�����<br />
Assembly clip for fixed point<br />
Design/Assembly:<br />
g To assembly a fixed point, a p<strong>air</strong> of assembly clips<br />
is required<br />
g The assembly clips can be re-used<br />
Designation For pipe dia. weight Unit Item<br />
mm Size kg Pieces number<br />
Assembly clip 21.3 – 57.0 Size 1a 0.060 2 017151<br />
Assembly clip 60.3 Size 1b 0.075 2 017152<br />
Assembly clip 76.1 – 159.0 Size 2 0.090 2 017153<br />
Assembly clip 168.3 – 355.6 Size 3 0.150 2 017154<br />
Fixed point assembly instructions<br />
Variation A: Pipeline is not yet installed<br />
1. Fix the main casting of the fixed point (1) to the supporting construction (2) (e g. by welding)<br />
2. When installing the pipeline, fix the pipe (6) into the fixed point clamps (3)<br />
Variation B: The pipeline is already installed<br />
1. Screw the fixed point clamps (3) of the main casting of the fixed point (1) onto the pipe (6)<br />
2. Align the main casting of the fixed point (1) and fix it to the supporting construction (2) (e.g. by welding)<br />
3. Place the clamping pads (4) onto the main casting of the fixed point (1) and fix in p<strong>air</strong>s using assembly clips (5)<br />
4. Weld the clamping pads(4) to the pipeline (6)<br />
Technical data:<br />
g Material galvanized acc. to DIN 50961<br />
5. After welding has been completed, remove the assembly clips (5); they can be re-used<br />
The products listed on these page are not in storage; they have a<br />
518 delivery time of around 10 days<br />