ESONET Contract no.036851/<strong><strong>Period</strong>ic</strong> <strong>Activity</strong> <strong>Report</strong>/3 rd <strong>Period</strong><br />

April 2010<br />

2.3 WP 3 – Scientific Objectives and Observatory Design<br />

Persons in charge: Henry Ruhl (h.ruhl@noc.soton.ac.uk)<br />

Contact: +44 23 8059 6365<br />

Institution: NERC-NOCS<br />

Names and institutions of the participating persons:<br />

Task<br />

WP 3 SCIENTIFIC<br />

Persons in charge of Task Teams<br />

OBJECTIVES AND<br />

OBSERVATORY DESIGN<br />

Henry Ruhl NOCS<br />

3a) Scientific objectives Henry Ruhl NOCS<br />

3b) Generic Science modules Jens Greinert NIOZ<br />

3c) Specific science modules Louis Géli IFREMER<br />

2.3.1 Work package objectives and starting point of work at beginning of reporting<br />

period<br />

Henry Ruhl at NERC-NOCS leads WP3 activity. During <strong>Period</strong> 3, the main activities<br />

included updating the D11 and D13. The main activities/tasks of WP3 overall are<br />

3.a.1 – To update scientific objectives;<br />

3.a.2 - To participate in workshops with HERMES, EuroSITES, MERSEA/MyOcean,<br />

EUROCEANS;<br />

3.b.1 – To Update the generic parameters list;<br />

3.b.2 - To establish links between generic technology and scientific needs;<br />

3c - To define specific science modules.<br />

All of these objectives have been achieved to at least a basic level with refinements planned<br />

for <strong>Period</strong> 4.<br />

2.3.2 Progress towards objectives – tasks worked on and achievements made<br />

Task 3a) – Science objectives<br />

<strong>Activity</strong> 3a1: Update of scientific objectives<br />

This was first delivered in period 2 and was updated again during period 3 (D11) including<br />

literature review, input from workshops and feedback from the 2 nd period review. The process<br />

of linking the science objectives to science module design requirements began during <strong>Period</strong><br />

3. The regional implementation groups have been identified in WP1. A key topic of the All<br />

Regions Workshop was indeed to get updates on planning progress for each node from<br />

regional representatives. Breakout groups were set up to further encourage discussion of<br />

regional and site specific concerns. This information is being used to update implementation<br />

plans and identify areas where further input is needed in <strong>Period</strong> 4. NOCS and IFREMER also