portable air compressors Series 7, - Plant Hire UK Limited