Views
5 years ago

0712-0299ZX60USB-3 - Flannery Plant Hire

0712-0299ZX60USB-3 - Flannery Plant Hire

Replace Rubber Track ---

Replace Rubber Track --- As required MAINTENANCE CAUTION: • Do not loosen valve (1) too quickly or too much as high-pressure grease in the adjusting cylinder may spout out. Loosen carefully, keeping body parts and face away from valve (1). Never loosen grease fitting (2). • When removing the rubber track, do not allow anyone to stand in front of the front idler. During this procedure, the high power track adjuster may suddenly release the front idler with extreme force, potentially resulting in personal injury or death. • After the rubber track is removed, the front idle will become free to remove. If the front idle comes off unexpectedly, personal injury and/or death may result. Be sure to remove the rubber track only after taking appropriate measures to prevent the front idler from coming off. Removing Rubber Track 1. Lower the bucket and blade to raise both tracks off ground, as shown. Place blocks under machine frame to support the machine. 2. Slowly turn valve (1) counterclockwise to allow grease to escape from the grease outlet. 3. Insert two or three steel pipes into the gaps among lower rollers, track frame and rubber track and slowly rotate the track in reverse to lift the rubber track off the idler. Apply horizontal force to pry the rubber track off the idler. Before completely removing the rubber track from the front idler, take an appropriate measure to prevent the front idler from coming off. Then, remove the rubber track. 7-60 2 1 Direction of Rotation Direction of Rotation Grease Outlet Steel Pipes Steel Pipes M1M7-04-006 M1M0-07-021 M503-07-062 M503-07-063

MAINTENANCE Installing Rubber Track 1. Lower the bucket and blade to raise both tracks off ground. Place blocks under machine frame to support the machine. 2. Slowly turn valve (1) counterclockwise to allow grease to escape from the grease outlet. 3. Engage the rubber track with the sprocket and position the other end of the rubber track on the front idler. 4. While rotating the sprocket in reverse, apply horizontal force to the rubber track to seat it on the idler. 5. Insert a steel pipe into gaps among lower rollers, track frame and rubber track and rotate the rubber track slowly to correctly seat the rubber track on the idler. 6. Confirm that the rubber track is correctly engaged with the sprocket and idler. 7. Adjust track sag. (See page 7-59.) 8. After checking that the rubber track is correctly engaged with the sprocket and idler and the track sag is correctly adjusted, lower the machine to the ground. 7-61 2 1 Direction of Rotation Direction of Rotation Grease Outlet Steel Pipes Steel Pipes M1M0-07-021 M503-07-062 M503-07-063

Neuson Zero-Tail Swing Excavator 50Z3/6003 - Chase Plant Hire
Ridgway Rentals Plant Machinery Guide May 17
Get inspired by - Green Design Plant Hire
3. Fusarium mycotoxins in cereals - Plant Research International ...
Quick Coupler Safety Quick Coupler Safety - Flannery Plant Hire
4878 JS200W Spec (Iss2) (UK) - Flannery Plant Hire
s130 skid-steer loader specifications - Ringby Plant Hire Ltd
MINIMIX 150 - Rapid Plant and Tool Hire
ALR 900 | AVR 1100 - PSM PLANT & TOOL HIRE CENTRES LTD
Hiring cell gatekeepers - ABC transporters in plant ... - BioTechnologia
15. LOADERS - CPHA - Contractors Plant Hire Association
New Copy of Stock List Hire Rates - Baileys Plant Hire Ltd
Pacific Coast Canola Begins Hiring for New Plant - Legumex Walker ...
JCB TRACKED EXCAVATOR | JS130 L T.A.B. - Exuma Plant Hire
Hilti - TE15-C - Light Duty Electric Breaker - Exsel Plant & Tool Hire Ltd
CES 3 2011 Hire of Plant SCHEDULES - Drakenstein municipality
Construction Plant World - 28th June 2018
Atlas Copco Portable air compressors Series 7, - Plant Hire UK Limited