Drain Hydraulic Oil Tank

Drain Hydraulic Oil Tank Sump --- every 250 hours MAINTENANCE CAUTION: Be sure to work only after oil temperature is low or before operation. Failure to do so may allow high temperature oil to spray, possibly causing severe burns. 1. Park the machine on a solid level surface. Position the machine with the arm cylinder fully retracted and the bucket cylinder fully extended. Lower the bucket and blade to the ground. Stop the engine. 2. Leave the machine without operating the machine until hydraulic oil becomes cool. Then, bleed air pressure from the hydraulic oil tank. 3. Slowly loosen drain plug (1) on the bottom of the hydraulic oil tank to drain water and sediment. 7-28 1 M1M7-05-024 M1M0-07-007

Change Hydraulic Oil --- every 1000 hours or 2000 hours MAINTENANCE CAUTION: Be sure to work only after oil temperature is low or before operation. Failure to do so may allow high temperature oil to spray, possibly causing severe burns. IMPORTANT: When changing hydraulic oil, take care not to allow foreign matter such as dirt, water or soil to enter the hydraulic system. Hydraulic oil changing intervals differ according to kind of hydraulic oil used. 1. Park the machine on a solid level surface. Position the machine with the arm cylinder fully retracted and the bucket cylinder fully extended. Lower the bucket and blade to the ground. Stop the engine. 2. Remove the cover above the hydraulic oil tank. Loosen filler cap (1) on the hydraulic oil tank to release air pressure from the hydraulic oil tank. 3. Remove cap (1). 4. Arrange a 100L (26.4 US gal)container. Drain oil using a suction pump. 5. Slowly loosen drain plug (2) on the bottom of the hydraulic oil tank. Allow oil to drain thoroughly 6. Clean, install and tighten drain plug (2) to the original position. Wrench Size : 27 mm (G1/2 Hexagonal Head Plug with O-ring) Tightening Torque : 95 N⋅m (9.5 kgf⋅m, 70 lbf⋅ft) 7. Supply hydraulic oil via the filler port on the top of the hydraulic oil tank while checking the oil level with level gauge (3). 7-29 1 2 3 M1M7-05-024 M1M7-07-036 M1M0-07-007 M1M7-03-004

Neuson Zero-Tail Swing Excavator 50Z3/6003 - Chase Plant Hire
Get inspired by - Green Design Plant Hire
Ridgway Rentals Plant Machinery Guide May 17
3. Fusarium mycotoxins in cereals - Plant Research International ...
4878 JS200W Spec (Iss2) (UK) - Flannery Plant Hire
Quick Coupler Safety Quick Coupler Safety - Flannery Plant Hire
s130 skid-steer loader specifications - Ringby Plant Hire Ltd
MINIMIX 150 - Rapid Plant and Tool Hire
ALR 900 | AVR 1100 - PSM PLANT & TOOL HIRE CENTRES LTD
New Copy of Stock List Hire Rates - Baileys Plant Hire Ltd
Hiring cell gatekeepers - ABC transporters in plant ... - BioTechnologia
15. LOADERS - CPHA - Contractors Plant Hire Association
Pacific Coast Canola Begins Hiring for New Plant - Legumex Walker ...
JCB TRACKED EXCAVATOR | JS130 L T.A.B. - Exuma Plant Hire
Hilti - TE15-C - Light Duty Electric Breaker - Exsel Plant & Tool Hire Ltd
CES 3 2011 Hire of Plant SCHEDULES - Drakenstein municipality
Construction Plant World - 28th June 2018
Atlas Copco Portable air compressors Series 7, - Plant Hire UK Limited