Views
5 years ago

vero uk training material - VCAM TECH Co., Ltd

vero uk training material - VCAM TECH Co., Ltd

Configuring the Mould Base First we need to select the Mould Tool command and select the two plates: - Select Mould | Mould Tool Pick the fixed half insert to begin the mould configuration. VISI Mould - Tool Build Tutorial A rapid building of plates will now occur and the side docked Tool Assembly dialog box will appear. Note that by default the system uses the Hasco database. We will be using this database for our mould tool design. The tool has been created only in “Preview Mode” meaning we have not committed to this layout at this point in time. Vcamtech Co., Ltd 2

Setting the Tool Options VISI Mould - Tool Build Tutorial The first thing that we will do is set up the specific parameters that relate to our tool design, such as insert width, gap between plates etc. Select the options button as shown. The following dialogue box will appear, set the parameters as shown below. Option, Allows you to select the current catalog and template to be used. Tool Origin, Allows you to change the relative position of the tool to the currently selected workplane. Once finished setting the parameters, select ‘OK’. Select the Options button. A clearance gap of 5mm and 15mm above and below the origin is required. A total gap of 20mm is applied between the two Z20 plates. We require at least 30mm and 10mm clearance in X and Y from the edge of the insert to the centre of the column. A suitable plate size is then selected from the Hasco database based on these values. Vcamtech Co., Ltd 3

YT-1200 - YOUNG TECH Co., Ltd.