Views
5 years ago

0712-0299ZX60USB-3 - Flannery Plant Hire

0712-0299ZX60USB-3 - Flannery Plant Hire

STORAGE REMOVING THE

STORAGE REMOVING THE MACHINE FROM STORAGE CAUTION: Start the engine ONLY in a well-ventilated place. 1. Remove grease from the cylinder rods if coated. 2. Adjust alternator and fan belt tension. 3. Fill the fuel tank. Bleed air from the fuel system. Check all fluid levels. 4. Start the engine. Run the engine at half speed for several minutes before beginning full load operation. 5. Operate all hydraulic functions several cycles. 6. Carefully check all systems before operating the machine with a full load. NOTE: When the machine has been stored for a long time, be sure to perform the following steps as well: (a) Check the condition of all hoses and connections. (b) Warm up the engine. (c) Stop the engine. (d) Install new fuel filters. Replace the engine oil filter and fill the engine with oil. IMPORTANT: If the machine is not used for a long time, oil films on sliding surfaces may have break down. Operate the travel, swing and digging functions, 2 to 3 cycles each to lubricate the sliding surfaces. 10-2

Engine will not start TROUBLESHOOTING IMPOSSIBLE TO START THE ENGINE Problem Cause Solution Starter does not rotate or Discharged battery Charge or replace battery. is not powerful Disconnected, loose, or corroded After repairing the corroded area, battery terminals securely tighten the connectors. Lowered pilot control shut-off lever. Pull pilot control shut-off lever up. Disconnected, loose, or corroded After repairing the corroded area, starter ground line terminals. securely tighten the connectors. Faulty pilot control shut-off lever electrical system See your authorized dealer. Too high engine oil viscosity Change engine oil with appropriate viscosity. Faulty starter and/or electrical system See your authorized dealer. Starter rotates No fuel Even though the engine is started, the engine stalls soon Air in the fuel system Clogged fuel filter Frozen fuel Faulty injection pump Faulty engine control system Faulty preheat system Too low idle speed Clogged fuel filter Faulty engine control system Clogged air cleaner Faulty injection pump Engine runs irregularly Faulty fuel system Water or air in the fuel system Faulty engine control system 11-1 After checking that no fuel is leaking, refill fuel. Bleed air. After draining water, replace the element. Warm the fuel pump with hot water or wait until the atmospheric temperature rises. See your authorized dealer. See your authorized dealer. See your authorized dealer. See your authorized dealer. After draining water, replace the element. See your authorized dealer. Clean or replace the element. See your authorized dealer.. See your authorized dealer. Drain water or bleed air. See your authorized dealer.

Neuson Zero-Tail Swing Excavator 50Z3/6003 - Chase Plant Hire
Get inspired by - Green Design Plant Hire
Ridgway Rentals Plant Machinery Guide May 17
3. Fusarium mycotoxins in cereals - Plant Research International ...
Quick Coupler Safety Quick Coupler Safety - Flannery Plant Hire
4878 JS200W Spec (Iss2) (UK) - Flannery Plant Hire
s130 skid-steer loader specifications - Ringby Plant Hire Ltd
MINIMIX 150 - Rapid Plant and Tool Hire
ALR 900 | AVR 1100 - PSM PLANT & TOOL HIRE CENTRES LTD
Hiring cell gatekeepers - ABC transporters in plant ... - BioTechnologia
15. LOADERS - CPHA - Contractors Plant Hire Association
New Copy of Stock List Hire Rates - Baileys Plant Hire Ltd
Pacific Coast Canola Begins Hiring for New Plant - Legumex Walker ...
JCB TRACKED EXCAVATOR | JS130 L T.A.B. - Exuma Plant Hire
Hilti - TE15-C - Light Duty Electric Breaker - Exsel Plant & Tool Hire Ltd
CES 3 2011 Hire of Plant SCHEDULES - Drakenstein municipality
Construction Plant World - 28th June 2018
Atlas Copco Portable air compressors Series 7, - Plant Hire UK Limited