12.02.2013 Views

HRD in CBEC - Directorate General of human resource ...

HRD in CBEC - Directorate General of human resource ...

HRD in CBEC - Directorate General of human resource ...

SHOW MORE
SHOW LESS

Transform your PDFs into Flipbooks and boost your revenue!

Leverage SEO-optimized Flipbooks, powerful backlinks, and multimedia content to professionally showcase your products and significantly increase your reach.

CHECK-LIST FOR REVISION OF RENT OF<br />

HIRED PREMISES<br />

(Procedure to be <strong>in</strong>itiated at least 6 months before expiry <strong>of</strong> current<br />

hir<strong>in</strong>g)<br />

1. Initial date <strong>of</strong> hir<strong>in</strong>g premises with rent and details <strong>of</strong> subsequent<br />

revisions <strong>in</strong> rent;<br />

2. M<strong>in</strong>istry’s previous reference/file(s) nos., if any;<br />

3. Copy <strong>of</strong> fair rent certificate issued by CPWD alongwith date on<br />

which the request for assessment was sent by the<br />

Commissioner to CPWD.<br />

4. Copy <strong>of</strong> letter from landlord conta<strong>in</strong><strong>in</strong>g first request for revision<br />

<strong>of</strong> rent/date <strong>of</strong> first request for revision;<br />

5. If the <strong>in</strong>itial hir<strong>in</strong>g/subsequent revisions were done by HOD with<strong>in</strong><br />

delegated powers, then detailed break-up <strong>of</strong> staff strength<br />

(category-wise) and detailed requirement <strong>of</strong> space as per norms<br />

and total space available may also be furnished;<br />

6. Exist<strong>in</strong>g staff strength and space requirement as per norms.<br />

Change, if any, <strong>in</strong> staff strength, etc., after <strong>in</strong>itial hir<strong>in</strong>g;<br />

7. Copy <strong>of</strong> exist<strong>in</strong>g and proposed lease/hir<strong>in</strong>g agreement should<br />

be furnished for perusal;<br />

8. Statement <strong>of</strong> Immovable assets <strong>of</strong> <strong>CBEC</strong> (land & build<strong>in</strong>g) for<br />

the city and necessity for cont<strong>in</strong>u<strong>in</strong>g the hir<strong>in</strong>g arrangement;<br />

9. Any pend<strong>in</strong>g proposal under the consideration <strong>of</strong> DG (<strong>HRD</strong>)<br />

and/or <strong>CBEC</strong> for acquisition <strong>of</strong> land and construction thereon or<br />

acquisition <strong>of</strong> ready built <strong>of</strong>fice accommodation, where this <strong>of</strong>fice<br />

will be shifted after its f<strong>in</strong>alization;<br />

10. Certificate from <strong>Directorate</strong> <strong>of</strong> Estate/CPWD about nonavailability<br />

<strong>of</strong> <strong>General</strong> Pool Accommodation;<br />

59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!