Views
5 years ago

0712-0299ZX60USB-3 - Flannery Plant Hire

0712-0299ZX60USB-3 - Flannery Plant Hire

Replace Full Flow Filter

Replace Full Flow Filter --- every 500 hours (first time after 250 hours) MAINTENANCE CAUTION: Be sure to work only after oil temperature is low or before operation. Failure to do so may allow high temperature oil to spray, possibly causing severe burns. 1. Park the machine on a solid level surface. Position the machine with the arm cylinder fully retracted and the bucket cylinder fully extended. Lower the bucket and blade to the ground. Stop the engine. 2. Before replacing the element, be sure to loosen the hydraulic oil tank cap to release the air pressure from the hydraulic oil tank. 3. Loosen four bolts (1) to remove cover (2) and O-ring (3). While pressing cover (2) down, slowly remove cover (2) so that spring (4) does not fly out. 4. Remove spring (4), valve (5) and element (6). 5. Take care not to allow water and/or dirt to enter the filter case. 6. Be careful not to damage element (6) and O-ring (3). Do not use a broken element. 7. Install new element (6), and O-ring (3) in the hydraulic oil tank 8. Install cover (2) with four bolts (1). Wrench size: 13 mm Tightening torque: 10 N⋅m (1 kgf⋅m, 7 lbt⋅ft) 9. After replacing the element, bleed air from the pump. Check the oil level in the hydraulic oil tank. (Refer to “Bleed Air from Hydraulic System.”) If the machine is operated without completely bleeding air from the hydraulic system, damage to the pump may result. 10. Replace the element at the specified interval to keep hydraulic oil clean and extend the service life of hydraulic components. 7-32 1 2 3 4 5 6 M1M7-05-024 M1M7-07-004

Replace Pilot Filter --- every 1000 hours MAINTENANCE CAUTION: Be sure to work only after oil temperature is low or before operation. Failure to do so may allow high temperature oil to spray, possibly causing severe burns. 1. Park the machine on a solid level surface. Position the machine with the arm cylinder fully retracted and the bucket cylinder fully extended. Lower the bucket and blade to the ground. Stop the engine. 2. Before replacing the element, be sure to loosen the hydraulic oil tank cap to release the air pressure from the hydraulic oil tank. 3. Remove bolts (3) to remove under cover (2) from the rear left bottom side of the base machine. Wrench size: 17 mm 7-33 1 3 2 M1M7-05-024 M1M7-07-036 M1M7-07-039 M1M0-07-008

Neuson Zero-Tail Swing Excavator 50Z3/6003 - Chase Plant Hire
Get inspired by - Green Design Plant Hire
Ridgway Rentals Plant Machinery Guide May 17
3. Fusarium mycotoxins in cereals - Plant Research International ...
4878 JS200W Spec (Iss2) (UK) - Flannery Plant Hire
Quick Coupler Safety Quick Coupler Safety - Flannery Plant Hire
s130 skid-steer loader specifications - Ringby Plant Hire Ltd
MINIMIX 150 - Rapid Plant and Tool Hire
New Copy of Stock List Hire Rates - Baileys Plant Hire Ltd
ALR 900 | AVR 1100 - PSM PLANT & TOOL HIRE CENTRES LTD
Hiring cell gatekeepers - ABC transporters in plant ... - BioTechnologia
15. LOADERS - CPHA - Contractors Plant Hire Association
Pacific Coast Canola Begins Hiring for New Plant - Legumex Walker ...
JCB TRACKED EXCAVATOR | JS130 L T.A.B. - Exuma Plant Hire
Hilti - TE15-C - Light Duty Electric Breaker - Exsel Plant & Tool Hire Ltd
CES 3 2011 Hire of Plant SCHEDULES - Drakenstein municipality
Construction Plant World - 28th June 2018
Atlas Copco Portable air compressors Series 7, - Plant Hire UK Limited