Views
5 years ago

9.07.2010 - Village of Deerfield

9.07.2010 - Village of Deerfield

TO: FROM: Date: Subject:

TO: FROM: Date: Subject: INTERDEPARTMENTAL MEMORANDUM Mayor Rosenthal and Board ofTrustees Kent Street, Village Manager June 17,2010 Temporary Village Parking (Lindemann Properties) Clean Up Plan Introduction Following the Board's discussion ofthe proposed clean-up plan for the Village parking lots in the NW Quadrant along Deerfield Road at the last meeting, staff has coordinated the removal of guard rails and unnecessary curbing, provided pavement patching and seal-coating ofthe parking lots will be completed next week. As decided June i h , the Board agreed to consider temporary parking lot striping at its June 21, 2010 meeting. Conceptual Temporary Striping Plans Two temporary parking lot striping plans are attached and provided for your information and consideration. The first concept plan (A) was developed to reflect input from resident Larry Dondanville (one-way aisles, angled parking spaces and truck loading) and an enhanced landscape buffer along Deerfield Road as suggested by the VCDC. The second concept plan (B) is an evolution ofthe previous staff developed plan to include improved huck turning and loading opportunities and maintain approximately the same number ofparking spaces as in the current lot configuration. A summary comparison of the two concept plans is provided below: Temporary Striping Plan # of Spaces Deerfield Road Landscape buffer # ofDisabled Spaces # ofBike racks Project Cost Estimate 87 18 feet wide 4 o $51,700 140 5 feet wide 4 2 $40,000 Plan Commission and VCDC Comments At its meeting on June 10,2010, the Plan Commission discussed the two concept plans at the preliminary design stage and agreed that Plan A was clearly a substantial change from the current parking lots and should go through the public hearing process to amend the special use. The Plan Commission also agreed that Concept Plan B, although close in number to the existing parking space count, should go through the Special Use public hearing process as well since the parking lot traffic pattern would be changed. As the VCDC did not have a meeting between the 6/7 and 6/21 Board meetings, the concept plans were forwarded to the VCDC members and their comments are provided as attachment C. As you will note, support for added landscaping along Deerfield Road is Page 1 of2

April/May Edition - Deerfield Township, Ohio
LAKELINE VILLAGE
Residents And Businesses - Deerfield Township, Ohio
Village of Spencerport Eastern Village Corridor Concept Study
Village of Shorewood Comprehensive Bicycle Study
June 2012 - Village of Palos Park, Illinois
Winter 2012 - Village of Flossmoor, Illinois
A park and recreation plan for the village of Steger, Illinois
4 Schlitterbahn Waterpark & Sports Village at Fort Lauderdale
Talbott Vineyards in Carmel Valley Village - Wine-n-Travel
park and recreation department fall 2012 ... - Village of Brown Deer
Deerfield Glencoe Glenview Highland Park Highwood ... - NSSRA
Open cafes and eateries beside the Eastlakes ... - Eastlakes Village
DLL_Jordan Springs Village Centre Concept Plan.indd - Penrith City ...
Deerfield Point -- Digital Tour Collateral - Stream Realty Partners
12 Codicote Road, Welwyn Village, Welwyn, AL6 9NQ ... - Vebra
Abetenim Arts Village (The UBUNTU Village) - NKA Foundation
Freight Villages in the NYMTC Region
Downtown Revitalization Plan - Village of Saukville
handbook draft - Village of Olympia Fields
Download Village Design Statements: The Way Forward?
Issue 131 - the Pembury Village Website
Winter/Spring - Village of Brown Deer
north-rainier-urban-village-asssessment-final
TETON VILLAGE MIX - Summer 2012- Guide to Teton Village ...
Issue 125 - the Pembury Village Website