Views
5 years ago

0712-0299ZX60USB-3 - Flannery Plant Hire

0712-0299ZX60USB-3 - Flannery Plant Hire

Gear Oil Manufacturer

Gear Oil Manufacturer Air Temp Gear Oil –20 to 40°C (–6 to 104°F) British Petroleum BP Gear oil SAE 90 EP Caltex Oil Universal Thuban SAE 90 Esso Esso Gear oil 90 Idemitsu Kosan Apoll oil gear HE90 Exxon Mobil Mobilube HD80W-90 Eneos � Hypoid gear 90 Shell Oil Shell Spirax EP 90 Remarks API GL4 class MAINTENANCE NOTE: The machine shipped from the factory is filled with oil marked �. Hydraulic Oil Hydraulic Oil Change Interval 2000 hours 1000 hours Manufacturer Air Temp –20 to 40°C (–4 to 104°F) –10 to 40°C (14 to 104°F) 7-14 –20 to 40°C (–4 to 104°F) –10 to 40°C (14 to 104°F) Hitachi � Super EX 46 HN Malti M TOTAL Equivis ZS 46 Idemitsu Kosan Dephne Superhydro LW46H British Petroleum Bartran HV46 Caltex Oil Rando Oil HD46 Texaco INC. Rando Oil HD46 Chevron U.S.A INC Chevron AW46 Esso NUTO H46 Mobil Oil DTE 25 Shell Oil Tellus Oil S46 Tellus Oil R46 NOTE: The machine shipped from the factory is filled with oil marked �.

A. GREASING Front Joint Pins (Incl. Swing Post Joint Pins) --- every 500 hours or every years (every 100 hours up to 500 hours of operation) MAINTENANCE 1. Position machine with the arm cylinder fully retracted and the bucket cylinder fully extended. Lower bucket to the ground (the front attachment inspection position). All greasing points can be lubricated from the ground. 2. Grease all grease fittings illustrated below. (1) Boom cylinder rod end (2) Boom cylinder bottom 7-15 M1M7-05-024 M1M7-07-020 M1M7-07-021

colour - Green Design Plant Hire
Ridgway Rentals Plant Machinery Guide May 17
WARNING - Flannery Plant Hire
Untitled - Flannery Plant Hire
Untitled - Flannery Plant Hire
Untitled - Flannery Plant Hire
Untitled - Flannery Plant Hire
Untitled - Flannery Plant Hire
GP.SERVICES - Sonic Plant Hire
MINIMIX 150 - Rapid Plant and Tool Hire
EC13 - Plant Hire UK Limited
Ec13 - Plant Hire UK Limited
plant list - Belmont Engineering