Grant Proposal for Project Name - Biddestone Village
Grant Proposal for Project Name - Biddestone Village
Grant Proposal for Project Name - Biddestone Village
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Questionnaire Results: Traffic and Transport<br />
Traffic using Slaughter<strong>for</strong>d as a<br />
cut-through is causing problems<br />
as well as vehicles being<br />
directed along the narrow lanes<br />
by satellite navigation systems.<br />
Damage to verges by large<br />
vehicles – and said vehicles<br />
getting stuck – is again often the<br />
result of direction by satellite<br />
navigation systems. The council<br />
and police are aware of such<br />
problems.<br />
The increase in size and speed<br />
of agricultural vehicles using the<br />
roads through the parish<br />
sometimes causes problems<br />
especially where the lanes are<br />
narrow and there are few<br />
passing places. An even greater<br />
problem is posed in the<br />
Slaughter<strong>for</strong>d lane network <strong>for</strong><br />
residents and road users alike by<br />
the lack of any specific speed<br />
restrictions.<br />
Allowance has to be made within<br />
a farming community and<br />
respect and understanding of the<br />
needs of the community must be<br />
encouraged.<br />
<strong>Biddestone</strong> & Slaughter<strong>for</strong>d Parish Plan<br />
Narrow lanes and large<br />
vehicles cause problems in<br />
Slaughter<strong>for</strong>d<br />
30