15.02.2013 Views

Module 5: Bioretention Design Specs Details - Melanie Mills

Module 5: Bioretention Design Specs Details - Melanie Mills

Module 5: Bioretention Design Specs Details - Melanie Mills

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Bioretention</strong> w/<br />

Underdrain<br />

Planter!<br />

• Class 2<br />

permeable<br />

• No filter fabric<br />

• No filter layer<br />

• Underdrain<br />

– PVC SDR 35!<br />

– holes downward!<br />

– cleanout!<br />

BIORETENTION DESIGN NOTES<br />

1. Overflow structure required for in-line systems without overflow bypass, Detail 140.<br />

2. Provide spot elevations on civil plans (TBSM, OE, GIE, IE). See Detail 120.<br />

3. Edge condition will vary for new and retrofit projects. Curb details may be modified<br />

for project by civil and geotechnical engineers.<br />

4. Provide capped, threaded PVC cleanout for underdrain, 4" min. dia. with sweep<br />

bend.<br />

5. If check dams are needed, see Concrete Check Dam Detail 131.<br />

6. If Caltrans Class 2 Permeable is not available, substitute Class 3 Permeable with<br />

an overlying 3" deep layer of 3/4" (No. 4) open-graded aggregate.<br />

7. <strong>Bioretention</strong> Soil Media (BSM) specification per BASMAA Soils for Biotreatment or<br />

<strong>Bioretention</strong> Facilities.<br />

8. Plant Selection per LIDI Plant Guidance for <strong>Bioretention</strong> Areas Technical<br />

Assistance Memo (TAM).<br />

9. Mulch (optional) per LIDI Plant Guidance for <strong>Bioretention</strong> Areas TAM. When used,<br />

excavate to allow for specified soil and mulch depths and achieve finished<br />

elevations as shown on plans.<br />

10. Locate energy dissipation cobble only as specified in inlet details - avoid<br />

decorative use.<br />

LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS<br />

Municipality<br />

Department Name<br />

<strong>Bioretention</strong> Area<br />

Planter w/ Underdrain<br />

DRAFT<br />

CONSTRUCTION NOTES<br />

1. Scarify subgrade before installing bioretention<br />

area aggregate and BSM.<br />

2. Install underdrain with holes facing down.<br />

Underdrain discharge elevation shall be near<br />

top of aggregate layer. Underdrain slope may<br />

be flat.<br />

3. Compact each 6" lift of BSM with landscape<br />

roller or by lightly wetting. If wetting, let dry<br />

overnight before planting.<br />

4. Never work within bioretention area limits<br />

during rain or under wet conditions.<br />

5. Keep all heavy machinery outside bioretention<br />

area limits.<br />

detail number<br />

102

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!