Sanitation, heating, air-conditioning (PDF / 6,4 MB - BTI
Sanitation, heating, air-conditioning (PDF / 6,4 MB - BTI
Sanitation, heating, air-conditioning (PDF / 6,4 MB - BTI
- TAGS
- sanitation
- heating
- en.bti.de
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
www.<strong>BTI</strong>-GROUP.COM<br />
07<br />
C<br />
Pos. Designation<br />
1 joint support with board<br />
2 C‑profile 45/40/3<br />
3 joint support<br />
4 Fixed point type A<br />
6 Hex screw M12 x 25<br />
7 U-shim DIN 125, 13.0<br />
8 2-hole thread board M12<br />
�����<br />
Fixed point type A with joint support<br />
Insertion/Assembly instructions:<br />
g Suitable for straight, unbranched fixed point<br />
pipe distances with axial compensator or U bow<br />
expansion compensator<br />
Sketch of system:<br />
FP 1 FP 2<br />
FP 1 FP 2<br />
Parts list for order<br />
compensator<br />
U-bow<br />
compensator<br />
Pos. Amount Unit Designation<br />
g A forced guide bearing is required in the<br />
immediate vicinity of the compensator<br />
1 2 Pieces joint support with board<br />
2 2 Pieces C‑profile 45/40/3<br />
3 1 Pieces Fixed point w th joint support<br />
5 8 Pieces Hex screw M12 x 251<br />
6 8 Pieces U-shim DIN 125, 13.0<br />
7 4 Pieces 2-hole thread board M12<br />
520 1006