Metodología <strong>de</strong> <strong>Costos</strong><br />

(cont..)<br />

• Método “EPA”<br />

Environmental Protection Agency<br />

United States of America<br />

Gol<strong>de</strong>n Sunlight Mine Cost Estimate<br />

Financial Assurance Criteria Breakdow n<br />

Category<br />

Mine Area<br />

Categoria<br />

Zona M ina<br />

Hectares<br />

Hectárea<br />

Total Cost Cost/Hectare<br />

Sumar Coste Coste/Hectárea<br />

Open Pit Rajo Abierto 116 $7.852.192 $67.841 partial pit backfill to prevent pit lake<br />

Un<strong>de</strong>rground Subterráneo<br />

Waste Dumps Bota<strong>de</strong>ros 409 $6.508.196 $15.907 2:1 slopes w ith 0.5 meter covers<br />

Reclamation Leach Dumps Ripios<br />

Recuperación Heap Leach Piles Pila <strong>de</strong> Lixiviación<br />

Source<br />

Controls<br />

Control<br />

fuentes<br />

Water<br />

Management<br />

/Treatment<br />

Gestión/<br />

Tratamiento<br />

<strong>de</strong>l Agua<br />

Tailings Relaves 191 $3.156.594 $16.490 0.3 meter covers<br />

Roads and Misc Caminos, Estanques, Misceláneo 155 $1.470.586 $9.463<br />

Facilities Equipos Edificios 36 $768.135 $21.089<br />

Open Pit Rajo Abierto<br />

Un<strong>de</strong>rground Subterráneo<br />

Waste Dumps Bota<strong>de</strong>ros $2.169.399 Additional 0.5 meter cover non-acid generating material<br />

Leach Dumps Ripios<br />

Heap Leach Piles Pila <strong>de</strong> Lixiviación<br />

Tailings Relaves 110 $2.412.344 $21.996 Additional 0.3 meter cover non-acid generating material<br />

Roads and Misc Caminos, Estanques, Misceláneo<br />

Facilities Equipos Edificios<br />

Interim (Emergency) en el Interin (Emergencia) $14.777.352 Three year interim operations<br />

Rinsing and Drain Dow n Enjuagar con Desaguar<br />

Closure (Short-term) <strong>Cierre</strong>(Corto plazo) $22.373.038 Treatment of 1400 liter per minute cyani<strong>de</strong> and nitrates<br />

Post-Closure (Long-term) Postcierre (Lago plazo) $878.549.586 Treatment of 1400 liter per minute acid mine drainage<br />

Total Sumar $915.699.976<br />

Hazardous Materials Materials Peligroso<br />

Mitigation Mitigación $110.000 Raptor habitat in open pit<br />

Monitoring Monitoreo $461.250 Groundw ater monitoring<br />

Long-Term O&M Lago Plazo Operación con Mantenimiento $2.031.158 Maintenance of stormw ater controls, roads, vegetation<br />

Exploration Exploración<br />

Total Direct Costs Sumar Costes Directos 908 $938.058.087 $1.032.937<br />

Indirect Costs Costes Indirectos 908 $14.708.694 $16.196<br />

Indirect % Indirectos % 2%<br />

Total Sumar 908 $952.766.781 $1.049.133<br />

Net Discount Rate Cuenta Tasa <strong>de</strong> Descuento 3% Based on Montana Department of Environmental Quality policy<br />

Financial Assurance Amount Económico Seguro Sumar 908 $64.089.000 $70.571 Surety Bond w ith full amount immediately re<strong>de</strong>emable<br />