Views
5 years ago

vero uk training material - VCAM TECH Co., Ltd

vero uk training material - VCAM TECH Co., Ltd

Adding Water

Adding Water Connectors to Channel 11 and 14 At this stage we will be adding water connectors to channels 11 and 14 Select Channel 11 from the tree. Select the Z81 connector and adjust he parameters as shown below. VISI Mould - Cooling Channel Layout In the properties panel for Channel 11 click on the Browse icon in the Element 1 parameter box. Adjust the parameters shown in the highlighted boxes. The diagram below shows the hose connector and clearance holes in position on the channel. NOTE: - REPEAT THIS TASK FOR CHANNEL 14 NOTE: - Switch on the STANDARD layer is you cannot see the element. Vcamtech Co., Ltd 8

VISI Mould - Cooling Channel Layout At this stage you should have 2 connectors applied to channel 11 and 14 as shown below. Adding ‘O’ rings HASCO Z98 to the vertical channels . The next task is to add some ‘O’ ring seals to the vertical channels 12 and 13. Adjust the parameters shown in the highlighted boxes. Remember this has to be done for channels 12 and 13. ‘O’ rings shown in position on vertical channels 12 and 13. Vcamtech Co., Ltd 9

YT-1200 - YOUNG TECH Co., Ltd.