Views
5 years ago

0712-0299ZX60USB-3 - Flannery Plant Hire

0712-0299ZX60USB-3 - Flannery Plant Hire

The manufacturing Nos.

The manufacturing Nos. explained in this group is the individual number (serial No.) given to each machine and hydraulic components. These numbers are requested when inquiring any information on the machine and/or components. Fill these serial Nos. in the blank spaces in this group to immediately make them available upon request. MACHINE MODEL/TYPE: PRODUCT IDENTIFICATION NUMBER: PRODUCT IDENTIFICATION NUMBER PRODUCT IDENTIFICATION NUMBER: NOTE: Marks to indicate the ∗HCM1N100X00010001∗ start and end of the PIN PRODUCT IDENTIFICATION NUMBER (PIN) ENGINE TYPE: MFG. NO.: TRAVEL MOTOR TYPE: MFG. NO.: MACHINE NUMBERS M1M0-00-001 M1M0-00-002 M1M0-00-003 M1M0-00-004

  • Page 1 and 2: URL:http://www.hitachi-c-m.com This
  • Page 3: INDEX MACHINE NUMBERS SAFETY SAFETY
  • Page 7 and 8: MACHINE NUMBERS SAFETY Recognize Sa
  • Page 9 and 10: Battery ...........................
  • Page 11 and 12: RECOGNIZE SAFETY INFORMATION • Th
  • Page 13 and 14: WEAR PROTECTIVE CLOTHING SAFETY •
  • Page 15 and 16: ADJUST THE OPERATOR'S SEAT SAFETY
  • Page 17 and 18: OPERATE ONLY FROM OPERATOR'S SEAT S
  • Page 19 and 20: INVESTIGATE JOB SITE BEFOREHAND SAF
  • Page 21 and 22: DRIVE MACHINE SAFELY SAFETY • Dri
  • Page 23 and 24: AVOID INJURY FROM ROLLAWAY ACCIDENT
  • Page 25 and 26: SAFETY KEEP PERSONNEL CLEAR FROM WO
  • Page 27 and 28: DIG WITH CAUTION SAFETY • Acciden
  • Page 29 and 30: PARK MACHINE SAFELY • Unless the
  • Page 31 and 32: PRACTICE SAFE MAINTENANCE SAFETY
  • Page 33 and 34: SUPPORT MACHINE PROPERLY SAFETY •
  • Page 35 and 36: REPLACE RUBBER HOSES PERIODICALLY S
  • Page 37 and 38: Precautions for Handling Flammables
  • Page 39 and 40: PRECAUTIONS FOR WELDING AND GRINDIN
  • Page 41 and 42: PRECAUTIONS FOR HANDLING REFRIGERAN
  • Page 43 and 44: SAFETY SIGNS SS-259 SS-024 SS309048
  • Page 45 and 46: ROPS/TOPS/FOPS Cab SAFETY SIGNS SS4
  • Page 47 and 48: COMPONENTS NAME 4 5 1- Bucket 2- Ar
  • Page 49 and 50: 17- Air Conditioner Control Panel 1
  • Page 51 and 52: MONITOR PANEL 1- Coolant Temperatur
  • Page 53 and 54: OPERATOR’S STATION Alternator Ind
  • Page 55 and 56:

    HOW TO OPERATE TRIP METER OPERATOR

  • Page 57 and 58:

    Auto-Idle Mode Switch OPERATOR’S

  • Page 59 and 60:

    OPERATOR’S STATION Heating Operat

  • Page 61 and 62:

    RADIO 1- Radio/Clock OPERATOR’S S

  • Page 63 and 64:

    OPERATOR’S STATION Tuning Procedu

  • Page 65 and 66:

    OPENING/CLOSING CAB FRONT WINDOW OP

  • Page 67 and 68:

    EMERGENCY EXIT If the operator’s

  • Page 69 and 70:

    BREAKING IN NEW MACHINE BREAK-IN IM

  • Page 71 and 72:

    BEFORE STARTING ENGINE OPERATING TH

  • Page 73 and 74:

    OPERATING THE ENGINE STARTING THE E

  • Page 75 and 76:

    USING BOOSTER BATTERIES OPERATING T

  • Page 77 and 78:

    TRAVEL LEVERS AND PEDALS DRIVING TH

  • Page 79 and 80:

    TRAVEL MODE SWITCH DRIVING THE MACH

  • Page 81 and 82:

    TOWING THE MACHINE DRIVING THE MACH

  • Page 83 and 84:

    PARKING AND STOPPING ON SLOPES DRIV

  • Page 85 and 86:

    CONTROL LEVER (ISO EXCAVATOR PATTER

  • Page 87 and 88:

    OPERATING THE MACHINE CONTROL LEVER

  • Page 89 and 90:

    AUXILIARY PEDAL (OPTIONAL) OPERATIN

  • Page 91 and 92:

    PRECAUTIONS FOR BLADE OPERATION Thi

  • Page 93 and 94:

    WARMING UP OPERATION OPERATING THE

  • Page 95 and 96:

    OPERATING BACKHOE OPERATING THE MAC

  • Page 97 and 98:

    AVOID STRIKING WITH BUCKET OPERATIN

  • Page 99 and 100:

    AVOID HITTING BLADE WITH BUCKET OPE

  • Page 101 and 102:

    OPERATING THE MACHINE 3. Operating

  • Page 103 and 104:

    HYDRAULIC BREAKER (OPTIONAL) OPERAT

  • Page 105 and 106:

    Average Breaker Operating Availabil

  • Page 107 and 108:

    CRUSHER OPERATION (OPTIONAL) OPERAT

  • Page 109 and 110:

    AUXILIARY FLOW RATE CONTROL (OPTION

  • Page 111 and 112:

    3. Lower the boom in the following

  • Page 113 and 114:

    TRANSPORTING BY ROAD TRANSPORTING W

  • Page 115 and 116:

    TRANSPORTING SECURING THE MACHINE T

  • Page 117 and 118:

    LIFTING MACHINE WITH CRANE TRANSPOR

  • Page 119 and 120:

    Class ZX60USB-3 Class MAINTENANCE H

  • Page 121 and 122:

    PREPARE MACHINE FOR INSPECTION/MAIN

  • Page 123 and 124:

    OPENING/CLOSING TANK COVERS MAINTEN

  • Page 125 and 126:

    DAILY INSPECTION Tooth Arm Arm Cyli

  • Page 127 and 128:

    MAINTENANCE GUIDE MAINTENANCE A. GR

  • Page 129 and 130:

    H. ELECTRICAL SYSTEM (See Page 7-51

  • Page 131 and 132:

    MAINTENANCE Fuel Oil IMPORTANT: Use

  • Page 133 and 134:

    A. GREASING Front Joint Pins (Incl.

  • Page 135 and 136:

    (6) Swing cylinder (7) Swing post M

  • Page 137 and 138:

    Swing Bearing --- every 250 hours M

  • Page 139 and 140:

    Tilt Mechanism --- every 250 hours

  • Page 141 and 142:

    MAINTENANCE 5. Remove oil filter (3

  • Page 143 and 144:

    MAINTENANCE Change Gear Oil --- eve

  • Page 145 and 146:

    Check Hydraulic Oil Level --- daily

  • Page 147 and 148:

    Change Hydraulic Oil --- every 1000

  • Page 149 and 150:

    MAINTENANCE Clean Suction Filter---

  • Page 151 and 152:

    Replace Pilot Filter --- every 1000

  • Page 153 and 154:

    Check Hoses and Lines --- daily ---

  • Page 155 and 156:

    Hose Fitting • Metal Face Seal Fi

  • Page 157 and 158:

    MAINTENANCE Quick Coupler 1. Connec

  • Page 159 and 160:

    E. FUEL SYSTEM MAINTENANCE CAUTION:

  • Page 161 and 162:

    Replace Fuel Filter --- every 500 h

  • Page 163 and 164:

    F. AIR CLEANER Clean the Air Cleane

  • Page 165 and 166:

    Check Coolant Level --- daily MAINT

  • Page 167 and 168:

    Change Coolant --- Twice a year (Sp

  • Page 169 and 170:

    H. ELECTRICAL SYSTEM MAINTENANCE IM

  • Page 171 and 172:

    MAINTENANCE Check Electrolyte Speci

  • Page 173 and 174:

    I. MISCELLANEOUS MAINTENANCE Check

  • Page 175 and 176:

    Replace Bucket --- As required MAIN

  • Page 177 and 178:

    Loosen Track (Rubber Crawler) MAINT

  • Page 179 and 180:

    MAINTENANCE Installing Rubber Track

  • Page 181 and 182:

    Loosen Track (Steel Crawler) MAINTE

  • Page 183 and 184:

    Check Air Conditioner --- daily MAI

  • Page 185 and 186:

    MAINTENANCE CAUTION: Use reduced co

  • Page 187 and 188:

    MAINTENANCE Check, Clean and Functi

  • Page 189 and 190:

    MAINTENANCE Check Tightening Torque

  • Page 191 and 192:

    Tightening Torque Chart Bolt Dia. W

  • Page 193 and 194:

    PREPARATION FOR INSPECTION AND MAIN

  • Page 195 and 196:

    TILTING FLOOR DOWN WARNING: Do not

  • Page 197 and 198:

    CONSUMABLE PARTS LIST Filter Elemen

  • Page 199 and 200:

    MAINTENANCE UNDER SPECIAL ENVIRONME

  • Page 201 and 202:

    STORING THE MACHINE STORAGE 1. Thor

  • Page 203 and 204:

    Engine will not start TROUBLESHOOTI

  • Page 205 and 206:

    TROUBLESHOOTING ENGINE Problem Caus

  • Page 207 and 208:

    TROUBLESHOOTING ENGINE Problem Caus

  • Page 209 and 210:

    TROUBLESHOOTING ELECTRICAL SYSTEM P

  • Page 211 and 212:

    TROUBLESHOOTING CONTROL LEVERS Prob

  • Page 213 and 214:

    TROUBLESHOOTING HYDRAULIC SYSTEM Pr

  • Page 215 and 216:

    SPECIFICATIONS SPECIFICATION Type Z

  • Page 217 and 218:

    SHOE TYPES AND APPLICATIONS SPECIFI

  • Page 219 and 220:

    ADDITIONAL COUNTERWEIGHT The mass v

  • Page 221 and 222:

    A AM/FM Radio Operation............

  • Page 223 and 224:

    Towing the Machine ................

Neuson Zero-Tail Swing Excavator 50Z3/6003 - Chase Plant Hire
Get inspired by - Green Design Plant Hire
Ridgway Rentals Plant Machinery Guide May 17
3. Fusarium mycotoxins in cereals - Plant Research International ...
4878 JS200W Spec (Iss2) (UK) - Flannery Plant Hire
Quick Coupler Safety Quick Coupler Safety - Flannery Plant Hire
s130 skid-steer loader specifications - Ringby Plant Hire Ltd
MINIMIX 150 - Rapid Plant and Tool Hire
ALR 900 | AVR 1100 - PSM PLANT & TOOL HIRE CENTRES LTD
New Copy of Stock List Hire Rates - Baileys Plant Hire Ltd
Hiring cell gatekeepers - ABC transporters in plant ... - BioTechnologia
15. LOADERS - CPHA - Contractors Plant Hire Association
Pacific Coast Canola Begins Hiring for New Plant - Legumex Walker ...
JCB TRACKED EXCAVATOR | JS130 L T.A.B. - Exuma Plant Hire
Hilti - TE15-C - Light Duty Electric Breaker - Exsel Plant & Tool Hire Ltd
CES 3 2011 Hire of Plant SCHEDULES - Drakenstein municipality
Construction Plant World - 28th June 2018
Atlas Copco Portable air compressors Series 7, - Plant Hire UK Limited