Views
5 years ago

0712-0299ZX60USB-3 - Flannery Plant Hire

0712-0299ZX60USB-3 - Flannery Plant Hire

STARTING THE ENGINE

STARTING THE ENGINE OPERATING THE ENGINE Starting in Ordinary Temperature 1. Check that pilot control shut-off lever (1) in the LOCK position. 2. Turn engine control dial (3) to the slow idle position. 3. Sound the horn to alert bystanders. 4. Turn key switch (2) to rotate the starter. The engine will be started. IMPORTANT: Prevent starter damage and/or battery over discharge. Never run the starter for more than 20 seconds at a time. If the engine fails to start, return the key switch to OFF. Wait for more than 30 seconds, then try again. 5. Release key switch (2) immediately after the engine has started. It will automatically return to the ON position. NOTE: The horn sounds even though the key switch is turned OFF. The engine does not start unless the pilot control shut-off lever is in the LOCK position. IMPORTANT: Avoid operating key switch (2) with stained hands or gloves. 3-2 Engine ON (Auto preheat) Engine OFF Engine Start (Auto Return) 1 2 M1M0-03-001 3 M1M0-03-002 M588-01-012

OPERATING THE ENGINE STARTING THE ENGINE IN COLD WEATHER 1. Check that pilot control shut-off lever (1) is in the LOCK position. 2. Turn engine control dial (3) to around the middle between the slow and fast idle positions. 3. Sound the horn to alert bystanders. 4. Turn key switch (2) to the「ON」position and hold it in that position until preheat indicator (4) goes OFF. 5. As soon as preheat indicator (4) goes OFF, return key switch (2) to the START position to run the starter. IMPORTANT: Prevent starter damage and/or battery over discharge. Never run the starter for more than 15 seconds at a time. If the engine fails to start, return the key switch to OFF. Wait for more than 30 seconds, then try again. 6. Release key switch (2) immediately after the engine has started. It will automatically return to the ON position. NOTE: Set the engine control dial to the fast idle position to start the engine in an extreme cold weather district. After the engine is started, gradually reduce the engine speed and perform warm-up operation at the medium speed range. 3-3 Engine ON (Auto Preheat) Engine OFF Engine Start 4 (Auto Return) 1 2 M1M0-03-001 3 M1M0-03-002 M588-01-012 M1M7-01-028

Neuson Zero-Tail Swing Excavator 50Z3/6003 - Chase Plant Hire
Ridgway Rentals Plant Machinery Guide May 17
Get inspired by - Green Design Plant Hire
3. Fusarium mycotoxins in cereals - Plant Research International ...
Quick Coupler Safety Quick Coupler Safety - Flannery Plant Hire
4878 JS200W Spec (Iss2) (UK) - Flannery Plant Hire
s130 skid-steer loader specifications - Ringby Plant Hire Ltd
MINIMIX 150 - Rapid Plant and Tool Hire
ALR 900 | AVR 1100 - PSM PLANT & TOOL HIRE CENTRES LTD
Hiring cell gatekeepers - ABC transporters in plant ... - BioTechnologia
15. LOADERS - CPHA - Contractors Plant Hire Association
New Copy of Stock List Hire Rates - Baileys Plant Hire Ltd
Pacific Coast Canola Begins Hiring for New Plant - Legumex Walker ...
JCB TRACKED EXCAVATOR | JS130 L T.A.B. - Exuma Plant Hire
Hilti - TE15-C - Light Duty Electric Breaker - Exsel Plant & Tool Hire Ltd
CES 3 2011 Hire of Plant SCHEDULES - Drakenstein municipality
Construction Plant World - 28th June 2018
Atlas Copco Portable air compressors Series 7, - Plant Hire UK Limited