Views
5 years ago

0712-0299ZX60USB-3 - Flannery Plant Hire

0712-0299ZX60USB-3 - Flannery Plant Hire

E. FUEL SYSTEM (See Page

E. FUEL SYSTEM (See Page 7-41) MAINTENANCE Fuel tank capacity: 120L (31.7 US gal) Parts Quantity 8 50 Interval (hours) 100 250 500 1000 2000 1. Check Water Separator 1 2. Drain Fuel Tank Sump 1 As needed 3. Replace Fuel Filter 1 4. Check Fuel Hoses for leaks, cracks, etc. for cracks, bend, etc. − − NOTE: The fuel filter may become clogged earlier than normal due to contaminated fuel. In case the engine power is reduced, or black smoke increases, shorten the intervals of inspection/maintenance. F. AIR CLEANER (See Page 7-45) Parts Quantity 8 50 Interval (hours) 100 250 500 1000 2000 1. Air Cleaner Element Cleaning Replacement 1 1 � Or clogged After cleaning 6 times or 1 year NOTE: � Shorten the interval in a dusty work site. G. COOLING SYSTEM (See Page 7-46) Parts Quantity 8 50 Interval (hours) 100 250 500 1000 2000 1. Check Coolant Level 1 2. Check and Adjust Fan Belt Tension 1 �� 3. Change Coolant 6.5 L (1.7 US gal) 7-10 � Twice a year (spring and autumn) 4. Clean Radiator/Oil Cooler Outside 1 � Core Interior 1 When changing coolant 5. Clean Air Conditioner Condenser 1 � 6. Clean Air Conditioner Condenser Front Screen 1 � NOTE: � Shorten maintenance interval in dusty work site. �� For the first time only. NOTE: � When genuine Hitachi long life coolant (LLC) is used, replace it every two years (in autumn) or after 2000 operating hours, whichever comes first. IMPORTANT: Use fresh water or tap water for the coolant. Avoid using strong acid or alkaline water. Be sure to use genuine Hitachi long life coolant (LLC).

H. ELECTRICAL SYSTEM (See Page 7-51) MAINTENANCE Parts Quantity 8 50 Interval (hours) 100 250 500 1000 2000 1. Battery Electrolyte Level Check Check Electrolyte Specific Gravity 2 2 Every month Every month 2. Replacing Fuses - As required I. MISCELLANEOUS (See Page 7-55) Parts Quantity 8 50 Interval (hours) 100 250 500 1000 1500 2000 1. Check Bucket Teeth – 2. Replace Bucket 1 As required 3. Check Track Sag (rubber crawler) and damage 2 4. Replace Rubber Crawler 2 As required 5. Check Track Sag (steel crawler) (Optional) 2 6. Check and Replace Seat Belt 7. Check air conditioner 1 Every 3 years (Replace) 8. Check Air Conditioner Filter Circulating Air Filter Fresh Air Filter Cleaning Replacement Cleaning Replacement 1 1 1 1 After cleaning 6 times or so After cleaning 6 times or so 9. Clean Cab Floor – As required 10. Check, Clean and Function Check Fuel Injection Nozzles – ♦ 11. Check and Adjust Valve Clearance – ♦ 12. Check, Clean and Function Check EGR Valve – ♦ 13. Measure Engine Compression Pressure – ♦ 14. Check Starter and Alternator – ♦ 15. Check Crank Breather – ♦ 16. Check Tightening Torque of Bolts and Nuts – �� NOTE: Consult your authorized dealer for inspection/maintenance of items with mark♦. The recommended oil chart is affixed on the operator’s seat base lid. ★★ For the first time only. 7-11

Neuson Zero-Tail Swing Excavator 50Z3/6003 - Chase Plant Hire
Ridgway Rentals Plant Machinery Guide May 17
Get inspired by - Green Design Plant Hire
3. Fusarium mycotoxins in cereals - Plant Research International ...
Quick Coupler Safety Quick Coupler Safety - Flannery Plant Hire
4878 JS200W Spec (Iss2) (UK) - Flannery Plant Hire
s130 skid-steer loader specifications - Ringby Plant Hire Ltd
MINIMIX 150 - Rapid Plant and Tool Hire
ALR 900 | AVR 1100 - PSM PLANT & TOOL HIRE CENTRES LTD
15. LOADERS - CPHA - Contractors Plant Hire Association
Hiring cell gatekeepers - ABC transporters in plant ... - BioTechnologia
New Copy of Stock List Hire Rates - Baileys Plant Hire Ltd
Pacific Coast Canola Begins Hiring for New Plant - Legumex Walker ...
JCB TRACKED EXCAVATOR | JS130 L T.A.B. - Exuma Plant Hire
Hilti - TE15-C - Light Duty Electric Breaker - Exsel Plant & Tool Hire Ltd
CES 3 2011 Hire of Plant SCHEDULES - Drakenstein municipality
Construction Plant World - 28th June 2018
Atlas Copco Portable air compressors Series 7, - Plant Hire UK Limited