20.01.2013 Views

Selection and Testing of Electronic Components for LM

Selection and Testing of Electronic Components for LM

Selection and Testing of Electronic Components for LM

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Operation <strong>and</strong> Maintenance<br />

Characteristics <strong>of</strong> AKE 13<br />

Lars G. Ericsson <strong>and</strong> Åke Persson<br />

This article is devoted primarily to a description <strong>of</strong> the operation <strong>and</strong> maintenance<br />

characteristics <strong>of</strong> AKE 13. The article also gives some examples <strong>of</strong> operational<br />

experience, but this will be described in more detail in a later issue <strong>of</strong> Ericsson<br />

Review. Certain <strong>of</strong> the facilities <strong>of</strong>fered by AKE 13 as regards international <strong>and</strong><br />

intercontinental traffic are also touched upon.<br />

UDC621 395 343 AKE 13 is an SPC system intended <strong>for</strong><br />

medium-sized to very large transit exchanges<br />

<strong>for</strong> national as well as international<br />

<strong>and</strong> intercontinental traffic. The<br />

first version <strong>of</strong> AKE 13, AKE 131 with<br />

control system APZ 130, was taken<br />

into service in Rotterdam in 1971 <strong>and</strong><br />

was then the first SPC transit exchange<br />

in the world <strong>and</strong> also the first<br />

Table 1<br />

AKE 13 exchanges in operation or on order on<br />

o • k~ 1cl 1077<br />

Country<br />

Australia<br />

Czechoslovakia<br />

Denmark<br />

Finl<strong>and</strong><br />

Italy<br />

Mexico<br />

Holl<strong>and</strong><br />

Norway<br />

Sweden<br />

Engl<strong>and</strong><br />

Total:<br />

Exchange<br />

Sydney (1974) - Broadway<br />

Sydney - Paddington<br />

Prag<br />

Ålborg (1974)<br />

Arhus (1977)<br />

Albertslund<br />

Copenhagen (1974)<br />

Hillerod<br />

Odense (1976)<br />

Slagelse<br />

Virum<br />

Helsinki, PLH (1974)<br />

Helsinki, PLH<br />

Helsinki, HT(1976)<br />

Turku (1974)<br />

Bari (ASST)<br />

Napoli(SIP)<br />

Palermo (SIP) (1975)<br />

Padova(SIP)<br />

Verona (SIP)<br />

Salerno (SIP)<br />

Guadalaiara (1975)<br />

Mexico D F (1973)<br />

Monterrey (1975)<br />

Dordrecht (1976)<br />

Rotterdam DC (1971)<br />

Rotterdam INT (1976)<br />

Bergen<br />

Drammen<br />

Oslo (1976)<br />

Skien<br />

Stavanger<br />

Gothenburg, Vrr<br />

Stockholm, FRE (1974)<br />

Stockholm, HY(1976)<br />

London-Thames<br />

multi-processor exchange 1 . However,<br />

Rotterdam was not <strong>LM</strong> Ericsson's first<br />

SPC exchange. AKE 13 was based on<br />

experience gained from the combined<br />

local <strong>and</strong> transit exchange system AKE<br />

12, which was put into operation in<br />

Tumba, outside Stockholm, as early as<br />

1968 2 .<br />

The latest version <strong>of</strong> the system, which<br />

is designated AKE 132 <strong>and</strong> which contains<br />

the new control system APZ 150,<br />

has been described previously 3,5 .<br />

As can be seen from table 1, 18 AKE 13<br />

exchanges have been put into operation<br />

in eight countries in three continents<br />

National<br />

X<br />

X<br />

X<br />

X<br />

X<br />

X<br />

X<br />

X<br />

X<br />

X<br />

X<br />

X<br />

X<br />

X<br />

X<br />

X<br />

X<br />

X<br />

X<br />

x<br />

X<br />

X<br />

X<br />

x<br />

x<br />

X<br />

X<br />

X<br />

X<br />

X<br />

X<br />

X<br />

International<br />

*<br />

X<br />

X<br />

X<br />

X<br />

X<br />

X<br />

•<br />

X<br />

X<br />

X<br />

X<br />

X<br />

Multiple-capacity<br />

in<br />

operation<br />

2 400<br />

9600<br />

12 000<br />

20 400<br />

9 600<br />

15 000<br />

4 000<br />

8 000<br />

3 600<br />

8 400<br />

18 600<br />

6 000<br />

3 600<br />

9600<br />

3 600<br />

9600<br />

2 400<br />

12 000<br />

Oil<br />

order<br />

3 600<br />

7 200<br />

18 000<br />

9600<br />

6 000<br />

7 200<br />

6 000<br />

29 400<br />

8 000<br />

3 200<br />

6 000<br />

6 600<br />

3 600<br />

3 600<br />

4 800<br />

4 800<br />

7 200<br />

1 200<br />

3 600<br />

3 600<br />

2 400<br />

3 600<br />

3600<br />

4 800<br />

16800<br />

158 400 174 400<br />

332 800

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!