Views
5 years ago

0712-0299ZX60USB-3 - Flannery Plant Hire

0712-0299ZX60USB-3 - Flannery Plant Hire

OPERATING THE ENGINE

OPERATING THE ENGINE CHECK MACHINE AFTER STARTING ENGINE Check Using the Monitor After the engine has started, check the following points through the monitor. 1. Check that alternator indicator (3) is OFF. In case alternator indicator (3) stays ON, immediately stop the engine. Then, check the alternator and/or battery system for any abnormality. 2. Check that engine oil pressure indicator (2) is OFF. In case engine oil pressure indicator (2) stays ON, immediately stop the engine. Then, check the engine oil pressure system and/or the oil level for any abnormality. IMPORTANT: In case any abnormality is found in the monitor, immediately stop the engine. Trace the cause of the problem. 3. Check that system failure indicator (5) is OFF. In case system failure indicator (5) stays ON, immediately stop the engine and contact your authorized dealer. 3-4 5 2 3 M1M7-01-028

USING BOOSTER BATTERIES OPERATING THE ENGINE WARNING: An explosive gas is produced while a battery is in use or being charged. Keep flames or sparks away from the battery area. Park the machine and booster battery machine on a dry, firm or concrete surface, not on steel plates. If the machine and/or the booster battery machine are parked on steel plates, dangerous sparks may be unexpectedly created on the machine. Never connect a positive terminal to a negative terminal, as a dangerous short circuit will occur. IMPORTANT: The machine electrical system is a 12 volt negative (-) ground. Use only 12 volt booster battery with the capacity enough to start this machine. When the machine battery is exhausted, start the engine using a booster battery as shown below. Connecting Booster Cables 1. Stop the engine of the booster battery machine. 2. Connect one end of red cable (1) to the positive (+) terminal of the machine battery and the other end to the positive (+) terminal of the booster battery. 3. After connecting one end of the black cable (2) to the negative (-) terminal of the booster battery, connect the other end to hydraulic oil tank cover hinge (3) on the machine. Be alert to sparks that may be produced in the last connection to the hydraulic oil tank cover hinge. 4. After securely connecting the booster cables, start the engine of the booster battery machine. Run the engine at a middle speed. Then, start the engine of this machine. 5. After the engine is started, disconnect booster cables (1 and 2) following the procedures below. Disconnecting Booster Cables 1. Disconnect black booster negative (-) cable (2) from hydraulic oil tank cover hinge (3) first. 2. Disconnect the other end of black booster negative (-) cable (2) from the booster battery. 3. Disconnect red booster positive (+) cable (1) from the booster battery. 4. Disconnect red booster positive (+) cable (1) from the machine battery. 3-5 1 2 Booster Battery (Black) (Red) Connect one end of black cable (2) to the machine frame. Connect one end of red cable (1) to the positive (+) terminal Machine Battery 3 M503-03-002 M1M7-03-004

Ridgway Rentals Plant Machinery Guide May 17
colour - Green Design Plant Hire
WARNING - Flannery Plant Hire
Untitled - Flannery Plant Hire
Untitled - Flannery Plant Hire
Untitled - Flannery Plant Hire
Untitled - Flannery Plant Hire
GP.SERVICES - Sonic Plant Hire
Untitled - Flannery Plant Hire
MINIMIX 150 - Rapid Plant and Tool Hire
EC13 - Plant Hire UK Limited
Ec13 - Plant Hire UK Limited
plant list - Belmont Engineering
8457 JS145HD Spec (UK) Issue 3
Forms 3 More Form Controls - Portia Plante