Views
5 years ago

0712-0299ZX60USB-3 - Flannery Plant Hire

0712-0299ZX60USB-3 - Flannery Plant Hire

Check Fuel Hoses ---

Check Fuel Hoses --- daily --- every 250 hours MAINTENANCE CAUTION: • Escaping fuel may cause fire. Check for kinked hoses, or hoses that rub against each other and/or come in contact with other components, and any oil leaks. • Repair or replace any loose or damaged hoses. • Never install accurately bent or damaged hoses. Check hoses for oil leaks and/or damage while referring to the following tables. If any abnormality is found, repair it as instructed in the remedy column. Hoses Interval (Hours) Check Point Abnormality Remedy Daily Hose fittings Leak (1) Retighten or replace Soutache braid Rubbed marks (2) Replace hose surface Crack (2) Replace Every 250 Soutache braid Crack (3) Replace hours Hose surface Hose fittings Crack (4) Replace Hose Hose ends and fittings Acute bend (5) Collapse (6) Corrosion (7) 7-44 Replace Replace Replace 1 2 5 1 M137-07-003 3 4 M137-07-004 M137-07-005 6 7 M137-07-006

F. AIR CLEANER Clean the Air Cleaner Element --- every 250 hours or when the air cleaner indicator comes ON. Replace the Air Cleaner Element --- after cleaning six times or after one year Clean and replace air cleaner element (1). 1. Before servicing element (1), be sure to stop the engine. CAUTION: Be sure to wear safety glasses or goggles before removing cover (3). 2. Loosen three clamps (2) to remove cover (3) and element (1). MAINTENANCE CAUTION: Wear safety glasses or goggles when using compressed air pressure [less than 0.2 MPa (2 kgf/cm 2 , 29 psi)]. IMPORTANT: • Clean cover (3) to prevent dirt or water from entering the air cleaner suction port. If water enters the air cleaner suction port, damage to the engine may result. • When cleaning, do not hit element (1) or force the element (1) to collide against other object. 3. Clean element (1) by blowing compressed air pressure [less than 0.2 MPa (2 kgf/cm 2 , 29 psi)] from the inside of the element. After cleaning, be sure to check element (1) for damage. If any damage is found, replace the element with a new one. 4. If air filter indicator (5) comes ON immediately after cleaning the element even though cleaning is less than six times, replace the element (1) with a new one. 5. When installing cover (3), position the cover (3) so that valve (4) faces downward. Then, tighten the cover (3) with clamps (2) in the specified position. 7-45 2 3 4 4 2 1 5 5 M555-07-023 M1M0-07-013 M1M0-07-014

Neuson Zero-Tail Swing Excavator 50Z3/6003 - Chase Plant Hire
Get inspired by - Green Design Plant Hire
Ridgway Rentals Plant Machinery Guide May 17
3. Fusarium mycotoxins in cereals - Plant Research International ...
Quick Coupler Safety Quick Coupler Safety - Flannery Plant Hire
4878 JS200W Spec (Iss2) (UK) - Flannery Plant Hire
s130 skid-steer loader specifications - Ringby Plant Hire Ltd
MINIMIX 150 - Rapid Plant and Tool Hire
ALR 900 | AVR 1100 - PSM PLANT & TOOL HIRE CENTRES LTD
Hiring cell gatekeepers - ABC transporters in plant ... - BioTechnologia
15. LOADERS - CPHA - Contractors Plant Hire Association
New Copy of Stock List Hire Rates - Baileys Plant Hire Ltd
Pacific Coast Canola Begins Hiring for New Plant - Legumex Walker ...
JCB TRACKED EXCAVATOR | JS130 L T.A.B. - Exuma Plant Hire
CES 3 2011 Hire of Plant SCHEDULES - Drakenstein municipality
Hilti - TE15-C - Light Duty Electric Breaker - Exsel Plant & Tool Hire Ltd
Atlas Copco Portable air compressors Series 7, - Plant Hire UK Limited