4.1.1.1.2 Mounting in the 19" rack<br />

Recommendations<br />

Before installing the system in a 19" rack, you must verify that:<br />

- The maximum static load (given by the manufacturer) of the 19" rack is greater than the<br />

overall weight of the equipment mounted or to be mounted in the rack.<br />

- Moreover, the weight of the equipment must be evenly distributed between the brackets.<br />

- If mounting the Alcatel-Lucent OmniPCX Office Communication Server module results in<br />

exceeding the load on the front supports (generally the total weight divided by two), the<br />

module must be placed on a fixed tray attached to the four supports of the rack.<br />

4-2 ������������ � ����� � ����� ���� � ������������ ������