Shopping Centres Refurbishment and Redevelopment
Shopping Centres Refurbishment and Redevelopment
Shopping Centres Refurbishment and Redevelopment
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PURPOSE<br />
Key stages of the process<br />
AUDIT AND ‘VIP’<br />
REPORT<br />
1<br />
To demonstrate to<br />
clients why they<br />
should consider<br />
undertaking work<br />
on their centre <strong>and</strong><br />
to show what their<br />
options might be.<br />
These are likely to be<br />
one of the following:<br />
1. Refresh<br />
2. Remodel<br />
3. Redevelop<br />
DESIGN<br />
SCHEME<br />
To work up the<br />
selected option to a<br />
high level of detail,<br />
including drawings,<br />
costs, timing,<br />
appraisals <strong>and</strong> tenant<br />
re-engineering.<br />
6 <strong>Shopping</strong> <strong>Centres</strong> <strong>Refurbishment</strong> <strong>and</strong> <strong>Redevelopment</strong><br />
PROCUREMENT<br />
MONITORING / REALISATION<br />
LEASING / MARKETING<br />
2 3 4<br />
To carry out a<br />
procurement exercise<br />
to put together the full<br />
team of consultants,<br />
contractors <strong>and</strong><br />
suppliers needed to<br />
execute the plan.<br />
To carry out periodic monitoring of the detailed<br />
design <strong>and</strong> construction process to ensure the<br />
agreed plan is being delivered on site.