THE BEBO SYSTEM BY ARMTEC Concrete Arch Bridges

THE BEBO

®

SYSTEM

BY ARMTEC

Concrete Arch Bridges

Fast bridging solutions in spans

to 31 metres


THE BEBO SYSTEM BY ARMTEC

APPLICATIONS

Bridges

Spans of 3 metres and more for highway,

road, railroad, river, cycle path, golf course,

culvert applications and many more.

• highly competitive

• extremely durable

• virtually maintenance free

• low life-cycle costs

• aesthetically pleasing

Tunnels

Cut-and-cover or cover-and-cut with up to 10

metres of fill.

• railways

• highways and transit roads

• utilities, conveyor belts for mass

haulage

• sewage outfalls

• underpasses for industrial areas, airports,

etc.

Custom tunnel sections designed quickly to

owner’s requirements or specific site

conditions.

Grade Separations

Spans up to 31 metres to suit many road

designs.

• Country roads

• Resource roads

• Private developments

• Major roads

• Multiple spans available

“Versatility is what makes the BEBO System so attractive for a multitude of applications”

2


CONCRETE BACKFILLED ARCH STRUCTURES

The E-Series

• 78 elliptical shapes - spans of

3.6 to 25.5 metres

• single and twin leaf precast

elements

• standard overfill heights of 0.4

to 4.5 metres

• dedicated designs for up to 15

metres of overfill for spans up

to 7.3 metres

• dedicated designs for up to 6.0

metres of overfill for spans over

7.3 metres

• most economical shape for the

majority of applications

The C-Series

• 37 circular shapes - spans of

9.1 to 16.5 metres

• twin leaf precast elements

• standard overfill heights of 0.4

to 6.0 metres

• dedicated designs for up to 12

metres overfill

• optimized high overfill

elements and foundations

The T-Series

• shallow arch shapes: span to rise

ratios up to 10:1

• any span between 7 and 31

metres

• ideal for low overfill applications.

3


On of the world’s largest precast overfilled

concrete arches, an E84T BEBO under

construction in Putrajaya, Malaysia.

A short, precast BEBO railroad tunnel

designed to support high overfills and 500

tonne mining trucks.

“The comprehensive BEBO products and

support services is difficult to beat”

BEBO History and Application

BEBO arch development started with the first full size test in Switzerland

in 1965.

• The BEBO arch capitalizes on soil-structure-interaction between the

reinforced concrete arch/foundations and the surrounding fill.

• The first BEBO structures were installed in 1966 and are still in excellent

shape.

• Experience shows that overfilled reinforced

concrete arch bridges are extremely durable

and require little maintenance.

Space saving, flat profile, column free

precast BEBO parking garage under

construction in Germany.

BEBO’s experience over many decades and countless applications instills

confidence.”

Head Office: 370 Speedvale Ave. W., P.O. Box 3000, Guelph, ON N1H 6P2

www.armtec.com

Sales Offices:

Nanaimo, Prince George, Vancouver, Edmonton, Calgary, Lethbridge, Saskatoon, Winnipeg,

Thunder Bay, Sudbury, London, Guelph, Toronto, Peterborough, Chesterville, Forest,

Walkerton, Orangeville, Comber, Montreal, Quebec City, St. Clet, Sackville, Truro, Slemon

Park, Bishop’s Falls and St. John’s. BEBOR/2M/0509